M2M B19 first floor renovation
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 140G0322R0003
- Agency
- Office of Acquisitions and Grants US Geological Survey, Department of the Interior
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks design and construction services for the renovation of the first floor of Building 19 at Moffett Field, California. The United States Geological Survey seeks a construction manager as general contractor to provide design phase services on a firm-fixed price basis and optional construction services on a not-to-exceed basis. Proposals for design services are due July 14, 2022 and will be evaluated based on experience, past performance, and project management capabilities. Technical rating will be the most important evaluation criteria followed by price.
No set-aside is designated for this procurement. The place of performance is Moffett Field, California. Construction is estimated to take ten months following a four to six month design phase. Schematic designs from May 2022 show installation of bookcases and demountable drywall systems to define work pods and provide separation within the renovated first floor space. Davis-Bacon wage rates apply and at least 43.5% of subcontracting dollars must go to small businesses.
Notice text
Construction - renovation of building 19 first floor at Moffett Field, CA
Attachments
| File | Type | Posted |
|---|---|---|
| M2M_B19_1F_CMGC_Attch_1_TandCs_v1.docx | DOCX document | |
| Sol_140G0322R0003.pdf | ||
| M2M_B19_1F_CMGC_Attch_2_SOW_v2.docx | DOCX document | |
| USGS_B19_OPTION_2A_to_35_percent.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Construction - renovation of building 19 first floor at Moffett Field, CA | Award Notice | |
| M2M B19 first floor renovation | Solicitation | |
| Construction - renovation of building 19 first floor at Moffett Field, CA | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity