LOLO NATIONAL FOREST - Upper West Fork Fish Creek Trail Bridge Replacement
Award Notice Posted
- Solicitation number
- 1240LU25C0016
- Agency
-
Region 1 - Northern Region
Forest Service, Department of Agriculture
- Awarded
- to Oregon Woods, Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- 1240LU25C0016-NA Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Montana, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Agriculture Forest Service R1-Northern Region has awarded contract 1240LU25C0016 to Oregon Woods, Inc. for $575,450 to replace a trail bridge on the Lolo National Forest. The contract involves removing and replacing an existing trail bridge and substructure elements on Trail 101 at milepost 3.1 on the Ninemile Ranger District, located within the Great Burn Proposed Wilderness area in Mineral County, Montana. The scope of work includes complete removal and disposal of the existing bridge, structural excavation, foundation installation, furnishing and erecting the replacement bridge structure, adjusting adjacent trail grades, and all incidental work necessary for project completion. This project requires adherence to specific Resource Protection Measures and equipment restrictions due to its location within a proposed wilderness area, and the contract was awarded on August 20, 2025, as a Total Small Business set-aside.
Notice text
The intent of the contract is to remove and replace an existing trail bridge and substructure elements on Trail 101, milepost 3.1 on the Ninemile Ranger District, Lolo National Forest, within the Great Burn Proposed Wilderness. The structure is located in Section 19, Township 13 North, Range 25 West, Mineral County, Montana. The contractor is to furnish the replacement trail bridge structure and substructure.
This project includes, but is not limited to, removing and disposing of the existing trail bridge and substructure elements, structural excavation and installation of foundation components, furnishing, loading, hauling and erecting the bridge, adjustment of adjacent trail grades to match design plans, and all other incidental items necessary to complete the work according to the contract. This project is located within a proposed wilderness area therefore a list of Resource Protection Measures and Restricted Equipment is required for this project
Awarded contract 1240LU25C0016 to OREGON WOODS, INC. for 575450.00 on 2025-08-20.
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Award Notice | |
| LOLO NATIONAL FOREST - Upper West Fork Fish Creek Trail Bridge Replacement | Solicitation | |
| LOLO NATIONAL FOREST - Upper West Fork Fish Creek Trail Bridge Replacement | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity