Lower Jemez Fish Structure Project
Awarded Award Notice Posted
- Solicitation number
- AG-8379-S-16-0005
- Agency
- Region 3 - Southwestern Region Forest Service, Department of Agriculture
- Awarded
- to RMC Consultants, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- AG-8379-C-16-0003 Federal contract award
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
- Place of performance
- Below Jemez Springs, NM along the Lower Jemez River Jemez Springs, New Mexico 87025, United States
Notice details come from SAM.gov. Updated .
Notice text
5 versions
Update #5 · Latest ·
Added: Jan 08, 2016 2:50 pm
Modified: Feb 01, 2016 11:28 amTrack Changes
The Government Range is between $100,000.00 and $250,000.00.
A pre-bid meeting, at the project location, will be scheduled after the complete solicitation pacakage and drawings have been posted on FedBizOps. Keep watching this notice for details. While not mandatory, attendance at the pre-bid meeting is highly encouraged for all interested contractors.
The pre-bid meeting previously scheduled for Tuesday, February 02, 2016 at 11:00 AM MDT has been cancelled. The pre-bid meeting will be rescheduled and the details will be posted here on FBO only. It is the responsibility of each prospective contractor to monitor this announcement on FBO for details concerning all aspects of this solicitation.
The pre-bid meeting has been rescheduled for Friday, February 05, 2016 @ 11:00 AM MDT. The location will be the Jemez Ranger District Office at 051 Woodsy Lane, Jemez Springs, NM 87025. This information is also included on the attached SF 30 document. Please read, sign and return with your solicitation response on or before the deadline.
Update #4 ·
Added: Jan 08, 2016 2:50 pm
Modified: Feb 01, 2016 10:10 amTrack Changes
The Government Range is between $100,000.00 and $250,000.00.
A pre-bid meeting, at the project location, will be scheduled after the complete solicitation pacakage and drawings have been posted on FedBizOps. Keep watching this notice for details. While not mandatory, attendance at the pre-bid meeting is highly encouraged for all interested contractors.
The pre-bid meeting previously scheduled for Tuesday, February 02, 2016 at 11:00 AM MDT has been cancelled. The pre-bid meeting will be rescheduled and the details will be posted here on FBO only. It is the responsibility of each prospective contractor to monitor this announcement on FBO for details concerning all aspects of this solicitation.
Update #3 ·
Added: Jan 08, 2016 12:31 pm
Modified: Jan 24, 2016 7:32 pmTrack Changes
Solicitation:
Complete Solicitation documents and drawings will be available on or about January 26, 2016.
Project Title:
Lower Jemez Fish Structure Project
Background:
Nine (9) instream v-notch log structures designed to enhance fish habitat in the lower Jemez River were installed ca. 1989 as part of the larger Lower Jemez River Corridor Project. Seven (7) of these structures remain and are now in various states of failure, resulting in severe riverbed and bank erosion. The Forest Service intends to have the failing v-notch log structures removed from the lower Jemez River, and restore the riverbed and banks to stable condition.
Scope of Contract and Description:
This solicitation is for the river restoration construction of four (4) sections within an approximately 3-mile reach of the Jemez River on the Jemez Ranger District, Santa Fe National Forest. This project includes the one section located at The Bluffs and three sections at the Spanish Queen public use sites, with a bid option that includes San Diego and Las Casitas public use sites separately. The Vista Linda site will not be a part of this contract. The goal of the project is river restoration, focused on reducing erosion and sedimentation associated with the failing structures, including removal of the existing structures and stabilization of the riverbed and banks. A secondary goal is to improve instream habitat within these river sections by reducing the overall bankfull width/depth ratio, which will help reduce water temperatures and increase the quantity of pool habitat. The restoration construction incorporates natural channel design techniques for this Rosgen C3 reach, including the use of large woody debris (LWD) and boulders in the channel and floodplain. Increasing LWD and boulder placement will also increase pool habitat over time as well as promote bar formation and woody riparian vegetation establishment. The NAICS Code is 237990.
The Contractor shall be responsible for the following:
• Removal existing v-notch log structures and disposal of removed material,
• Procurement of all needed material as specified by the design (design provided by the Forest Service),
• Construction of structures as designed.
The Contractor shall furnish all labor, equipment, supervision, transportation, supplies (except those designated as Government furnished), and incidentals to perform all work necessary perform the work specified in the contract.
The performance period will be starting approximately late February early March, 2016. Contract time will be 120 calendar days.
This project is a 100% Small Business Set-Aside Project
Added: Jan 08, 2016 2:50 pm
Modified: Jan 24, 2016 7:32 pmTrack Changes
The Government Range is between $100,000.00 and $250,000.00.
A pre-bid meeting, at the project location, will be scheduled after the complete solicitation pacakage and drawings have been posted on FedBizOps. Keep watching this notice for details. While not mandatory, attendance at the pre-bid meeting is highly encouraged for all interested contractors.
The pre-bid meeting is scheduled for Tuesday, February 02, 2016 at 11:00 AM MDT. The location is the Jemez Ranger District Office in Jemez Springs, NM 87025.
Update #2 ·
Added: Jan 08, 2016 2:50 pm
The Government Range is between $100,000.00 and $250,000.00.
A pre-bid meeting, at the project location, will be scheduled after the complete solicitation pacakage and drawings have been posted on FedBizOps. Keep watching this notice for details. While not mandatory, attendance at the pre-bid meeting is highly encouraged for all interested contractors.
Update #1 ·
Added: Jan 08, 2016 12:31 pm
Pre-Solicitation:
Complete Solicitation documents and drawings will be available on or about January 26, 2016.
Project Title:
Lower Jemez Fish Structure Project
Background:
Nine (9) instream v-notch log structures designed to enhance fish habitat in the lower Jemez River were installed ca. 1989 as part of the larger Lower Jemez River Corridor Project. Seven (7) of these structures remain and are now in various states of failure, resulting in severe riverbed and bank erosion. The Forest Service intends to have the failing v-notch log structures removed from the lower Jemez River, and restore the riverbed and banks to stable condition.
Scope of Contract and Description:
This solicitation is for the river restoration construction of four (4) sections within an approximately 3-mile reach of the Jemez River on the Jemez Ranger District, Santa Fe National Forest. This project includes the one section located at The Bluffs and three sections at the Spanish Queen public use sites, with a bid option that includes San Diego and Las Casitas public use sites separately. The Vista Linda site will not be a part of this contract. The goal of the project is river restoration, focused on reducing erosion and sedimentation associated with the failing structures, including removal of the existing structures and stabilization of the riverbed and banks. A secondary goal is to improve instream habitat within these river sections by reducing the overall bankfull width/depth ratio, which will help reduce water temperatures and increase the quantity of pool habitat. The restoration construction incorporates natural channel design techniques for this Rosgen C3 reach, including the use of large woody debris (LWD) and boulders in the channel and floodplain. Increasing LWD and boulder placement will also increase pool habitat over time as well as promote bar formation and woody riparian vegetation establishment.
The Contractor shall be responsible for the following:
• Removal existing v-notch log structures and disposal of removed material,
• Procurement of all needed material as specified by the design (design provided by the Forest Service),
• Construction of structures as designed.
The Contractor shall furnish all labor, equipment, supervision, transportation, supplies (except those designated as Government furnished), and incidentals to perform all work necessary perform the work specified in the contract.
The performance period will be starting approximately late February early March, 2016. Contract time will be 120 calendar days.
This project is a 100% Small Business Set-Aside Project
Attachments
| File | Type | Posted |
|---|---|---|
| SF-30_Solicitation_Amendment___4_-_AG-8379-S-16-0005_.pdf | ||
| SF-30_Solicitation_Amendment___3_-_AG-8379-S-16-0005_.pdf | ||
| Pre-Bid_Attendee_List_02-05-2016.pdf | ||
| SF-30_Solicitation_Amendment___2_-_AG-8379-S-16-0005_.pdf | ||
| SF-30_Solicitation_Amendment___1_-_AG-8379-S-16-0005_.pdf | ||
| Jemez_River_Fish_Structures_Solicitation_AG-8379-S-16-0005.pdf | ||
| Fish_Structure_Restore_Design_11X17.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Rio Tusas - El Rito - San Antonio Arch Survey | Award Notice | |
| Lower Jemez Fish Structure Project | Award Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity