Maintenance dredging of Boat Basin

Award Notice Posted

Solicitation number
70Z08818RPQQ23500
Agency
Awarded
to Lind Marine LLC
Set-aside
No set-aside

Opportunity facts

Contract number
70Z08818CPQQ23500 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
US Coast Guard Station Vallejo Vallejo, California Vallejo, California 94590, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Furnish all labor, equipment, transportation and supervision necessary to conduct maintenance dredging at the U.S. Coast Guard Station Vallejo, Vallejo Municipal Marina (Vallejo Marina), 2 Harbor Way, Vallejo, California, in accordance with specifications, amendments 0001 through 0004 and any additional reference documents provided by the Government.

Dredged sediment disposal site is at Cullinan Ranch Restoration Project near Mare Island.

Update #2 ·

NOTE: The Pre-Solicitation for this project was issued under 70Z08818RPQQ23500.

The new number is: 70Z08818BPQQ23500

Please conduct your electronic search using both numbers until the correction is made.

Update #1 ·

Work Includes: Conduct maintenance dredging of up to 16,000 cubic yards (cy) at the U.S. Coast Guard (USCG) Station Vallejo, located within the City of Vallejo Municipal Marina (Vallejo Marina) at 2 Harbor Way, Vallejo, California. The work includes dredging to a permitted design depth of -10 feet (ft.) mean lower low water (MLLW) plus a 1ft. over depth allowance.
The sediment shall be removed using a mechanical clamshell dredge and transported by barge for disposal at a Contractor furnished approved beneficial reuse site, either Montezuma Wetlands Restoration Project in Collinsville or Cullinan Ranch Restoration Project near Mare Island. Up to 2,000 cy may be disposed of at the Government furnished Carquinez Strait In-Bay Disposal Site (SF-9). It is the contractor’s responsibility to ensure the beneficial reuse site(s) is available to receive the sediment. It is also the Contractor’s responsibility to provide the necessary equipment to access and dispose of the sediment at the selected site(s). All in-water work shall be completed during the approved in-water work window of June 1 to November 30, 2018

Files

File Type Posted
Amendment_0004.pdf PDF
Amendment_0002.pdf PDF
Wage_Determination.pdf PDF
Amendment_0001.pdf PDF
Award_SF-1442_Signed.pdf PDF
Contract_Award_70Z08818CPQQ23500.pdf PDF
Amendment_0003.pdf PDF
Abstract_Signed.pdf PDF
Amendment_0004_for_IFB_70Z08818BPQQ23500.pdf PDF
SECTION__B_Revised_-_IFB_70Z08818BPQQ23500.pdf PDF
Amendment_0003_for_IFB_70Z08818BPQQ23500.pdf PDF
PQQ235_Amendment_0002.pdf PDF
2018_USCG_STA_VALLEJO_PCH_R2.dwg DWG drawing
2018_USCG_STA_VALLEJO_PD_ft_MLLW.XYZ XYZ file
PQQ235_Amendment_0001.pdf PDF
Wage_Determination_1.pdf PDF
SF-1442-PQQ235.pdf PDF
Wage_Determination_1.pdf PDF
Invitation_For_Bid_PQQ235.docx DOCX document
Show all 19

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors