Amendment_0002.pdf
PDF 47 KB Posted
- Attached to
- Maintenance dredging of Boat Basin
- Solicitation number
- 70Z08818RPQQ23500
About this file
Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0003.pdf | ||
| Amendment_0004.pdf | ||
| Award_SF-1442_Signed.pdf | ||
| Contract_Award_70Z08818CPQQ23500.pdf | ||
| Amendment_0001.pdf | ||
| Wage_Determination.pdf | ||
| Abstract_Signed.pdf | ||
| Amendment_0004_for_IFB_70Z08818BPQQ23500.pdf | ||
| SECTION__B_Revised_-_IFB_70Z08818BPQQ23500.pdf | ||
| Amendment_0003_for_IFB_70Z08818BPQQ23500.pdf | ||
| PQQ235_Amendment_0002.pdf | ||
| 2018_USCG_STA_VALLEJO_PD_ft_MLLW.XYZ | XYZ file | |
| 2018_USCG_STA_VALLEJO_PCH_R2.dwg | DWG drawing | |
| Wage_Determination_1.pdf | ||
| SF-1442-PQQ235.pdf | ||
| PQQ235_Amendment_0001.pdf | ||
| Wage_Determination_1.pdf | ||
| Invitation_For_Bid_PQQ235.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 1
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable) 0002 31 July 2018 21-18-888PQQ235 6472866
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE Contracting Officer USCG CEU Oakland 1301 Clay Street 7th Floor, Suite 700N Oakland, CA 94612-5203
Same as Block 6
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9A AMENDMENT OF SOLICITATION NO.
ALL PROSPECTIVE OFFERORS
X 70Z08818BPQQ23500
9B. DATE (SEE ITEM 11)
July 09, 2018
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
U.S. COAST GUARD STATION VALLEJO DREDGING PROJECT, VALLEJO, CALIFORNIA.
PROJECT NO. 6472866.
The purpose of this amendment is to:
1. Revise scope of work to request separate cost for disposal of dredged sediment at two locations: Montezuma
Wetlands Restoration Project in Collinsville and Cullinan Ranch Restoration Project near Mare Island.
2. Provide response to prospective Contractors RFI
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
JEFFREY A CROSS, Senior Field Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS
EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243
Request For Proposal Number: 70Z08818BPQQ23500 Amendment 0002 31 July 2018
SECTION 01 01 00 - GENERAL PARAGRAPHS – PART 1 GENERAL - 1.01 A. Paragraph 1 is revised to add:
“Contractors shall include in their overall Bid a separate cost for disposal at each location, Montezuma Wetlands Restoration Project in Collinsville and Cullinan Ranch Restoration Project near Mare Island”
1. QUESTION: While the Hydrographic Survey, Station Vallejo Dredging was provided with the solicitation as a pdf, it would be extremely helpful to have this survey data in it's raw electronic XYZ file format from the most recent survey for Solicitation 70Z08818BPQQ23500 - Maintenance Dredging
- U.S. Coast Guard (USCG) Station Vallejo, located within the City of Vallejo Municipal Marina (Vallejo Marina).
ANSWER: Copy of the hydrographic survey in .xyz and .dwg formats will be uploaded with this amendment in FEDBiz Ops.
2. QUESTION: Please clarify the bid delivery process - Is it possible to hand deliver our bid to the Oakland US Coast Guard Civil Engineering Unit?
ANSWER: Yes, Bid package can be delivered to:
Contracting Officer USCG CEU Oakland Attn: Denver Johnson 1301 Clay Street 7th Floor, Suite 700N Oakland, CA 94612-5203
3. QUESTION: How and when will we be notified where we will be taking the dredged materials from this job? There is a tremendous cost difference to take materials to each site. Will we hear before the job bids? If not we have no recourse than to bid it at the highest cost.
ANSWER: The Coast Guard anticipates receiving the suitability determination and dredge episode approval from the regulatory agencies no later than 1 October 2018. The Coast Guard will forward a copy of the suitability determination upon receipt, which will determine the beneficial reuse site(s) the Contractor may use. Note: Please see SECTION 01 01 00 above.
4. QUESTION: What is the liquidated damage amount?
ANSWER: There are no liquidated damage amount for this project.