Maintenance dredging of Boat Basin
Award Notice Posted
- Solicitation number
- 70Z08818RPQQ23500
- Agency
-
Coast Guard
Department of Homeland Security
- Awarded
- to Lind Marine LLC
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- 70Z08818CPQQ23500 Federal contract award
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
- Place of performance
- US Coast Guard Station Vallejo Vallejo, California Vallejo, California 94590, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Furnish all labor, equipment, transportation and supervision necessary to conduct maintenance dredging at the U.S. Coast Guard Station Vallejo, Vallejo Municipal Marina (Vallejo Marina), 2 Harbor Way, Vallejo, California, in accordance with specifications, amendments 0001 through 0004 and any additional reference documents provided by the Government.
Dredged sediment disposal site is at Cullinan Ranch Restoration Project near Mare Island.
Update #2 ·
NOTE: The Pre-Solicitation for this project was issued under 70Z08818RPQQ23500.
The new number is: 70Z08818BPQQ23500
Please conduct your electronic search using both numbers until the correction is made.
Update #1 ·
Work Includes: Conduct maintenance dredging of up to 16,000 cubic yards (cy) at the U.S. Coast Guard (USCG) Station Vallejo, located within the City of Vallejo Municipal Marina (Vallejo Marina) at 2 Harbor Way, Vallejo, California. The work includes dredging to a permitted design depth of -10 feet (ft.) mean lower low water (MLLW) plus a 1ft. over depth allowance.
The sediment shall be removed using a mechanical clamshell dredge and transported by barge for disposal at a Contractor furnished approved beneficial reuse site, either Montezuma Wetlands Restoration Project in Collinsville or Cullinan Ranch Restoration Project near Mare Island. Up to 2,000 cy may be disposed of at the Government furnished Carquinez Strait In-Bay Disposal Site (SF-9). It is the contractor’s responsibility to ensure the beneficial reuse site(s) is available to receive the sediment. It is also the Contractor’s responsibility to provide the necessary equipment to access and dispose of the sediment at the selected site(s). All in-water work shall be completed during the approved in-water work window of June 1 to November 30, 2018
Files
| File | Type | Posted |
|---|---|---|
| Amendment_0004.pdf | ||
| Amendment_0002.pdf | ||
| Wage_Determination.pdf | ||
| Amendment_0001.pdf | ||
| Award_SF-1442_Signed.pdf | ||
| Contract_Award_70Z08818CPQQ23500.pdf | ||
| Amendment_0003.pdf | ||
| Abstract_Signed.pdf | ||
| Amendment_0004_for_IFB_70Z08818BPQQ23500.pdf | ||
| SECTION__B_Revised_-_IFB_70Z08818BPQQ23500.pdf | ||
| Amendment_0003_for_IFB_70Z08818BPQQ23500.pdf | ||
| PQQ235_Amendment_0002.pdf | ||
| 2018_USCG_STA_VALLEJO_PCH_R2.dwg | DWG drawing | |
| 2018_USCG_STA_VALLEJO_PD_ft_MLLW.XYZ | XYZ file | |
| PQQ235_Amendment_0001.pdf | ||
| Wage_Determination_1.pdf | ||
| SF-1442-PQQ235.pdf | ||
| Wage_Determination_1.pdf | ||
| Invitation_For_Bid_PQQ235.docx | DOCX document |
Show all 19
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity