Maintenance Dredging and Beach Fill Placement, Cape Cod Canal and Town Neck Beach, Bourne and Sandwich, MA
Closed Solicitation Posted
- Solicitation number
- W912WJ23B0009
- Agency
-
ENDIST New England
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation from the Department of the Army Corps of Engineers Engineering District New England seeks maintenance dredging and beach fill placement services for the Cape Cod Canal and Town Neck Beach areas in Bourne and Sandwich, Massachusetts. The work includes dredging approximately 80,000 cubic yards of sand and gravel from the Cape Cod Canal, East Mooring Basin, and West Mooring Basin and pumping the dredged material onto Town Neck Beach to be graded. Additional optional services include sand fence placement and dune plantings. Bids were due by August 21, 2023 with the work expected to be completed between October 1, 2023 and March 15, 2024.
There is no set-aside designated for this procurement. The NAICS code is 237990 and PSC code is D301. Bids were received from Weeks Marine, Inc., Cashman Dredging & Marine Contracting Co. LLC, and Great Lakes Dredge & Dock Co. LLC. The government estimate was $7,232,500 and bids ranged from $7,472,200 to $10,527,600. The dredging and placement work will remove approximately 80,000 cubic yards total and is to be performed in the Cape Cod Canal and Town Neck Beach areas of Bourne and Sandwich, Massachusetts over a 6-8 week period between October 2023 and March 2024.
Notice text
This project has a hopper dredge (with pump-out capability) only requirement and consists of maintenance dredging and advance maintenance dredging to remove approximately 80,000 cubic yards (cy) of clean sand and gravel from areas in the authorized, 32 foot deep by 500 foot wide, main-ship channel (Canal); the 25-foot-deep East Mooring Basin (EMB), and the 32-foot-deep West Mooring Basin (WMB) features of the Cape Cod Canal, FNP along with the placement of dredged material in a beach fill design on Town Neck Beach in Sandwich, MA. Dredging in the Canal and the EMB and WMB will be to a maximum elevation of -40? Mean Lower Low Water (MLLW) and remove approximately 80,000 cubic yards of sand and gravel. The material dredged from the FNP will be hauled to the east end of the Canal and pumped directly onto Town Neck Beach in Sandwich, MA. where it will be graded. Additional work requested by the Town of Sandwich including sand fence placement and dune plantings will be included as an optional bid item. The dredging and dredged material placement work is expected to take 6-8 weeks to complete. The available work window for the dredging and placement of dredged material is from 1 October 2023 to 15 March 2024.
Files
| File | Type | Posted |
|---|---|---|
| Bid Abstract 23B0009.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Cape Cod Canal Dredging. Bourne/Sandwich, MA | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, Maine | ENDIST New England | Total Small Business | |
| Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island. | ENDIST New England | No set-aside | |
| Fort Eustis Dredge Material Management Area (FEDMMA) | ENDIST Norfolk | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity