USGS_B19_OPTION_2A_to_35_percent.pdf
PDF 1 MB Posted
- Attached to
- M2M B19 FIRST FLOOR RENOVATION Federal contract opportunity
- Solicitation number
- 140G0322R0003
About this file
This document contains details of a federal construction contract opportunity along with an associated government file. The solicitation is for the renovation of the first floor of Building 19 at Moffett Field in California. The work includes installing bookcases and demountable drywall systems to define work pods and provide separation. The solicitation number is 140G0322R0003 and is being conducted by the Department of the Interior's US Geological Survey Office of Acquisitions and Grants. The related government file provides schematic designs approved in May 2022 showing the proposed layout of the renovated first floor space with the installation of bookcases and drywall systems.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| M2M_B19_1F_CMGC_Attch_1_TandCs_v1.docx | DOCX document | |
| Sol_140G0322R0003.pdf | ||
| M2M_B19_1F_CMGC_Attch_2_SOW_v2.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
gschuster Typewritten Text USGS Building 19 1st Floor Schematic Design Approved May 2022 for 35%
Wing Concept 01
Bookcases at ends of work pods to provide storage and separation from circulation
Full height drywall aligned with column grid line.
Demountable System at ends of pods
Demountable system in combination with drywall to provide separation
File details come from the government source that posted it. Updated .