Loggers Lake and Fourche Dams Early Warning System Cable Extension Alterations Service

Closed Solicitation Posted

This opportunity was awarded. See its 2 award notices in the notice history.

Solicitation number
12444524Q0030
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
517810 All Other Telecommunications
Place of performance
Doniphan, Missouri 63935, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The USDA Forest Service intends to solicit a quotation on a single source basis from AMCI Wireless for the Loggers Lake and Fourche Dams Early Warning System Cable Extension Alterations Service. The scope of work involves modifying the existing Early Warning Systems (EWS) at Loggers Lake and Fourche Lake by installing longer sensor cable lines to account for seasonal drawdown. The work includes purchasing supplies, shipping, travel costs, and field labor. Offers are due by April 22, 2024, at 4:00 PM Eastern and will be evaluated on price and technical capability. The period of performance is from April 29, 2024, to July 31, 2024.

This solicitation is set aside for Total Small Businesses under NAICS code 517810 with a $40 million size standard. The required cable length is 110-ft for Loggers Lake and 170-ft for Fourche Lake. The place of performance is Doniphan, MO 63935, USA. The contract will be awarded to the responsible offeror whose offer is most advantageous to the Government.

Notice text

NOTICE OF INTENT FOR SINGLE SOURCE AWARD - 
The USDA Forest Service intends to solicit a quotation on a single source basis IAW FAR 13.106-1(b)(1)(i) from AMCI Wireless for Loggers Lake and Fourche Dams Early Warning System Cable Extension Alterations.

SCOPE OF WORK
A. Products:
1. The Work consists of the following:
a. Modifying the existing Early Warning Systems (EWS) located at Loggers Lake and Fourche Lake. The existing sensors are not long enough to account for seasonal drawdown in the winter. Once the lakes are drawn down the sensors are left exposed with potential for freeze and damage to the sensor. Longer cable line needs to be installed to prevent this in the future.
b. Work includes the installation of longer sensor cable lines. Loggers Lake needs a total of 110-ft from the base of the EWS pole to the sensor and Fourche needs a total of 170-ft.
c. Includes purchase of supplies, shipping, travel costs, and field labor.


B. Product Delivery, Storage, and Handling:
1. Packing and Shipping:
a. All components of the system shall be delivered to the site in the Manufacturer's packaging, clearly identified with the product type.

2. Storage and Protection:
a. The Contractor shall provide a dry storage area for all components. The storage shall be in accordance with the Manufacturer's recommendations.

Files

File Type Posted
Attachment A - Schedule of Items.docx DOCX document
Attachment C - Wage Determination.pdf PDF
Continuation 1449.docx DOCX document
Attachment B - Statement of Work.pdf PDF
SF1449.pdf PDF

Notice history

Notice Type Posted
Loggers Lake and Fourche Dams Early Warning System Cable Extension Alterations Service Latest Award Notice
Loggers Lake and Fourche Dams Early Warning System Cable Extension Alterations Service Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
USDA Forest Service - Hebgen Lake District Office Network Cabling and IT Room Improvements West Yellowstone, Montana 59758, United States · NAICS 238210 Forest Service Total Small Business
Womble Work Center Fiber Optic Installation Mount Ida, Arkansas 71957, United States · NAICS 238210 Region 8 - Southern Region Total Small Business
Troubleshooting and repair of access control panels on the Superior National Forest Ely, Minnesota, United States · NAICS 561621 Forest Service Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors