Attachment_3_-_Evaluation_Entry_-_Material_List_-_CLIN_List.xlsx
XLSX spreadsheet 207 KB Posted
- Attached to
- Large Shaft Refurbishment
- Solicitation number
- HSCG40-14-R-30004
About this file
Updated the Clin Listing
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation_Large_Shaft.docx | DOCX document | |
| Amendment_2.pdf | ||
| Amendment_1.pdf | ||
| Solicitation_Large_Shaft.docx | DOCX document | |
| Attachment_2.pdf | ||
| Attachment_3_-_Evaluation_Entry_-_Material_List_-_CLIN_List.xlsx | XLSX spreadsheet | |
| Attachment_1.pdf | ||
| Attachment_4.pdf | ||
| Solicitation_Large_Shaft.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN_Deliverable List
| Contract CLIN's / Deliverables | ||||||
| Grand Total Cost of Base Year and all Opt Years | $ - 0 | |||||
| Base Year | Base Year Total | $ - 0 | ||||
| CLIN | DESCRIPTION | QTY | UI | PRICE EACH | PRICE TOTAL | USAGE FACTOR |
| 0001 | For approval, Welding Procedure Specifications, Procedure Qualification Records, and Welder Performance Qualifications IAW section 3.8. of specification R-243-0459 | 1 | EA | $__NSP____ | $__NSP____ | 100% |
| 0002 | Receipt Report of Propulsion Shafts @ Contractors facility IAW 3.4.c of specification R-243-0459 | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 0003 | For approval, Individual Pre-repair Inspection Report for ea propulsion shaft listed in Section 1.2 and IAW section 3.5. of specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 100% |
| 0004 | For approval, Post Repair Inspection Report IAW section 3.13.3 of specification R-243-0459 | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 0005 | Delivery Receipt Inspection of Completed Propulsion Shaft. | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 0006 | 140 WTGB Propulsion Shaft, NSN 2010-01-089-8123, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 100% |
| 0007 | 210 A WMEC Propulsion Shaft Set, NSN 2010-01-459-5795, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | SET | $ - 0 | $ - 0 | 50% |
| 0008 | 210 B WMEC Propulsion Shaft, Line, NSN 2010-01-141-3512, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 2 | EA | $ - 0 | $ - 0 | 100% |
| 0009 | 210 B WMEC Propulsion Shaft, Tail, NSN 2010-01-092-5810, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 2 | EA | $ - 0 | $ - 0 | 100% |
| 0010 | 225 WLB Propulsion Shaft , NSN 2010-01-399-5912, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 80% |
| 0011 | 270 A&B WMEC Propulsion Shaft Tail, NSN 2010-01-135-7065, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 2 | EA | $ - 0 | $ - 0 | 100% |
| 0012 | 282 WMEC Propulsion Shaft Stern Tube, NSN 2010-00-248-6828, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 25% |
| 0013 | 282 WMEC Propulsion Shaft Tail, NSN 2010-00-248-6829, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 25% |
| 0014 | 378 WHEC Propulsion Shaft, Stern Tube, NSN 2010-01-140-8901, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 160% |
| 0015 | 378 WHEC Propulsion Shaft, Tail (EW), NSN 2010-01-141-9944, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 120% |
| 0016 | 378 WHEC Propulsion Shaft, Tail (PSI), NSN 2010-01-078-4097, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 25% |
| 0017 | 140 WTGB Propulsion Shaft, (FORGING), NSN 2010-01-F93-0330 Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 20% |
| 0018 | 210 A WMEC Propulsion Shaft, Fwd, (FORGING), NSN 2010-01-F93-0321, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 0019 | 210 A WMEC Propulsion Shaft, Aft, (FORGING), NSN 2010-01-F93-0322, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 0020 | 210 B WMEC Propulsion Shaft, Line, (FORGING), NSN 2010-01-F93-0326, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 0021 | 210 B WMEC Propulsion Shaft, Tail, (FORGING), NSN 2010-01-F93-0323 Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 0022 | 270 A&B WMEC Propulsion Shaft,Tail, (FORGING), NSN 2010-01-F93-0327, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 50% |
| 0023 | 378 WHEC Propulsion Shaft, Stern Tube, (FORGING), NSN 2010-01-F93-0336, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 50% |
| 0024 | 378 WHEC Propulsion Shaft, Tail Shaft, (FORGING), NSN 2010-01-F93-0337, Machined as Escher Wyss(E/W) Tail Shaft, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 0025 | 378 WHEC Propulsion Shaft, Tail Shaft, (FORGING), NSN 2010-01-F93-0337, Machined as Propulsion Systems Inc. (PSI) Tail Shaft, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| Opt Year One | Opt Year One Total | $ - 0 | ||||
| CLIN | DESCRIPTION | QTY | UI | PRICE EACH | PRICE TOTAL | USAGE FACTOR |
| 1001 | For approval, Welding Procedure Specifications, Procedure Qualification Records, and Welder Performance Qualifications IAW section 3.8. | 1 | EA | $__NSP____ | $__NSP____ | 100% |
| 1002 | Receiving Inspection of Propulsion Shafts @ Contractors facility IAW 3.4.c | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 1003 | For approval, Pre-repair Inspection Report IAW section 3.5. | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 1004 | For approval, Post Repair Inspection Report IAW section 3.13.3 | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 1005 | Delivery Receipt Inspection of Completed Propulsion Shaft. | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 1006 | 140 WTGB Propulsion Shaft, NSN 2010-01-089-8123, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 100% |
| 1007 | 210 A WMEC Propulsion Shaft Set, NSN 2010-01-459-5795, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | SET | $ - 0 | $ - 0 | 50% |
| 1008 | 210 B WMEC Propulsion Shaft, Line , NSN 2010-01-141-3512, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 2 | EA | $ - 0 | $ - 0 | 100% |
| 1009 | 210 B WMEC Propulsion Shaft, Tail, NSN 2010-01-092-5810, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 2 | EA | $ - 0 | $ - 0 | 100% |
| 1010 | 225 WLB Propulsion Shaft , NSN 2010-01-399-5912, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 80% |
| 1011 | 270 A&B WMEC Propulsion Shaft Tail, NSN 2010-01-135-7065, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 2 | EA | $ - 0 | $ - 0 | 100% |
| 1012 | 282 WMEC Propulsion Shaft Stern Tube, NSN 2010-00-248-6828, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 25% |
| 1013 | 282 WMEC Propulsion Shaft Tail, NSN 2010-00-248-6829, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 25% |
| 1014 | 378 WHEC Propulsion Shaft, Stern Tube, NSN 2010-01-140-8901, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 160% |
| 1015 | 378 WHEC Propulsion Shaft, Tail (EW), NSN 2010-01-141-9944, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 120% |
| 1016 | 378 WHEC Propulsion Shaft, Tail (PSI), NSN 2010-01-078-4097, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 25% |
| 1017 | 140 WTGB Propulsion Shaft, (FORGING), NSN 2010-01-F93-0330 Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 20% |
| 1018 | 210 A WMEC Propulsion Shaft, Fwd, (FORGING), NSN 2010-01-F93-0321, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 1019 | 210 A WMEC Propulsion Shaft, Aft, (FORGING), NSN 2010-01-F93-0322, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 1020 | 210 B WMEC Propulsion Shaft, Line, (FORGING), NSN 2010-01-F93-0326, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 1021 | 210 B WMEC Propulsion Shaft, Tail, (FORGING), NSN 2010-01-F93-0323 Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 1022 | 270 A&B WMEC Propulsion Shaft,Tail, (FORGING), NSN 2010-01-F93-0327, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 50% |
| 1023 | 378 WHEC Propulsion Shaft, Stern Tube, (FORGING), NSN 2010-01-F93-0336, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 50% |
| 1024 | 378 WHEC Propulsion Shaft, Tail Shaft, (FORGING), NSN 2010-01-F93-0336, Machined as Escher Wyss(E/W) Tail Shaft, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 1025 | 378 WHEC Propulsion Shaft, Tail Shaft, (FORGING), NSN 2010-01-F93-0336, Machined as Propulsion Systems Inc. (PSI) Tail Shaft, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| Opt Year Two | Opt Year Two Total | $ - 0 | ||||
| CLIN | DESCRIPTION | QTY | UI | PRICE EACH | PRICE TOTAL | USAGE FACTOR |
| 2001 | For approval, Welding Procedure Specifications, Procedure Qualification Records, and Welder Performance Qualifications IAW section 3.8. | 1 | EA | $__NSP____ | $__NSP____ | 100% |
| 2002 | Receiving Inspection of Propulsion Shafts @ Contractors facility IAW 3.4.c | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 2003 | For approval, Pre-repair Inspection Report IAW section 3.5. | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 2004 | For approval, Post Repair Inspection Report IAW section 3.13.3 | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 2005 | Delivery Receipt Inspection of Completed Propulsion Shaft. | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 2006 | 140 WTGB Propulsion Shaft, NSN 2010-01-089-8123, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 100% |
| 2007 | 210 A WMEC Propulsion Shaft Set, NSN 2010-01-459-5795, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | SET | $ - 0 | $ - 0 | 50% |
| 2008 | 210 B WMEC Propulsion Shaft, Line , NSN 2010-01-141-3512, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 2 | EA | $ - 0 | $ - 0 | 100% |
| 2009 | 210 B WMEC Propulsion Shaft, Tail, NSN 2010-01-092-5810, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 2 | EA | $ - 0 | $ - 0 | 100% |
| 2010 | 225 WLB Propulsion Shaft , NSN 2010-01-399-5912, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 80% |
| 2011 | 270 A&B WMEC Propulsion Shaft Tail, NSN 2010-01-135-7065, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 2 | EA | $ - 0 | $ - 0 | 100% |
| 2012 | 282 WMEC Propulsion Shaft Stern Tube, NSN 2010-00-248-6828, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 25% |
| 2013 | 282 WMEC Propulsion Shaft Tail, NSN 2010-00-248-6829, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 25% |
| 2014 | 378 WHEC Propulsion Shaft, Stern Tube, NSN 2010-01-140-8901, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 160% |
| 2015 | 378 WHEC Propulsion Shaft, Tail (EW), NSN 2010-01-141-9944, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 120% |
| 2016 | 378 WHEC Propulsion Shaft, Tail (PSI), NSN 2010-01-078-4097, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 25% |
| 2017 | 140 WTGB Propulsion Shaft, (FORGING), NSN 2010-01-F93-0330 Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 20% |
| 2018 | 210 A WMEC Propulsion Shaft, Fwd, (FORGING), NSN 2010-01-F93-0321, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 2019 | 210 A WMEC Propulsion Shaft, Aft, (FORGING), NSN 2010-01-F93-0322, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 2020 | 210 B WMEC Propulsion Shaft, Line, (FORGING), NSN 2010-01-F93-0326, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 2021 | 210 B WMEC Propulsion Shaft, Tail, (FORGING), NSN 2010-01-F93-0323 Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 2022 | 270 A&B WMEC Propulsion Shaft,Tail, (FORGING), NSN 2010-01-F93-0327, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 50% |
| 2023 | 378 WHEC Propulsion Shaft, Stern Tube, (FORGING), NSN 2010-01-F93-0336, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 50% |
| 2024 | 378 WHEC Propulsion Shaft, Tail Shaft, (FORGING), NSN 2010-01-F93-0336, Machined as Escher Wyss(E/W) Tail Shaft, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 2025 | 378 WHEC Propulsion Shaft, Tail Shaft, (FORGING), NSN 2010-01-F93-0336, Machined as Propulsion Systems Inc. (PSI) Tail Shaft, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| Opt Year Three | Opt Year Three Total | $ - 0 | ||||
| CLIN | DESCRIPTION | QTY | UI | PRICE EACH | PRICE TOTAL | USAGE FACTOR |
| 3001 | For approval, Welding Procedure Specifications, Procedure Qualification Records, and Welder Performance Qualifications IAW section 3.8. | 1 | EA | $__NSP____ | $__NSP____ | 100% |
| 3002 | Receiving Inspection of Propulsion Shafts @ Contractors facility IAW 3.4.c | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 3003 | For approval, Pre-repair Inspection Report IAW section 3.5. | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 3004 | For approval, Post Repair Inspection Report IAW section 3.13.3 | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 3005 | Delivery Receipt Inspection of Completed Propulsion Shaft. | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 3006 | 140 WTGB Propulsion Shaft, NSN 2010-01-089-8123, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 100% |
| 3007 | 210 A WMEC Propulsion Shaft Set, NSN 2010-01-459-5795, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | SET | $ - 0 | $ - 0 | 50% |
| 3008 | 210 B WMEC Propulsion Shaft, Line , NSN 2010-01-141-3512, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 2 | EA | $ - 0 | $ - 0 | 100% |
| 3009 | 210 B WMEC Propulsion Shaft, Tail, NSN 2010-01-092-5810, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 2 | EA | $ - 0 | $ - 0 | 100% |
| 3010 | 225 WLB Propulsion Shaft , NSN 2010-01-399-5912, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 80% |
| 3011 | 270 A&B WMEC Propulsion Shaft Tail, NSN 2010-01-135-7065, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 2 | EA | $ - 0 | $ - 0 | 100% |
| 3012 | 282 WMEC Propulsion Shaft Stern Tube, NSN 2010-00-248-6828, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 25% |
| 3013 | 282 WMEC Propulsion Shaft Tail, NSN 2010-00-248-6829, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 25% |
| 3014 | 378 WHEC Propulsion Shaft, Stern Tube, NSN 2010-01-140-8901, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 160% |
| 3015 | 378 WHEC Propulsion Shaft, Tail (EW), NSN 2010-01-141-9944, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 120% |
| 3016 | 378 WHEC Propulsion Shaft, Tail (PSI), NSN 2010-01-078-4097, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 25% |
| 3017 | 140 WTGB Propulsion Shaft, (FORGING), NSN 2010-01-F93-0330 Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 20% |
| 3018 | 210 A WMEC Propulsion Shaft, Fwd, (FORGING), NSN 2010-01-F93-0321, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 3019 | 210 A WMEC Propulsion Shaft, Aft, (FORGING), NSN 2010-01-F93-0322, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 3020 | 210 B WMEC Propulsion Shaft, Line, (FORGING), NSN 2010-01-F93-0326, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 3021 | 210 B WMEC Propulsion Shaft, Tail, (FORGING), NSN 2010-01-F93-0323 Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 3022 | 270 A&B WMEC Propulsion Shaft,Tail, (FORGING), NSN 2010-01-F93-0327, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 50% |
| 3023 | 378 WHEC Propulsion Shaft, Stern Tube, (FORGING), NSN 2010-01-F93-0336, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 50% |
| 3024 | 378 WHEC Propulsion Shaft, Tail Shaft, (FORGING), NSN 2010-01-F93-0336, Machined as Escher Wyss(E/W) Tail Shaft, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 3025 | 378 WHEC Propulsion Shaft, Tail Shaft, (FORGING), NSN 2010-01-F93-0336, Machined as Propulsion Systems Inc. (PSI) Tail Shaft, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| Opt Year Four | Opt Year Four Total | $ - 0 | ||||
| CLIN | DESCRIPTION | QTY | UI | PRICE EACH | PRICE TOTAL | USAGE FACTOR |
| 4001 | For approval, Welding Procedure Specifications, Procedure Qualification Records, and Welder Performance Qualifications IAW section 3.8. | 1 | EA | $__NSP____ | $__NSP____ | 100% |
| 4002 | Receiving Inspection of Propulsion Shafts @ Contractors facility IAW 3.4.c | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 4003 | For approval, Pre-repair Inspection Report IAW section 3.5. | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 4004 | For approval, Post Repair Inspection Report IAW section 3.13.3 | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 4005 | Delivery Receipt Inspection of Completed Propulsion Shaft. | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 4006 | 140 WTGB Propulsion Shaft, NSN 2010-01-089-8123, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 100% |
| 4007 | 210 A WMEC Propulsion Shaft Set, NSN 2010-01-459-5795, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | SET | $ - 0 | $ - 0 | 50% |
| 4008 | 210 B WMEC Propulsion Shaft, Line , NSN 2010-01-141-3512, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 2 | EA | $ - 0 | $ - 0 | 100% |
| 4009 | 210 B WMEC Propulsion Shaft, Tail, NSN 2010-01-092-5810, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 2 | EA | $ - 0 | $ - 0 | 100% |
| 4010 | 225 WLB Propulsion Shaft , NSN 2010-01-399-5912, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 80% |
| 4011 | 270 A&B WMEC Propulsion Shaft Tail, NSN 2010-01-135-7065, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 2 | EA | $ - 0 | $ - 0 | 100% |
| 4012 | 282 WMEC Propulsion Shaft Stern Tube, NSN 2010-00-248-6828, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 25% |
| 4013 | 282 WMEC Propulsion Shaft Tail, NSN 2010-00-248-6829, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 25% |
| 4014 | 378 WHEC Propulsion Shaft, Stern Tube, NSN 2010-01-140-8901, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 160% |
| 4015 | 378 WHEC Propulsion Shaft, Tail (EW), NSN 2010-01-141-9944, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 120% |
| 4016 | 378 WHEC Propulsion Shaft, Tail (PSI), NSN 2010-01-078-4097, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 25% |
| 4017 | 140 WTGB Propulsion Shaft, (FORGING), NSN 2010-01-F93-0330 Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 20% |
| 4018 | 210 A WMEC Propulsion Shaft, Fwd, (FORGING), NSN 2010-01-F93-0321, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 4019 | 210 A WMEC Propulsion Shaft, Aft, (FORGING), NSN 2010-01-F93-0322, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 4020 | 210 B WMEC Propulsion Shaft, Line, (FORGING), NSN 2010-01-F93-0326, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 4021 | 210 B WMEC Propulsion Shaft, Tail, (FORGING), NSN 2010-01-F93-0323 Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 4022 | 270 A&B WMEC Propulsion Shaft,Tail, (FORGING), NSN 2010-01-F93-0327, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 50% |
| 4023 | 378 WHEC Propulsion Shaft, Stern Tube, (FORGING), NSN 2010-01-F93-0336, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 50% |
| 4024 | 378 WHEC Propulsion Shaft, Tail Shaft, (FORGING), NSN 2010-01-F93-0336, Machined as Escher Wyss(E/W) Tail Shaft, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 4025 | 378 WHEC Propulsion Shaft, Tail Shaft, (FORGING), NSN 2010-01-F93-0336, Machined as Propulsion Systems Inc. (PSI) Tail Shaft, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
CLIN_ Delivery Schedule
| Required / Requested Delivery Schedule For Large Shaft CLIN's | ||||
| CLIN | QTY | UNIT | ACCOMPLISHMENT TIME FRAME | |
| 0001 - 4001 | 1 | EA | Submit with proposal for evaluation. (And Annually thereafter upon Contract award date) | |
| 0002 - 4002 | AR | EA | 10 | Calendar days after the receipt of any GFP. |
| 0003 - 4003 | AR | EA | 35 | Calendar days after the receipt of any GFP. |
| 0004 - 4004 | AR | EA | 35 | Calendar days after completion of final inspection & testing of each delivery order. |
| 0005 - 4005 | AR | EA | 30 | Calendar days after completion of final QA inspection of each delivery order. |
| 0006 - 4006 | 1 | SET | 130 | Calendar days after final approval of CLIN 0003 |
| 0007 - 4007 | 1 | EA | 130 | Calendar days after final approval of CLIN 0003 |
| 0008 - 4008 | 1 | EA | 130 | Calendar days after final approval of CLIN 0003 |
| 0009 - 4009 | 1 | EA | 130 | Calendar days after final approval of CLIN 0003 |
| 0010 - 4010 | 1 | EA | 130 | Calendar days after final approval of CLIN 0003 |
| 0011 - 4011 | 1 | EA | 130 | Calendar days after final approval of CLIN 0003 |
| 0012 - 4012 | 1 | EA | 130 | Calendar days after final approval of CLIN 0003 |
| 0013 - 4013 | 1 | EA | 130 | Calendar days after final approval of CLIN 0003 |
| 0014 - 4014 | 1 | EA | 130 | Calendar days after final approval of CLIN 0003 |
| 0015 - 4015 | 1 | EA | 130 | Calendar days after final approval of CLIN 0003 |
| 0016 - 4016 | 1 | EA | 130 | Calendar days after final approval of CLIN 0003 |
| 0017 - 4017 | 1 | EA | 130 | Calendar days after final approval of CLIN 0003 |
| 0018 - 4018 | 1 | EA | 130 | Calendar days after final approval of CLIN 0003 |
| 0019 - 4019 | 1 | EA | 130 | Calendar days after final approval of CLIN 0003 |
| 0020 - 4020 | 1 | EA | 130 | Calendar days after final approval of CLIN 0003 |
| 0021 - 4021 | 1 | EA | 130 | Calendar days after final approval of CLIN 0003 |
| 0022 - 4022 | 1 | EA | 130 | Calendar days after final approval of CLIN 0003 |
| 0023 - 4023 | 1 | EA | 130 | Calendar days after final approval of CLIN 0003 |
| 0024 - 4024 | 1 | EA | 130 | Calendar days after final approval of CLIN 0003 |
| 0025 - 4025 | 1 | EA | 130 | Calendar days after final approval of CLIN 0003 |
| NOTES: | ||||
| 1- | ||||
| 2- | ||||
| 3- | ||||
| 4- | ||||
| 5- | ||||
| Offerors' Proposed Delivery Schedule For Large Shaft CLIN's | ||||
| CLIN | QTY | UNIT | ACCOMPLISHMENT TIME FRAME | |
| 0001 - 4001 | 1 | EA | Submit with proposal for evaluation. (And Annually thereafter upon Contract award date) | |
| 0002 - 4002 | AR | EA | Calendar days after the receipt of any GFP. | |
| 0003 - 4003 | AR | EA | Calendar days after the receipt of any GFP. | |
| 0004 - 4004 | AR | EA | Calendar days after completion of final inspection & testing of each delivery order. | |
| 0005 - 4005 | AR | EA | Calendar days after completion of final QA inspection of each delivery order. | |
| 0006 - 4006 | 1 | SET | Calendar days after final approval of CLIN 0003 | |
| 0007 - 4007 | 1 | EA | Calendar days after final approval of CLIN 0003 | |
| 0008 - 4008 | 1 | EA | Calendar days after final approval of CLIN 0003 | |
| 0009 - 4009 | 1 | EA | Calendar days after final approval of CLIN 0003 | |
| 0010 - 4010 | 1 | EA | Calendar days after final approval of CLIN 0003 | |
| 0011 - 4011 | 1 | EA | Calendar days after final approval of CLIN 0003 | |
| 0012 - 4012 | 1 | EA | Calendar days after final approval of CLIN 0003 | |
| 0013 - 4013 | 1 | EA | Calendar days after final approval of CLIN 0003 | |
| 0014 - 4014 | 1 | EA | Calendar days after final approval of CLIN 0003 | |
| 0015 - 4015 | 1 | EA | Calendar days after final approval of CLIN 0003 | |
| 0016 - 4016 | 1 | EA | Calendar days after final approval of CLIN 0003 | |
| 0017 - 4017 | 1 | EA | Calendar days after final approval of CLIN 0003 | |
| 0018 - 4018 | 1 | EA | Calendar days after final approval of CLIN 0003 | |
| 0019 - 4019 | 1 | EA | Calendar days after final approval of CLIN 0003 | |
| 0020 - 4020 | 1 | EA | Calendar days after final approval of CLIN 0003 | |
| 0021 - 4021 | 1 | EA | Calendar days after final approval of CLIN 0003 | |
| 0022 - 4022 | 1 | EA | Calendar days after final approval of CLIN 0003 | |
| 0023 - 4023 | 1 | EA | Calendar days after final approval of CLIN 0003 | |
| 0024 - 4024 | 1 | EA | Calendar days after final approval of CLIN 0003 | |
| 0025 - 4025 | 1 | EA | Calendar days after final approval of CLIN 0003 | |
| NOTES: | ||||
| 1- | ||||
| 2- | ||||
| 3- | ||||
| 4- | ||||
| 5- |
Evaluation Entry
| BASE YEAR | |||||
| CLIN | Application | Niin | Qty | Estimate | |
| Hours | Fixed Labor Rate/ Hour | ||||
| (SLIN XXXXAC) | Open and Inspect and Report | ||||
| (SLIN XXXXAA) | Material |
Cost (SLIN XXXXAB) New Crate Cost (SLIN XXXXAD) Shipping to Baltimore, MD
(SLIN
| XXXXAF) | Shipping to Barstow, CA |
| (SLIN XXXXAG) | IGE Usage |
| Factor | Evaluated |
Total Cost
| 0004 | 140 WTGB | 010898123 | 1 | 351 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1.00 | $0.00 | |
| 0005 | 210 A | 014595795 | 1 | 851 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.50 | $0.00 | |
| 0006 | 210 B (Line) | 011413512 | 1 | 217 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 2.00 | $0.00 | |
| 0007 | 210 B (Tail) | 010925810 | 1 | 233 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 2.00 | $0.00 | |
| 0008 | 225 Tail | 013995912 | 1 | 896 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.80 | $0.00 | |
| 0009 | 270 Tail | 011357065 | 1 | 771 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 2.00 | $0.00 | |
| 0010 | 282 WMEC Stern Tube | 002486828 | 1 | 1064 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.25 | $0.00 | |
| 0011 | 282 WMEC Tail | 002486829 | 1 | 839 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.25 | $0.00 | |
| 0012 | 378 ST | 011408901 | 1 | 1608 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1.60 | $0.00 | |
| 0013 | 378 EW Tail | 011419944 | 1 | 1259 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1.20 | $0.00 | |
| 0014 | 378 PSI Tail | 010784097 | 1 | 1589 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.25 | $0.00 | |
| 0015 | 140 WTGB (Forging) | 01F930330 | 1 | 442 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.20 | $0.00 | |
| 0016 | 210 A (Fwd, Shaft Forging) | 01F930321 | 1 | 533 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 | |
| 0017 | 210 A (Aft, Shaft Forging) | 01F930322 | 1 | 525 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 | |
| 0018 | 210 B (Line Shaft Forging) | 01F930326 | 1 | 283 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 | |
| 0019 | 210 B (Tail Shaft Forging) | 01F930323 | 1 | 322 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 | |
| 0020 | 270 Tail (Forging) | 01F930327 | 1 | 1453 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.50 | $0.00 | |
| 0021 | 378 ST (Forging) | 01F930336 | 1 | 2036 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.50 | $0.00 | |
| 0022 | 378 EW (Tail Shaft Forging) | 01F930337 | 1 | 2014 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 | |
| 0023 | 378 PSI (Tail Shaft Forging) | 01F930337 | 1 | 2014 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 | |
| Base Year Total | 0.00 | ||||||||||||
| OPTION YEAR 1 | |||||||||||||
| CLIN | Application | Niin | Qty | Estimate | |||||||||
| Hours | Fixed Labor Rate/ Hour | ||||||||||||
| (SLIN XXXXAC) | Open and Inspect and Report | ||||||||||||
| (SLIN XXXXAA) | Material |
Cost (SLIN XXXXAB) New Crate Cost (SLIN XXXXAD) Shipping to Baltimore, MD
(SLIN
| XXXXAF) | Shipping to Barstow, CA |
| (SLIN XXXXAG) | IGE Usage |
| Factor | Evaluated |
Total Cost
| 1004 | 140 WTGB | 010898123 | 1 | 351 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1.00 | $0.00 | |
| 1005 | 210 A | 014595795 | 1 | 851 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.50 | $0.00 | |
| 1006 | 210 B (Line) | 011413512 | 1 | 217 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 2.00 | $0.00 | |
| 1007 | 210 B (Tail) | 010925810 | 1 | 233 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 2.00 | $0.00 | |
| 1008 | 225 Tail | 013995912 | 1 | 896 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.80 | $0.00 | |
| 1009 | 270 Tail | 011357065 | 1 | 771 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 2.00 | $0.00 | |
| 1010 | 282 WMEC Stern Tube | 002486828 | 1 | 1064 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.25 | $0.00 | |
| 1011 | 282 WMEC Tail | 002486829 | 1 | 839 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.25 | $0.00 | |
| 1012 | 378 ST | 011408901 | 1 | 1608 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1.60 | $0.00 | |
| 1013 | 378 EW Tail | 011419944 | 1 | 1259 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1.20 | $0.00 | |
| 1014 | 378 PSI Tail | 010784097 | 1 | 1589 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.25 | $0.00 | |
| 1015 | 140 WTGB (Forging) | 01F930330 | 1 | 442 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.20 | $0.00 | |
| 1016 | 210 A (Fwd, Shaft Forging) | 01F930321 | 1 | 533 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 | |
| 1017 | 210 A (Aft, Shaft Forging) | 01F930322 | 1 | 525 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 | |
| 1018 | 210 B (Line Shaft Forging) | 01F930326 | 1 | 283 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 | |
| 1019 | 210 B (Tail Shaft Forging) | 01F930323 | 1 | 322 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 | |
| 1020 | 270 Tail (Forging) | 01F930327 | 1 | 1453 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.50 | $0.00 | |
| 1021 | 378 ST (Forging) | 01F930336 | 1 | 2036 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.50 | $0.00 | |
| 1022 | 378 EW (Tail Shaft Forging) | 01F930337 | 1 | 2014 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 | |
| 1023 | 378 PSI (Tail Shaft Forging) | 01F930337 | 1 | 2014 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 | |
| Option Year 1 Total | 0.00 | ||||||||||||
| OPTION YEAR 2 | |||||||||||||
| CLIN | Application | Niin | Qty | Estimate | |||||||||
| Hours | Fixed Labor Rate/ Hour | ||||||||||||
| (SLIN XXXXAC) | Open and Inspect and Report | ||||||||||||
| (SLIN XXXXAA) | Material |
Cost (SLIN XXXXAB) New Crate Cost (SLIN XXXXAD) Shipping to Baltimore, MD
(SLIN
| XXXXAF) | Shipping to Barstow, CA |
| (SLIN XXXXAG) | IGE Usage |
| Factor | Evaluated |
Total Cost
| 2004 | 140 WTGB | 010898123 | 1 | 351 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1.00 | $0.00 | |
| 2005 | 210 A | 014595795 | 1 | 851 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.50 | $0.00 | |
| 2006 | 210 B (Line) | 011413512 | 1 | 217 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 2.00 | $0.00 | |
| 2007 | 210 B (Tail) | 010925810 | 1 | 233 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 2.00 | $0.00 | |
| 2008 | 225 Tail | 013995912 | 1 | 896 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.80 | $0.00 | |
| 2009 | 270 Tail | 011357065 | 1 | 771 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 2.00 | $0.00 | |
| 2010 | 282 WMEC Stern Tube | 002486828 | 1 | 1064 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.25 | $0.00 | |
| 2011 | 282 WMEC Tail | 002486829 | 1 | 839 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.25 | $0.00 | |
| 2012 | 378 ST | 011408901 | 1 | 1608 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1.60 | $0.00 | |
| 2013 | 378 EW Tail | 011419944 | 1 | 1259 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1.20 | $0.00 | |
| 2014 | 378 PSI Tail | 010784097 | 1 | 1589 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.25 | $0.00 | |
| 2015 | 140 WTGB (Forging) | 01F930330 | 1 | 442 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.20 | $0.00 | |
| 2016 | 210 A (Fwd, Shaft Forging) | 01F930321 | 1 | 533 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 | |
| 2017 | 210 A (Aft, Shaft Forging) | 01F930322 | 1 | 525 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 | |
| 2018 | 210 B (Line Shaft Forging) | 01F930326 | 1 | 283 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 | |
| 2019 | 210 B (Tail Shaft Forging) | 01F930323 | 1 | 322 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 | |
| 2020 | 270 Tail (Forging) | 01F930327 | 1 | 1453 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.50 | $0.00 | |
| 2021 | 378 ST (Forging) | 01F930336 | 1 | 2036 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.50 | $0.00 | |
| 2022 | 378 EW (Tail Shaft Forging) | 01F930337 | 1 | 2014 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 | |
| 2023 | 378 PSI (Tail Shaft Forging) | 01F930337 | 1 | 2014 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 | |
| Option Year 2 Total | 0.00 | ||||||||||||
| OPTION YEAR 3 | |||||||||||||
| CLIN | Application | Niin | Qty | Estimate | |||||||||
| Hours | Fixed Labor Rate/ Hour | ||||||||||||
| (SLIN XXXXAC) | Open and Inspect and Report | ||||||||||||
| (SLIN XXXXAA) | Material |
Cost (SLIN XXXXAB) New Crate Cost (SLIN XXXXAD) Shipping to Baltimore, MD
(SLIN
| XXXXAF) | Shipping to Barstow, CA |
| (SLIN XXXXAG) | IGE Usage |
| Factor | Evaluated |
Total Cost
| 3004 | 140 WTGB | 010898123 | 1 | 351 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1.00 | $0.00 | |
| 3005 | 210 A | 014595795 | 1 | 851 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.50 | $0.00 | |
| 3006 | 210 B (Line) | 011413512 | 1 | 217 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 2.00 | $0.00 | |
| 3007 | 210 B (Tail) | 010925810 | 1 | 233 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 2.00 | $0.00 | |
| 3008 | 225 Tail | 013995912 | 1 | 896 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.80 | $0.00 | |
| 3009 | 270 Tail | 011357065 | 1 | 771 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 2.00 | $0.00 | |
| 3010 | 282 WMEC Stern Tube | 002486828 | 1 | 1064 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.25 | $0.00 | |
| 3011 | 282 WMEC Tail | 002486829 | 1 | 839 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.25 | $0.00 | |
| 3012 | 378 ST | 011408901 | 1 | 1608 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1.60 | $0.00 | |
| 3013 | 378 EW Tail | 011419944 | 1 | 1259 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1.20 | $0.00 | |
| 3014 | 378 PSI Tail | 010784097 | 1 | 1589 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.25 | $0.00 | |
| 3015 | 140 WTGB (Forging) | 01F930330 | 1 | 442 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.20 | $0.00 | |
| 3016 | 210 A (Fwd, Shaft Forging) | 01F930321 | 1 | 533 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 | |
| 3017 | 210 A (Aft, Shaft Forging) | 01F930322 | 1 | 525 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 | |
| 3018 | 210 B (Line Shaft Forging) | 01F930326 | 1 | 283 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 | |
| 3019 | 210 B (Tail Shaft Forging) | 01F930323 | 1 | 322 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 | |
| 3020 | 270 Tail (Forging) | 01F930327 | 1 | 1453 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.50 | $0.00 | |
| 3021 | 378 ST (Forging) | 01F930336 | 1 | 2036 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.50 | $0.00 | |
| 3022 | 378 EW (Tail Shaft Forging) | 01F930337 | 1 | 2014 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 | |
| 3023 | 378 PSI (Tail Shaft Forging) | 01F930337 | 1 | 2014 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 | |
| Option Year 3 Total | 0.00 | ||||||||||||
| OPTION YEAR 4 | |||||||||||||
| CLIN | Application | Niin | Qty | Estimate | |||||||||
| Hours | Fixed Labor Rate/ Hour | ||||||||||||
| (SLIN XXXXAC) | Open and Inspect and Report | ||||||||||||
| (SLIN XXXXAA) | Material |
Cost (SLIN XXXXAB) New Crate Cost (SLIN XXXXAD) Shipping to Baltimore, MD
(SLIN
| XXXXAF) | Shipping to Barstow, CA |
| (SLIN XXXXAG) | IGE Usage |
| Factor | Evaluated |
Total Cost
| 4004 | 140 WTGB | 010898123 | 1 | 351 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1.00 | $0.00 |
| 4005 | 210 A | 014595795 | 1 | 851 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.50 | $0.00 |
| 4006 | 210 B (Line) | 011413512 | 1 | 217 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 2.00 | $0.00 |
| 4007 | 210 B (Tail) | 010925810 | 1 | 233 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 2.00 | $0.00 |
| 4008 | 225 Tail | 013995912 | 1 | 896 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.80 | $0.00 |
| 4009 | 270 Tail | 011357065 | 1 | 771 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 2.00 | $0.00 |
| 4010 | 282 WMEC Stern Tube | 002486828 | 1 | 1064 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.25 | $0.00 |
| 4011 | 282 WMEC Tail | 002486829 | 1 | 839 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.25 | $0.00 |
| 4012 | 378 ST | 011408901 | 1 | 1608 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1.60 | $0.00 |
| 4013 | 378 EW Tail | 011419944 | 1 | 1259 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1.20 | $0.00 |
| 4014 | 378 PSI Tail | 010784097 | 1 | 1589 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.25 | $0.00 |
| 4015 | 140 WTGB (Forging) | 01F930330 | 1 | 442 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.20 | $0.00 |
| 4016 | 210 A (Fwd, Shaft Forging) | 01F930321 | 1 | 533 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 |
| 4017 | 210 A (Aft, Shaft Forging) | 01F930322 | 1 | 525 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 |
| 4018 | 210 B (Line Shaft Forging) | 01F930326 | 1 | 283 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 |
| 4019 | 210 B (Tail Shaft Forging) | 01F930323 | 1 | 322 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 |
| 4020 | 270 Tail (Forging) | 01F930327 | 1 | 1453 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.50 | $0.00 |
| 4021 | 378 ST (Forging) | 01F930336 | 1 | 2036 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.50 | $0.00 |
| 4022 | 378 EW (Tail Shaft Forging) | 01F930337 | 1 | 2014 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 |
| 4023 | 378 PSI (Tail Shaft Forging) | 01F930337 | 1 | 2014 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.10 | $0.00 |
| Option Year 4 Total | 0.00 |
Base Year and 4 Option Years Total 0.00
CLIN_Dlvrbl List(rev12-12-13)
| Contract CLIN's / Deliverables | |||||||
| Grand Total Cost of Base Year and all Opt Years | $ - 0 | ||||||
| Base Year | Base Year Total | $ - 0 | |||||
| CLIN | DESCRIPTION | QTY | UI | PRICE EACH | PRICE TOTAL | USAGE FACTOR | |
| 0001 | For approval, provision of current NAVSEA Approved Welding Procedure Specifications, Procedure Qualification Records, and Welder Performance Qualifications IAW section 3.10. of specification R-243-0459 for applicable material that each Coast Guard propulsion shaft is manufactured from. | AR | Annually | $__NSP____ | $__NSP____ | 100% | Applicable once a year, these item would need to be seen upon or prior to acceptance of award of contract and each option year. |
| 0002 | Receipt Report of each Propulsion Shaft upon it's arrival @ Contractors facility IAW 3.4. of specification R-243-0459 | AR | AR | $__NSP____ | $__NSP____ | 100% | This CLIN is applicable to all propulsion shafts provided by CG to Contractor. |
| 0003 | For approval, Post Repair Inspection Report IAW section 3.18 of specification R-243-0459 | AR | AR | $__NSP____ | $__NSP____ | 100% | This CLIN is applicable to all CG propulsion shafts |
| 0004 | Delivery Receipt Inspection of Completed Propulsion Shaft. | AR | AR | $__NSP____ | $__NSP____ | 100% | This CLIN may or may not be needed, it would be the receipt inspection conducted by the receiving unit or warehouse |
| 0005 | For approval, Provide Pre-repair Inspection Report for 140 WTGB Propulsion Shaft, NSN 2010-01-089-8123 IAW section 3.5. of specification R-243-04593 | 1 | JB | $ - 0 | $ - 0 | 100% | This CLIN to provide Inspection report that identifies all damage and out of tolerance dimensions with repair recommendations. |
| 0005a | For Approval, Loaded Labor Rate(s) IAW provided Estimated / Associated Hours to Repair, Test, Provide Post Repair Inspection Report and Conduct Final QA Inspection of 140’ WTGB Propulsion Shaft, NSN 2010-01-089-8123, IAW specification R-243-0459. | 1 | HR | $ - 0 | $ - 0 | 100% | This CLIN to provide loaded labor rate / rates for individual tasks that will be required to overhaul/repair propulsion shaft. |
| 0005b | For Approval, welding wire material used in conjuction with approved weld procedure specification for weld build-up and other weld repairs conducted to 140’ WTGB Propulsion Shaft, NSN 2010-01-089-8123 constructed of material listed in Data Sheet 001 of specification R-243-0459. | 1 | JB | $ - 0 | $ - 0 | 100% | This CLIN is the welding wire listing which will be the major material item used in repair of shafts. |
| 0005c | For Approval, Using newly manufactured wooden crate. Provide cost of Preservation, Packaging, Packing and Marking for 140’ WTGB Propulsion Shaft, NSN 2010-01-089-8123, IAW section 5.0 of specification R-243-0459. | 2 | JB | $ - 0 | $ - 0 | 100% | This CLIN may or may not be needed, dependant upon condition of propulsion shaft shipping crate. |
| 0005d | For Approval, using a shipping crate that is repairable, Provide Preservation, Packaging, Packing and Marking for 140’ WTGB Propulsion Shaft, NSN 2010-01-089-8123, IAW section 5.0 of specification R-243-0459. |
| 1 | JB | $ - 0 | $ - 0 | 100% | This CLIN may or may not be needed, dependant upon condition of propulsion shaft shipping crate. | ||
| 0005e | 140 WTGB Propulsion Shaft, NSN 2010-01-089-8123, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $__NSP____ | $__NSP____ | 100% | This CLIN may or may not be needed, it would be the receipt in spection conducted by the receiving unit or warehouse |
| 0007 | 210 A WMEC Propulsion Shaft Set, NSN 2010-01-459-5795, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | SET | $ - 0 | $ - 0 | 50% |
| 0008 | 210 B WMEC Propulsion Shaft, Line, NSN 2010-01-141-3512, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 2 | EA | $ - 0 | $ - 0 | 100% |
| 0009 | 210 B WMEC Propulsion Shaft, Tail, NSN 2010-01-092-5810, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 2 | EA | $ - 0 | $ - 0 | 100% |
| 0010 | 225 WLB Propulsion Shaft , NSN 2010-01-399-5912, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 80% |
| 0011 | 270 A&B WMEC Propulsion Shaft Tail, NSN 2010-01-135-7065, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 2 | EA | $ - 0 | $ - 0 | 100% |
| 0012 | 282 WMEC Propulsion Shaft Stern Tube, NSN 2010-00-248-6828, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 25% |
| 0013 | 282 WMEC Propulsion Shaft Tail, NSN 2010-00-248-6829, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 25% |
| 0014 | 378 WHEC Propulsion Shaft, Stern Tube, NSN 2010-01-140-8901, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 160% |
| 0015 | 378 WHEC Propulsion Shaft, Tail (EW), NSN 2010-01-141-9944, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 120% |
| 0016 | 378 WHEC Propulsion Shaft, Tail (PSI), NSN 2010-01-078-4097, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 25% |
| 0017 | 140 WTGB Propulsion Shaft, (FORGING), NSN 2010-01-F93-0330 Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 20% |
| 0018 | 210 A WMEC Propulsion Shaft, Fwd, (FORGING), NSN 2010-01-F93-0321, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 0019 | 210 A WMEC Propulsion Shaft, Aft, (FORGING), NSN 2010-01-F93-0322, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 0020 | 210 B WMEC Propulsion Shaft, Line, (FORGING), NSN 2010-01-F93-0326, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 0021 | 210 B WMEC Propulsion Shaft, Tail, (FORGING), NSN 2010-01-F93-0323 Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 0022 | 270 A&B WMEC Propulsion Shaft,Tail, (FORGING), NSN 2010-01-F93-0327, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 50% |
| 0023 | 378 WHEC Propulsion Shaft, Stern Tube, (FORGING), NSN 2010-01-F93-0336, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 50% |
| 0024 | 378 WHEC Propulsion Shaft, Tail Shaft, (FORGING), NSN 2010-01-F93-0337, Machined as Escher Wyss(E/W) Tail Shaft, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 0025 | 378 WHEC Propulsion Shaft, Tail Shaft, (FORGING), NSN 2010-01-F93-0337, Machined as Propulsion Systems Inc. (PSI) Tail Shaft, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| Opt Year One | Opt Year One Total | $ - 0 | ||||
| CLIN | DESCRIPTION | QTY | UI | PRICE EACH | PRICE TOTAL | USAGE FACTOR |
| 1001 | For approval, Welding Procedure Specifications, Procedure Qualification Records, and Welder Performance Qualifications IAW section 3.8. | 1 | EA | $__NSP____ | $__NSP____ | 100% |
| 1002 | Receiving Inspection of Propulsion Shafts @ Contractors facility IAW 3.4.c | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 1003 | For approval, Pre-repair Inspection Report IAW section 3.5. | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 1004 | For approval, Post Repair Inspection Report IAW section 3.13.3 | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 1005 | Delivery Receipt Inspection of Completed Propulsion Shaft. | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 1006 | 140 WTGB Propulsion Shaft, NSN 2010-01-089-8123, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 100% |
| 1007 | 210 A WMEC Propulsion Shaft Set, NSN 2010-01-459-5795, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | SET | $ - 0 | $ - 0 | 50% |
| 1008 | 210 B WMEC Propulsion Shaft, Line , NSN 2010-01-141-3512, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 2 | EA | $ - 0 | $ - 0 | 100% |
| 1009 | 210 B WMEC Propulsion Shaft, Tail, NSN 2010-01-092-5810, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 2 | EA | $ - 0 | $ - 0 | 100% |
| 1010 | 225 WLB Propulsion Shaft , NSN 2010-01-399-5912, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 80% |
| 1011 | 270 A&B WMEC Propulsion Shaft Tail, NSN 2010-01-135-7065, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 2 | EA | $ - 0 | $ - 0 | 100% |
| 1012 | 282 WMEC Propulsion Shaft Stern Tube, NSN 2010-00-248-6828, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 25% |
| 1013 | 282 WMEC Propulsion Shaft Tail, NSN 2010-00-248-6829, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 25% |
| 1014 | 378 WHEC Propulsion Shaft, Stern Tube, NSN 2010-01-140-8901, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 160% |
| 1015 | 378 WHEC Propulsion Shaft, Tail (EW), NSN 2010-01-141-9944, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 120% |
| 1016 | 378 WHEC Propulsion Shaft, Tail (PSI), NSN 2010-01-078-4097, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 25% |
| 1017 | 140 WTGB Propulsion Shaft, (FORGING), NSN 2010-01-F93-0330 Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 20% |
| 1018 | 210 A WMEC Propulsion Shaft, Fwd, (FORGING), NSN 2010-01-F93-0321, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 1019 | 210 A WMEC Propulsion Shaft, Aft, (FORGING), NSN 2010-01-F93-0322, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 1020 | 210 B WMEC Propulsion Shaft, Line, (FORGING), NSN 2010-01-F93-0326, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 1021 | 210 B WMEC Propulsion Shaft, Tail, (FORGING), NSN 2010-01-F93-0323 Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 1022 | 270 A&B WMEC Propulsion Shaft,Tail, (FORGING), NSN 2010-01-F93-0327, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 50% |
| 1023 | 378 WHEC Propulsion Shaft, Stern Tube, (FORGING), NSN 2010-01-F93-0336, Machined, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 50% |
| 1024 | 378 WHEC Propulsion Shaft, Tail Shaft, (FORGING), NSN 2010-01-F93-0336, Machined as Escher Wyss(E/W) Tail Shaft, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| 1025 | 378 WHEC Propulsion Shaft, Tail Shaft, (FORGING), NSN 2010-01-F93-0336, Machined as Propulsion Systems Inc. (PSI) Tail Shaft, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 10% |
| Opt Year Two | Opt Year Two Total | $ - 0 | ||||
| CLIN | DESCRIPTION | QTY | UI | PRICE EACH | PRICE TOTAL | USAGE FACTOR |
| 2001 | For approval, Welding Procedure Specifications, Procedure Qualification Records, and Welder Performance Qualifications IAW section 3.8. | 1 | EA | $__NSP____ | $__NSP____ | 100% |
| 2002 | Receiving Inspection of Propulsion Shafts @ Contractors facility IAW 3.4.c | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 2003 | For approval, Pre-repair Inspection Report IAW section 3.5. | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 2004 | For approval, Post Repair Inspection Report IAW section 3.13.3 | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 2005 | Delivery Receipt Inspection of Completed Propulsion Shaft. | AR | AR | $__NSP____ | $__NSP____ | 100% |
| 2006 | 140 WTGB Propulsion Shaft, NSN 2010-01-089-8123, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 100% |
| 2007 | 210 A WMEC Propulsion Shaft Set, NSN 2010-01-459-5795, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | SET | $ - 0 | $ - 0 | 50% |
| 2008 | 210 B WMEC Propulsion Shaft, Line , NSN 2010-01-141-3512, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 2 | EA | $ - 0 | $ - 0 | 100% |
| 2009 | 210 B WMEC Propulsion Shaft, Tail, NSN 2010-01-092-5810, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 2 | EA | $ - 0 | $ - 0 | 100% |
| 2010 | 225 WLB Propulsion Shaft , NSN 2010-01-399-5912, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 80% |
| 2011 | 270 A&B WMEC Propulsion Shaft Tail, NSN 2010-01-135-7065, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 2 | EA | $ - 0 | $ - 0 | 100% |
| 2012 | 282 WMEC Propulsion Shaft Stern Tube, NSN 2010-00-248-6828, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 25% |
| 2013 | 282 WMEC Propulsion Shaft Tail, NSN 2010-00-248-6829, Repaired, Tested, Inspected, Preserved, Packaged, Packed & Marked IAW specification R-243-0459 | 1 | EA | $ - 0 | $ - 0 | 25% |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .