Amendment 2 SF-30

View the file

Other files

File Type Posted
Solicitation_Large_Shaft.docx DOCX document
Attachment_3_-_Evaluation_Entry_-_Material_List_-_CLIN_List.xlsx XLSX spreadsheet
Amendment_1.pdf PDF
Solicitation_Large_Shaft.docx DOCX document
Attachment_2.pdf PDF
Attachment_3_-_Evaluation_Entry_-_Material_List_-_CLIN_List.xlsx XLSX spreadsheet
Attachment_1.pdf PDF
Attachment_4.pdf PDF
Solicitation_Large_Shaft.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

A0002

Jennifer M. Stock

The purpose of Amendment 0002 to solicitation HSCG40-14-R-30004 is to; 1) Extend the closing date of the solicitation; 2) modify Part IV, Representations and Instructions under Evaluations Factors for Award; 3) Revise SLIN XXXXAA verbiage within CLIN listing (Attachment 3); 4) Provide responses to Bidders Questions as follows:

See Page 2, Continuation of Description of the Amendment/Modification.

USCG SFLC LREPL

2401 Hawkins Point Rd Baltimore, MD 21226-5000

Travis Spires travis.a.spires@uscg.mil 410-762-6020

2113403B4500CU065

HSCG40-14-R-30004

1 5

09/16/2014

08/20/2014

14. CONTINUATION OF DECRIPTION OF AMENDMENT/MODIFICATION:

1) The solicitation due date is being extended from 9/19/14 at 4:00pm EST to 9/23/14 at 4:00pm EST. This is updated in Part I, The Schedule under SF 1449, Solicitation/contract form, and Part IV, Representations and Instructions under Instructions, conditions, and notice to bidders.

2) In Part IV, Representations and Instructions under Evaluations Factors For Award: Price Evaluation concerning paragraph titled, “SLIN XXXXAB (Material Cost Column of tab Evaluation Entry in Attachment 3),” the following changes were made:

From:

This SLIN represents material costs particular to the type of material used on the respective shaft being repaired. Bidders are to propose Firm-Fixed Prices on tab “Material List,” Attachment 3. The measure of the unit will be identified and require a Firm Fixed Price to be proposed for the base year and to each option year. For evaluation purposes only, the Coast Guard will apply an estimated quantity to each material item to be multiplied by the proposed material price for each SLIN to arrive at an evaluated total cost. For evaluation purposes only, the US Coast Guard will then apply the IGE usage factor to each SLIN XXXXAB (as indicated in tab “Evaluation Entry,” Attachment 3). The Coast Guard will calculate the sum of all SLIN XXXXAB for the base year through option year 4 to evaluate the total material price. The Firm-Fixed Prices proposed for the Base year shall be set forth in the contract once awarded.

To:

This SLIN represents material costs particular to the type of material used on the respective shaft being repaired. Bidders are to propose Firm-Fixed Prices on tab “Material List,” Attachment 3. The measure of the unit will be identified and require a Firm Fixed Price to be proposed for the base year and to each option year. For evaluation purposes only, the Coast Guard will apply an estimated quantity to each material item to be multiplied by the proposed material price for each SLIN to arrive at an evaluated total cost. For evaluation purposes only, the US Coast Guard will then apply the IGE usage factor to each SLIN XXXXAB (as indicated in tab “Evaluation Entry,” Attachment 3). The Coast Guard will calculate the sum of all SLIN XXXXAB for the base year through option year 4 to evaluate the total material price. The Firm-Fixed Prices proposed shall be set forth in the contract once awarded for the base year and each option year.

3) All SLINs XXXXAA Base year through Option year 4 will be revised as follows:

SLIN XXX5AA through SLIN XX14AA

From:

“For approval, Provide Pre-repair Inspection Report for ****SHAFT**** IAW Section 3.5 of Specification R-243-0459.”

To:

“For approval, Provide Pre-repair Inspection Report for ****SHAFT**** IAW Sections 3.4 through 3.7.2 of Specification R-243-0459.”

SLIN XX15AA through SLIN XX23AA

From:

“For approval, Provide Pre-repair Inspection Report ****SHAFT****, condition IAW Section 3.5 of Specification R-243-04593, for final machining into

****SHAFT****.”

To:

“For approval, Provide Pre-repair Inspection Report ****SHAFT****, condition IAW Sections 3.4 through 3.7.2 of Specification R-243-04593, for final machining into ****SHAFT****.”

Bidders Questions and Responses:

1. Question: Should the price per pound of welding wire include the other material components of this operation? These components include but are not limited to flux, shielding gasses, insulation, thermal wells, etc.

Answer: Yes, the price per pound shall include the other material components of this operation.

2. Question: Due to the volatility of welding material prices can the material fixed prices be negotiated at the renewal of the option years?

Answer: No. The solicitation originally stated, “The Firm-Fixed Prices proposed for the Base year shall be set forth in the contract once awarded,” and was an oversight. This will be addressed in amendment 2 of the solicitation as follows:

FROM:

This SLIN represents material costs particular to the type of material used on the respective shaft being repaired. Bidders are to propose Firm-Fixed Prices on tab “Material List,” Attachment 3. The measure of the unit will be identified and require a Firm Fixed Price to be proposed for the base year and to each option year. For evaluation purposes only, the Coast Guard will apply an estimated quantity to each material item to be multiplied by the proposed material price for each SLIN to arrive at an evaluated total cost. For evaluation purposes only, the US Coast Guard will then apply the IGE usage factor to each SLIN XXXXAB (as indicated in tab “Evaluation Entry,” Attachment 3). The Coast Guard will calculate the sum of all SLIN XXXXAB for the base year through option year 4 to evaluate the total material price. The Firm-Fixed Prices proposed for the Base year shall be set forth in the contract once awarded.

TO:

This SLIN represents material costs particular to the type of material used on the respective shaft being repaired. Bidders are to propose Firm-Fixed Prices on tab “Material List,” Attachment 3. The measure of the unit will be identified and require a Firm Fixed Price to be proposed for the base year and to each option year. For evaluation purposes only, the Coast Guard will apply an estimated quantity to each material item to be multiplied by the proposed material price for each SLIN to arrive at an evaluated total cost. For evaluation purposes only, the US Coast Guard will then apply the IGE usage factor to each SLIN XXXXAB (as indicated in tab “Evaluation Entry,” Attachment 3). The Coast Guard will calculate the sum of all SLIN XXXXAB for the base year through option year 4 to evaluate the total material price. The Firm-Fixed Prices proposed shall be set forth in the contract once awarded for the base year and each option year.

3. Question: SLIN AA requires a firm fixed price to accomplish paragraph 3.5 of the specification. Should this requirement be expanded to include paragraphs 3.4 thru 3.7.2 to include all work from the receipt of the shaft to the submission of the inspection report? If not where should this cost be applied?

Answer: Yes

4. Question: The FBO notice states that this is NOT a “Set Aside” opportunity and the contract clause on page 20 bullet (14) does not have an “X” for the Notice of Total Small Business Aside. However, the SF 1449, Box 10, states this acquisition is a 100% small business set aside. Please confirm if this is a full and open nation-wide bid or if this is a 100% small business set aside.

Answer: This has been addressed in amendment 1 of the solicitation. This is a 100% set aside for small businesses.

5. Question: The FBO notice states that the Response Date is Sep 19, 2014 at 4:00pm. EST. However, the SF 1449, Box 8, state the offeror due date is Sep 4, 2014. Please clarify what the correct response due date is for this opportunity.

Answer: This question was initially addressed through amendment 1 to the solicitation. The response date of this solicitation is being extended to 09/24/2014 at 4:00pm EST via this Amendment 2.

All Offeror’s are required to acknowledge/sign this amendment with their proposal.

INSTRUCTIONS

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Item 9, (Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries.

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g)

(h)

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(1)

(2)

(3)

(4)

(5)

(6)

STANDARD FORM 30 (REV. 10-83) BACK

(1) Accounting classification Net increase $

Amendment 2
Questions for large shaft revised

File details come from the government source that posted it. Updated .