Construction - renovation of building 19 first floor at Moffett Field, CA

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
140G0322R0003
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

This notice seeks a Construction Manager as General Contractor (CMGC) to provide design phase services and optionally renovate the first floor and basement of Building 19 at NASA Ames Research Park in Moffett Field, California for the U.S. Geological Survey (USGS). The CMGC will be required to provide constructability review and cost estimation validation beginning with the 65% design submission. The contract will have firm-fixed-price components for design phase services and a not-to-exceed price for the optional construction phase. Proposals are sought in accordance with FAR Parts 15 and 36, with an anticipated period of performance of six months for design services and eight months for optional construction.

There is no set-aside designated for this procurement. The applicable NAICS code is 236220 for Commercial and Institutional Building Construction with a size standard of $39.5M. The PSC code is Z2AA for Repair or Alteration of Office Buildings. The estimated construction value is over $10M. Target occupancy is no later than September 2023. Questions are due by June 24, 2022 to the contracting officer.

Notice text

Construction - renovation of building 19 first floor at Moffett Field, CA
The U.S. Geological Survey (USGS) intends to renovate the first floor and a portion of the basement of building 19 at NASA Ames Research Park, Moffett Field, CA as part of USGS' broader Menlo-to-Moffett relocation effort. The first floor is approximately 55,000 gross square feet (GSF) and has an intended use as office space. The second floor was abated and renovated in 2018/2019 at approximately 45,000 GSF and sets the overall basis and theme for design of the first floor. Program elements will be very similar, but the first floor will include additional elements beyond standard office space such as media rooms and larger conference facilities. Asbestos and lead paint abatement will be required, and the property is historically significant.
The scope of this acquisition is to contract with a Construction Manager as General Contractor (CMGC) to provide design phase services (such as constructability review, cost estimation validation, etc.) beginning with the 65% design submission, and optionally to renovate the facility when design is complete. USGS has contracted with a separate Architect/Engineer (A/E) firm that is responsible for developing complete design and construction documents for the project. The A/E on this project is AECOM. We are at the conceptual design phase and approaching 35%/schematic design. The scope of this effort does not include commissioning or special inspections. The period of performance is expected to be approximately six months for design-phase services and eight months for construction, some of which may overlap if there is one or more early work packages, such as demolition/abatement. Targeted occupancy is not later than September 2023. The estimated magnitude of construction is more than $10M. The Construction Wage Requirements Statute (prevailing wage, formerly Davis-Bacon Act) will apply to the construction portion of this project. The successful contractor will be required to obtain performance and payment bonds before being given the notice to proceed with construction.

We intend to solicit competitive proposals in accordance with the procedures of Federal Acquisition Regulation (FAR) Parts 15 (Contracting by Negotiation) and 36 (Construction and Architect-Engineer Contracts). The contract will have two components: a firm-fixed-price for design-phase services, and a not-to-exceed price for the optional construction phase. The construction option may only be exercised at a firm-fixed-price. There will be a shared savings incentive, such that if the construction option can be exercised below the not-to-exceed price, the parties will share in the savings 50/50, with the contractor's share obligated to the contract as a separate line item payable upon project completion.

The applicable product/service code is Z2AA, Repair or Alteration of Office Buildings. The applicable NAICS code is 236220, Commercial and Institutional Building Construction, size standard $39.5M. This acquisition is unrestricted.

Prospective contractors do not need to respond to this presolicitation notice. Questions or concerns should be submitted to the Contracting Officer, Jeff Caravelli, jcaravelli@usgs.gov.

END

Notice history

Notice Type Posted
Construction - renovation of building 19 first floor at Moffett Field, CA Award Award Notice
M2M B19 first floor renovation Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Armed Forces Recruiting Building 25 Tenant Improvement and Renovation Project- Sources Sought Notice Lakewood, Colorado 80226, United States · NAICS 236220 — No set-aside
Solicitation: Construct Combat Rescue Helicopter Flight Simulator Facility at Moffett ANGB Moffett Angb, Santa Clara County, California Moffett Field, California 94035, United States · NAICS 236220 California National Guard Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors