Large Shaft Refurbishment

Award Notice Posted

Solicitation number
HSCG40-14-R-30004
Agency
Awarded
to Colonna's Shipyard Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
HSCG4015D30004 Federal IDV award
NAICS code
336611 Ship Building and Repairing
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

The purpose of Amendment 0002 to solicitation HSCG40-14-R-30004 is to; 1) Extend the closing date of the solicitation; 2)modify Part IV, Representations and Instructions under Evaluations Factors for Award; 3) Revise SLIN XXXXAA verbiage within CLIN listing (Attachment 3); 4) Provide responses to Bidders Questions as follows:

1) The solicitation due date is being extended from 9/19/14 at 4:00pm EST to 9/24/14 at 4:00pm EST. This is updated in Part I, The Schedule under SF 1449, Solicitation/contract form, and Part IV, Representations and Instructions under Instructions, conditions, and notice to bidders.


2) In Part IV, Representations and Instructions under Evaluations Factors For Award: Price Evaluation concerning paragraph titled, "SLIN XXXXAB (Material Cost Column of tab Evaluation Entry in Attachment 3)," the following changes were made:


From:
This SLIN represents material costs particular to the type of material used on the respective shaft being repaired. Bidders are to propose Firm-Fixed Prices on tab
"Material List," Attachment 3. The measure of the unit will be identified and require a Firm Fixed Price to be proposed for the base year and to each option year. For evaluation purposes only, the Coast Guard will apply an estimated quantity to each material item to be multiplied by the proposed material price for each SLIN to arrive at an evaluated total cost. For evaluation purposes only, the US Coast Guard will then apply the IGE usage factor to each SLIN XXXXAB (as indicated in tab "Evaluation Entry," Attachment 3). The Coast Guard will calculate the sum of all SLIN XXXXAB for the base year through option year 4 to evaluate the total material price. The Firm-Fixed Prices proposed for the Base year shall be set forth in the contract once awarded.


To:
This SLIN represents material costs particular to the type of material used on the respective shaft being repaired. Bidders are to propose Firm-Fixed Prices on tab "Material List," Attachment 3. The measure of the unit will be identified and require a Firm Fixed Price to be proposed for the base year and to each option year. For evaluation purposes only, the Coast Guard will apply an estimated quantity to each material item to be multiplied by the proposed material price for each SLIN to arrive at an evaluated total cost. For evaluation purposes only, the US Coast Guard will then apply the IGE usage factor to each SLIN XXXXAB (as indicated in tab "Evaluation Entry," Attachment 3). The Coast Guard will calculate the sum of all SLIN XXXXAB for the base year through option year 4 to evaluate the total material price. The Firm-Fixed Prices proposed shall be set
forth in the contract once awarded for the base year and each option year.


3) All SLINs XXXXAA Base year through Option year 4 will be revised as follows:


SLIN XXX5AA through SLIN XX14AA


From:
"For approval, Provide Pre-repair Inspection Report for ****SHAFT**** IAW Section 3.5 of Specification R-243-0459."


To:
"For approval, Provide Pre-repair Inspection Report for ****SHAFT**** IAW Sections 3.4 through 3.7.2 of Specification R-243-0459."


SLIN XX15AA through SLIN XX23AA


From:
"For approval, Provide Pre-repair Inspection Report ****SHAFT****, condition IAW Section 3.5 of Specification R-243-04593, for final machining into ****SHAFT****."


To:
"For approval, Provide Pre-repair Inspection Report ****SHAFT****, condition IAW Sections 3.4 through 3.7.2 of Specification R-243-04593, for final machining into ****SHAFT****."


Bidders Questions and Responses:


1. Question: Should the price per pound of welding wire include the other material components of this operation? These components include but are not limited to
flux, shielding gasses, insulation, thermal wells, etc.


Answer: Yes, the price per pound shall include the other material components of this operation.


2. Question: Due to the volatility of welding material prices can the material fixed prices be negotiated at the renewal of the option years?


Answer: No. The solicitation originally stated, "The Firm-Fixed Prices proposed for the Base year shall be set forth in the contract once awarded," and was an oversight. This will be addressed in amendment 2 of the solicitation as follows:


FROM:
This SLIN represents material costs particular to the type of material used on the respective shaft being repaired. Bidders are to propose Firm-Fixed Prices on tab "Material List," Attachment 3. The measure of the unit will be identified and require a Firm Fixed Price to be proposed for the base year and to each option year. For evaluation purposes only, the Coast Guard will apply an estimated quantity to each material item to be multiplied by the proposed material price for each SLIN to arrive at an evaluated total cost. For evaluation purposes only, the US Coast Guard will then apply the IGE usage factor to each SLIN XXXXAB (as indicated in tab "Evaluation Entry," Attachment 3). The Coast Guard will calculate the sum of all SLIN XXXXAB for the base year through option year 4 to evaluate the total material price. The Firm-Fixed Prices proposed for the Base year shall be set forth in the contract once awarded.


TO:
This SLIN represents material costs particular to the type of material used on the respective shaft being repaired. Bidders are to propose Firm-Fixed Prices on tab "Material List," Attachment 3. The measure of the unit will be identified and require a Firm Fixed Price to be proposed for the base year and to each option year. For evaluation purposes only, the Coast Guard will apply an estimated quantity to each material item to be multiplied by the proposed material price for each SLIN to arrive at an evaluated total cost. For evaluation purposes only, the US Coast Guard will then apply the IGE usage factor to each SLIN XXXXAB (as indicated in tab "Evaluation Entry," Attachment 3). The Coast Guard will calculate the sum of all SLIN XXXXAB for the base year through option year 4 to evaluate the total material price. The Firm-Fixed Prices proposed shall be set
forth in the contract once awarded for the base year and each option year.


3. Question: SLIN AA requires a firm fixed price to accomplish paragraph 3.5 of the specification. Should this requirement be expanded to include paragraphs 3.4 thru 3.7.2 to include all work from the receipt of the shaft to the submission of the inspection report? If not where should this cost be applied?


Answer: Yes


4. Question: The FBO notice states that this is NOT a "Set Aside" opportunity and the contract clause on page 20 bullet (14) does not have an "X" for the Notice of
Total Small Business Aside. However, the SF 1449, Box 10, states this acquisition is a 100% small business set aside. Please confirm if this is a full and
open nation-wide bid or if this is a 100% small business set aside.


Answer: This has been addressed in amendment 1 of the solicitation. This is a 100% set aside for small businesses.


5. Question: The FBO notice states that the Response Date is Sep 19, 2014 at 4:00pm. EST. However, the SF 1449, Box 8, state the offeror due date is Sep 4, 2014. Please clarify what the correct response due date is for this opportunity.


Answer: This question was initially addressed through amendment 1 to the solicitation. The response date of this solicitation is being extended to 09/24/2014 at 4:00pm EST via this Amendment 2.


All Offeror's are required to acknowledge/sign this amendment with their proposal.

Update #1 ·

This amendment is issued as a result of the following clarifications to the solicitation
HSCG40-14-R-30004:

1) In Part II, Contract Clause under FAR 52.212-5 CONTRACT TERMS AND
CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE
ORDERS - COMMERCIAL ITEMS (JUNE 2014) (page 20) of the solicitation, (14) (i)
52.219-6, Notice of Total Small Business Aside (Nov 2011) (15 U.S.C. 644) was
checked. This is to clarify that this solicitation is 100% Set Aside for Small Businesses.


2) Within the SF-1449 document under section 8, the offer due date was updated to
match what is posted on FBO as the offer due date. 9/19/2014 @ 1600 EST


3) In Part IV, Instructions, conditions, and notice to bidders under PROPOSAL
SUBMISSION, the offer due date was updated to match what is posted on FBO as the
offer due date. 9/19/2014 @ 1600 EST


All Offeror's are required to acknowledge/sign this amendment with their proposal.

Files

File Type Posted
Amendment_2.pdf PDF
Solicitation_Large_Shaft.docx DOCX document
Attachment_3_-_Evaluation_Entry_-_Material_List_-_CLIN_List.xlsx XLSX spreadsheet
Amendment_1.pdf PDF
Solicitation_Large_Shaft.docx DOCX document
Attachment_1.pdf PDF
Solicitation_Large_Shaft.docx DOCX document
Attachment_4.pdf PDF
Attachment_2.pdf PDF
Attachment_3_-_Evaluation_Entry_-_Material_List_-_CLIN_List.xlsx XLSX spreadsheet

Notice history

Notice Type Posted
Large Shaft Refurbishment Latest Award Notice
This notice Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors