Amendment_0003_for_IFB_70Z08818BPQQ23500.pdf

PDF 46 KB Posted

Attached to
Maintenance dredging of Boat Basin
Solicitation number
70Z08818RPQQ23500
Issued by

About this file

Amendment 0003 for IFB 70Z08818BPQQ23500

View the file

Other files

File Type Posted
Amendment_0002.pdf PDF
Amendment_0003.pdf PDF
Amendment_0004.pdf PDF
Award_SF-1442_Signed.pdf PDF
Contract_Award_70Z08818CPQQ23500.pdf PDF
Amendment_0001.pdf PDF
Wage_Determination.pdf PDF
Abstract_Signed.pdf PDF
Amendment_0004_for_IFB_70Z08818BPQQ23500.pdf PDF
SECTION__B_Revised_-_IFB_70Z08818BPQQ23500.pdf PDF
PQQ235_Amendment_0002.pdf PDF
2018_USCG_STA_VALLEJO_PD_ft_MLLW.XYZ XYZ file
2018_USCG_STA_VALLEJO_PCH_R2.dwg DWG drawing
Wage_Determination_1.pdf PDF
SF-1442-PQQ235.pdf PDF
PQQ235_Amendment_0001.pdf PDF
Wage_Determination_1.pdf PDF
Invitation_For_Bid_PQQ235.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 1

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable) 0003 02 Aug 2018 21-18-888PQQ235 6472866

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE Contracting Officer USCG CEU Oakland 1301 Clay Street 7th Floor, Suite 700N Oakland, CA 94612-5203

Same as Block 6

8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9A AMENDMENT OF SOLICITATION NO.

ALL PROSPECTIVE OFFERORS

X 70Z08818BPQQ23500

9B. DATE (SEE ITEM 11)

July 09, 2018

10A. MODIFICATION OF CONTRACT/ORDER

NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority).

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

U.S. COAST GUARD STATION VALLEJO DREDGING PROJECT, VALLEJO, CALIFORNIA.

PROJECT NO. 6472866.

The purpose of this amendment is to:

1. Revise SECTION B of IFB to include separate cost for disposal of dredged sediment at two locations: Montezuma

Wetlands Restoration Project in Collinsville and Cullinan Ranch Restoration Project near Mare Island.

2. Provide response to prospective Contractors RFI

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

JEFFREY A CROSS, Senior Field Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS

EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243

Request For Proposal Number: 70Z08818BPQQ23500 Amendment 0003 02 August 2018

SECTION B of IFB (Page 4 of 45) is revised for potential Contractors to show separate cost for disposal of dredged sediment at two locations: Montezuma Wetlands Restoration Project in Collinsville and Cullinan Ranch Restoration Project near Mare Island. Copy of the revised “SECTION B” will be uploaded to FEDBiz Ops with this amendment.

1. QUESTION: Amendment 3 of the BCDC Permit indicates that the additional volume authorized must be completed by August 22, 2018. Please clarify if an extension has been requested for the BCDC permit.

ANSWER: The Coast Guard has requested an extension of all of its permits through November 30th, 2018. The Coast Guard anticipates receiving approval no later than 1 October 2018.

2. QUESTION: The Scope of Work in the Technical Specifications indicates the following:

“All in-water work shall be completed during the approved in-water work window of June 01 to November 30 and coordinated with USCG staff as to not interfere with USCG vessel and Station Vallejo operations.”

All three permits indicate that the dredging window is from August 1 – October 15. Is there an extension to the dredge window that is anticipated?

ANSWER: The Coast Guard has requested the in-water work window be extended through November 30th, 2018. The Coast Guard anticipates receiving approval no later than 1 October 2018

3. QUESTION: Can the disposal of dredged sediment be split between the two locations: Montezuma Wetlands Restoration Project in Collinsville and Cullinan Ranch Restoration Project near Mare Island

ANSWER: A suitability determination from the Dredge Material Management Office (DMMO) will determine if one or both of the beneficial reuse options may be used for this project ( Montezuma Wetlands Restoration Project in Collinsville or Cullinan Ranch Restoration Project near Mare Island). If both locations are found suitable for disposal, the Contractor may split the sediment at the Contractor’s discretion. However, note that the Coast Guard is requesting two separate costs for a lump sum to dredge and dispose of the sediment at either location, and will award based on the lowest acceptable bid and per the determination made by the DMMO.

END