Market Intelligence for EIE483 and EIE484

Open Pre-Solicitation Posted

Solicitation number
W911KB27RWP11
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

PSC
Not on record
Place of performance
Eielson AFB, Alaska 99702, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers Alaska District is conducting a Request for Information to gather market intelligence on optimal project delivery methods for two Military Construction projects at Eielson Air Force Base, Alaska, with responses due by October 29, 2026 at 14:00 Alaska Time.

EIE483 (Joint Mobility Center Expansion) requires design and construction of a 53,809-square-foot Deployment Processing Facility, 38,782-square-foot Hazardous Materials Storage facility, and 25,349 square feet of exterior covered storage canopies, budgeted at $249.2 million over FY27–FY31, with design beginning FY27 and construction starting FY29. EIE484 (225-Bed Permanent Party Dormitory) entails construction of a 127,546-square-foot, three-story dormitory housing 225 unaccompanied enlisted airmen, budgeted at $305 million over FY27–FY31, with design beginning FY27 and construction beginning FY28. Work is performed at Eielson Air Force Base, Alaska.

The Corps seeks industry input on five acquisition strategies: Accelerated Design-Build to Budget (DBtB), Construction Manager at Risk (CM At Risk-OTA), Design-Build (DB-FAR), Design-Bid-Build (DBB-FAR), and Progressive Design-Build (PDB-OTA). Respondents must address project-specific challenges including high groundwater tables, permafrost-affected soils, PFAS and asbestos contamination, limited Alaskan construction windows, proximity to active airfields, mobilization constraints, temporary space requirements, cost drivers, and supply chain risks. The RFI is for market research only; participation is voluntary and does not obligate the Government or affect future proposal eligibility. NAICS code 236220 applies; small business size standard is $45 million.

Notice text

REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE

Notice: This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should a formal solicitation be issued in the future.

NAICS Codes: 

EIE483 and EIE484 - 236220 – Commercial and Institutional Building Construction

(Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.)

Small Business Size Standard: $45 Million

The U.S. Army Corps of Engineers (USACE), Alaska District, has requirements for two separate Military Construction (MILCON) projects at Eielson Air Force Base, Alaska:

  1. EIE483 – Joint Mobility Center Expansion: Design and construct a new Deployment Processing Facility sited relative to the airfield and supporting facilities to be occupied by 354th Logistics Readiness Squadron personnel. The facility will contain areas for the Personnel Deployment Function, Cargo Deployment Function, and Deployment Control Center, plus building support spaces. The Personnel Deployment Function area will contain a non-sterile holding area for processing passengers, a manifesting office for weighing passengers with their gear, a sterile holding area for passengers who have been manifested and are awaiting mission briefing, and a second sterile holding area for mission briefings. The current schedule identifies design starting in FY27 and construction starting in FY29, with a period of performance from FY27 through FY31.
     
  2. EIE484 – 225-Bed Permanent Party Dormitory: Construct a 3-story permanent party dormitory to house 225 unaccompanied enlisted airmen. Construction will include slab-on-grade and steel frame with concrete masonry unit block veneer and insulated metal panel over metal studs at exterior walls. Supporting facilities include 200 parking spaces, extension of steam, water, and sewer utilities, power distribution, and land scaping to service the new facility. Main facility spaces include 225 dormitory units, activity space, communal kitchens, dorm management office, public restroom, laundry, theater/meeting space, elevator, and mechanical/utility space. The current schedule identifies design starting in FY27 and construction start in FY28, with a period of performance from FY27 through FY31.

Estimated Acquisition Magnitudes:

EIE483 – Joint Mobility Center Expansion: Approximately $249.2 million.

EIE484 – 225-Bed Permanent Party Dormitory:  Approximately $305 million.

Planned Acquisition Strategy: The Government anticipates utilizing an Other Transaction (OT) Agreement for each project. The final delivery method has not been determined and may be Progressive Design-Build (PDB) or Construction Manager at Risk (CMAR), as informed by market intelligence and Government requirements.

The Alaska District is conducting market intelligence to assess industry capability and interest in supporting these efforts utilizing an OT Agreement under the authority of 10 U.S.C. § 2808a. This authority permits the Secretary concerned, subject to applicable statutory requirements, to enter into transactions other than contracts, cooperative agreements, or grants for facility repair and construction projects, including planning, design, engineering, prototyping, piloting, and execution. This authority is distinct from the Department of Defense prototype OT authorities commonly associated with 10 U.S.C. § 4021 and 4022. The Government will use market-intelligence responses to inform the appropriate delivery method, acquisition approach, and project-specific terms for each requirement.

The anticipated delivery approach is expected to include the following phases, subject to the final acquisition strategy and project-specific solicitation terms:

  1. Phase 1: Design and Pre-Construction Services. The OT Awardee shall collaborate with the Government and, as applicable, the Designer of Record (DOR) or project design team to support scope validation, constructability, cost estimating, schedule development, risk management, design coordination, and development of a proposed construction price.
  2. Phase 2: Final Design and Construction. Upon reaching an agreed-upon level of design and completion of pre-construction activities, the Awardee may submit a proposed Guaranteed Maximum Price (GMP) or other agreed-upon construction price, as identified in the applicable solicitation. If the Government accepts the proposed price, the Government may authorize construction execution. If the parties cannot reach agreement on price or other required terms, the Government retains an off-ramp to complete the requirement through an alternative acquisition or delivery method.

SUBMISSION INSTRUCTIONS: Please see the attached Market Intelligence Questionnaire pdf and email your response to Mark Corn (Mark.R.Corn@usace.army.mil), Kim Tripp (Kimberly.D.Tripp@usace.army.mil), Theresa Afrank (Theresa.M.Afrank@usace.army.mil), and Jennifer Gosh (Jennifer.Gosh@usace.army.mil) by 29 October 2026 at 14:00 Alaska Time. Any questions regarding the requirement or issues please reach out to Mark Corn and Kim Tripp.

Files

File Type Posted
Market Intelligence Questionnaire EIE483 EIE484.pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
Market Intelligence for EIE480 and EIE482 Eielson AFB, Alaska, United States ENDIST Alaska No set-aside
JBR041 – Pallet Processing Facility/JBR044 – Rapid Deployment Facility Jber, Alaska 99506, United States · NAICS 236220 Department of Defense No set-aside
EIE485 Consolidated Munitions on Quarry Hill, Eielson AFB, AK Eielson AFB, Alaska, United States · NAICS 236220 Department of Defense No set-aside
RFI: Fort Wolters H Barracks Mineral Wells, Texas 76067, United States · NAICS 236220 ENDIST Fort Worth No set-aside
B-21 Field Training Detachment Facility, Dyess AFB-OT Feasibility & Business Feedback NAICS 236220 ENDIST Fort Worth No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity