Lifting Skids

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912ES24Q0041
Agency
ENDIST St Paul US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
332312 Fabricated Structural Metal Manufacturing
PSC
5450 Miscellaneous Prefabricated Structures
Place of performance
Fountain City, Wisconsin 54629, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Saint Paul District of the U.S. Army Corps of Engineers seeks to procure three lifting skids for dewatering pumps. The skids must be constructed of galvanized steel between 95 to 96 inches long by 53 to 54 inches wide, include a rigid overhead beam rated at 10,000 pounds, and lifting points. Proposals are due by February 20, 2024 and will be evaluated based on compliance with specifications, load testing certification from a professional engineer, and delivery by August 1, 2024 to Fountain City, Wisconsin.

This is a total small business set-aside. The NAICS code is 332312, Fabricated Structural Metal Manufacturing, with a PSC code of 3635, Hoisting Equipment. Each skid must support a minimum 10,000 pound load and be delivered individually to the specified Corps of Engineers facility between the hours of 0700 and 1500 from Monday through Friday, excluding federal holidays, by the required date.

Notice text

3 versions

Update #3 · Latest ·

Scope of Work – Dewatering Pump Flat Lifting Skids (3)

1.  Project Description

The Saint Paul District of the U.S. Army Corps of Engineers (USACE) has issued this solicitation for the procurement of three (3) lifting skids for dewatering pumps for the St. Paul District Corps of Engineers – Maintenance & Repair section in Fountain City, WI.

2.  Project Scope Statement

The current units have deteriorated past a repairable condition.  This project is meant to supply all the major components necessary to replace the current units.  The Maintenance & Repair section will remove the pumps from the old lifting skids and reinstall the pumps on the new skids. Delivery is to be no later than August 1st, 2024.

 3. System Components

Specifications for each dewatering pump lifting skid assembly shall be:

  • Flat lifting skid shall be constructed of steel (no stainless or aluminum) and be equipped with fixed rigid steel rigging assembly that holds up the overhead rigging beam.
  • The skid and rigid steel rigging may be made of square or pipe steel stock, however, these material types can hold water and suffer freeze damage during winter operations. All ends must be fully open to prevent the water from being trapped and ensure galvanizing reaches those surfaces. 
  • The rigid steel rigging shall include an overhead rigging beam (which matches the overall length of the skid) equipped with two stainless steel load rated swivel hoisting points located 24” in from each end of the overhead rigging beam. Stainless steel shackles may be used provided they utilize either a hole in the beam for the shackle pin OR a fixed lifting eye assembly that bolts onto the rigging beam.
  • The overhead rigging beam shall have ¾” holes drilled every 6 inches on center along its length to enable top mounting bracket installations of various pump assembly configurations.
  • All steel components of the lifting skid and rigging assembly shall be entirely galvanized.
  • The flat lifting skid base design shall include a uniform bolt hole pattern grid of 3/4” bolt holes, 12” on center, across the entire area of the base to allow for securing various pump configurations.
  • The flat lifting skid design shall include fork pockets in the base for moving the skid with a fork truck.
  • The steel lifting skid and rigging assembly shall be no larger than 96” long by 54” wide and no smaller than 93” long by 51” wide to allow for rigid brackets and hardware; and the platform shall not have side walls to allow water and debris to flow off it when being pulled from the water (see attached drawing). 84” maximum overall height from ground to top of rigging beam. If utilizing fixed lifting eyes, maximum height of 88” from ground to top of eye.
  • The rigid steel overhead rigging beam shall be orientated the long way over the skid base no higher than 72” and no lower than 71” high from skid floor to bottom of rigging beam (see attached drawing).
  • The flat lifting skid, rigid steel rigging assembly, and the picking points shall all be load rated for no less than 10,000 lbs. and load tested to 125% of load to include certification documentation with delivery.
  • All lifting skid and rigging assembly components must meet ASME B30.20 standards for below-the-hook lifting devices as well as BTH-1 Design for Below the Hook Standard and must also be designed and stamped by a Professional Engineer (PE).
  • Manufacturing drawings and documentation of load ratings shall be provided for each separate lifting skid and rigging assembly.
  • The lifting skid and rigging assembly shall be labeled with the empty skid weight, load capacity, manufacturer model number, and manufacturer serial number.

Delivery Address:

US Army Corps of Engineers

Fountain City Service

431 North Shore Drive

Fountain City, WI 54629

Update #2 ·

Scope of Work – Dewatering Pump Flat Lifting Skids (3)

1.  Project Description

The Saint Paul District of the U.S. Army Corps of Engineers (USACE) has issued this solicitation for the procurement of three (3) lifting skids for dewatering pumps for the St. Paul District Corps of Engineers – Maintenance & Repair section in Fountain City, WI.

2.  Project Scope Statement

The current units have deteriorated past a repairable condition.  This project is meant to supply all the major components necessary to replace the current units.  The Maintenance & Repair section will remove the pumps from the old lifting skids and reinstall the pumps on the new skids. Delivery is to be no later than August 1st, 2024.

 3. System Components

Specifications for each dewatering pump lifting skid assembly shall be:

  • Flat lifting skid shall be constructed of steel (no stainless or aluminum) and be equipped with fixed rigid steel rigging assembly that holds up the overhead rigging beam.
  • The skid and rigid steel rigging may be made of square or pipe steel stock, however, these material types can hold water and suffer freeze damage during winter operations. All ends must be fully open to prevent the water from being trapped and ensure galvanizing reaches those surfaces. 
  • The rigid steel rigging shall include an overhead rigging beam (which matches the overall length of the skid) equipped with two stainless steel load rated swivel hoisting points located 24” in from each end of the overhead rigging beam. Stainless steel shackles may be used provided they utilize either a hole in the beam for the shackle pin OR a fixed lifting eye assembly that bolts onto the rigging beam.
  • The overhead rigging beam shall have ¾” holes drilled every 6 inches on center along its length to enable top mounting bracket installations of various pump assembly configurations.
  • All steel components of the lifting skid and rigging assembly shall be entirely galvanized.
  • The flat lifting skid base design shall include a uniform bolt hole pattern grid of 3/4” bolt holes, 12” on center, across the entire area of the base to allow for securing various pump configurations.
  • The flat lifting skid design shall include fork pockets in the base for moving the skid with a fork truck.
  • The steel lifting skid and rigging assembly shall be no larger than 96” long by 54” wide and no smaller than 93” long by 51” wide to allow for rigid brackets and hardware; and the platform shall not have side walls to allow water and debris to flow off it when being pulled from the water (see attached drawing). 84” maximum overall height from ground to top of rigging beam.
  • The rigid steel overhead rigging beam shall be orientated the long way over the skid base no higher than 72” and no lower than 71” high from skid floor to bottom of rigging beam (see attached drawing).
  • The flat lifting skid, rigid steel rigging assembly, and the picking points shall all be load rated for no less than 10,000 lbs. and load tested to 125% of load to include certification documentation with delivery.
  • All lifting skid and rigging assembly components must meet ASME B30.20 standards for below-the-hook lifting devices as well as BTH-1 Design for Below the Hook Standard and must also be designed and stamped by a Professional Engineer (PE).
  • Manufacturing drawings and documentation of load ratings shall be provided for each separate lifting skid and rigging assembly.
  • The lifting skid and rigging assembly shall be labeled with the empty skid weight, load capacity, manufacturer model number, and manufacturer serial number.

Delivery Address:

US Army Corps of Engineers

Fountain City Service

431 North Shore Drive

Fountain City, WI 54629

Update #1 ·

1.  Project Description

The Saint Paul District of the U.S. Army Corps of Engineers (USACE) has issued this solicitation for the procurement of three (3) lifting skids for dewatering pumps for the St. Paul District Corps of Engineers – Maintenance & Repair section in Fountain City, WI.

2.  Project Scope Statement

The current units have deteriorated past a repairable condition.  This project is meant to supply all the major components necessary to replace the current units.  The Maintenance & Repair section will remove the pumps from the old lifting skids and reinstall the pumps on the new skids. Delivery is to be no later than August 1st, 2024.

 3. System Components

Specifications for each dewatering pump lifting skid assembly shall be:

  • Flat lifting skid shall be constructed of steel (no stainless or aluminum) and be equipped with fixed rigid steel rigging assembly that holds up the overhead rigging beam.
  • The skid and rigid steel rigging shall not be made of square or pipe steel stock as these material types can hold water and suffer freeze damage during winter operations.
  • The rigid steel rigging shall include an overhead rigging beam (which matches the overall length of the skid) equipped with two stainless steel load rated swivel hoisting points located 24” in from each end of the overhead rigging beam.
  • The overhead rigging beam shall have ¾” holes drilled every 6 inches on center along its length to enable top mounting bracket installations of various pump assembly configurations.
  • All steel components of the lifting skid and rigging assembly shall be entirely galvanized with topcoat paint finish in the color safety yellow to allow maximum visibility to the divers during underwater operations.
  • The flat lifting skid base design shall include a uniform bolt hole pattern grid of 3/4” bolt holes, 12” on center, across the entire area of the base to allow for securing various pump configurations.
  • The flat lifting skid design shall include fork pockets in the base for moving the skid with a fork truck.
  • The steel lifting skid and rigging assembly shall be no larger than 96” long by 54” wide and no smaller than 95” long by 53” wide; and the platform shall not have side walls to allow water and debris to flow off it when being pulled from the water (see attached drawing).
  • The rigid steel overhead rigging beam shall be orientated the long way over the skid base no higher than 72” and no lower than 71” high (see attached drawing).
  • The flat lifting skid, rigid steel rigging assembly, and the picking points shall all be load rated for no less than 10,000 lbs. and load tested to 125% of load to include certification documentation with delivery.
  • All lifting skid and rigging assembly components must meet ASME B30.20 standards for below-the-hook lifting devices as well as BTH-1 Design for Below the Hook Standard and must also be designed and stamped by a Professional Engineer (PE).
  • Manufacturing drawings and documentation of load ratings shall be provided for each separate lifting skid and rigging assembly.
  • The lifting skid and rigging assembly shall be labeled with the empty skid weight, load capacity, manufacturer model number, and manufacturer serial number.

Delivery Address:

US Army Corps of Engineers

Fountain City Service

431 North Shore Drive

Fountain City, WI 54629

Hours of Operation:

0700-1500 Monday thru Friday

Closed weekends and Federal Holidays

Attachments

Files attached to this notice, newest first
File Type Posted
24Q0041 0003 Amendment.pdf PDF
Photo of existing pump skid.pdf PDF
24Q0041 0002 Amendment.pdf PDF
24Q0041 0001 Amendment.pdf PDF
Sketch Drawings.pdf PDF
24Q0041 Solicitation.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Lifting Skids Award Award Notice
Lifting Skids This notice · Latest solicitation Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity