Lake Barkley Resource Manager's Office & Visitor Center Roof Replacement
Award Notice Posted
- Solicitation number
- W912P5-17-B-0010
- Agency
-
ENDIST Nashville
US Army Corps of Engineers, Department of Defense
- Awarded
- to Aaecon General Contracting LLC
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- W912P517C0013 Federal contract award
- NAICS code
- 238160 Roofing Contractors
- PSC
- Not on record
- Place of performance
- U.S. Army Corps of Engineers 200 Barkley Dam Overlook Drive Grand Rivers, Kentucky 42045, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
This is a Solicitation notice for the Lake Barkley Resource Manager's Office and Visitor Center Roof Replacement.
Located at 200 Barkley Dam Overlook Drive, Grand Rivers, KY 42045, the Lake Barkley Resource Manager's Office and Visitor Center Roof Replacement project is described as follows:
The existing building consists of three sections: a cedar-sided, hip-roof framed (3:12 slope) multi-slope center portion that is currently covered by asphalt shingles (approx. 4000 sq. ft.); and two lower level wings (north, 945 sq. ft.; and south, 1,009 sq. ft.) of cast-in-place concrete construction with flat roofs of varying composition.
The existing sloped roofs shall have all roofing material removed to the bare plywood sheathing. Any sheathing found to be in unsound condition shall be removed and replaced in kind.
The existing flat roof areas shall have all roofing material removed to the bare gypsum-concrete deck. On the north wing, a portion of the cast-in-place concrete parapet wall that rises to form the railing of the ramp to the observation deck shall be saw-cut and demolished to an elevation level with the top of the parapet. The existing roof mounted exhaust fans shall be removed from the south wing and the roof openings prepared to receive new exhaust ductwork.
Abandon existing roof drains in place and cap drain lines. Any additional roof mounted items on the two flat-roofed wings shall be removed or relocated. All wood in contact with concrete or masonry shall be pressure treated. Provide and install prefabricated single sloped roof trusses on both north and south wings. Truss design shall be by a professional engineer licensed in the state of Kentucky and experienced in the design and fabrication of prefabricated wood trusses.
Provide and install new end-wall framing and sheathing. Provide and install new roof underlayment over the entire building's roof surface. Provide and install standing seam aluminum roofing and associated trim and flashing over the entire building's roof surface. Panels shall be warranted for not less than twenty (20) years. Provide and install gutters and downspouts of material matching the roof panels.
Provide and install blown-in cellulose loose fill insulation over a 6-mil polyethylene vapor barrier sufficient to achieve an R-50 rating. Fabricate and install access doors into attic areas above both wings.
A guided site visit was conducted 17 Aug 2017. This will be the only organized site visit for this project. If you missed the scheduled site visit, no other arrangements will be made due to personnel availability and time restrictions.
Update #2 ·
This is a Solicitation notice for the Lake Barkley Resource Manager's Office and Visitor Center Roof Replacement.
Located at 200 Barkley Dam Overlook Drive, Grand Rivers, KY 42045, the Lake Barkley Resource Manager's Office and Visitor Center Roof Replacement project is described as follows:
The existing building consists of three sections: a cedar-sided, hip-roof framed (3:12 slope) multi-slope center portion that is currently covered by asphalt shingles (approx. 4000 sq. ft.); and two lower level wings (north, 945 sq. ft.; and south, 1,009 sq. ft.) of cast-in-place concrete construction with flat roofs of varying composition.
The existing sloped roofs shall have all roofing material removed to the bare plywood sheathing. Any sheathing found to be in unsound condition shall be removed and replaced in kind.
The existing flat roof areas shall have all roofing material removed to the bare gypsum-concrete deck. On the north wing, a portion of the cast-in-place concrete parapet wall that rises to form the railing of the ramp to the observation deck shall be saw-cut and demolished to an elevation level with the top of the parapet. The existing roof mounted exhaust fans shall be removed from the south wing and the roof openings prepared to receive new exhaust ductwork.
Remove existing roof drains and cap drain lines. Any additional roof mounted items on the two flat-roofed wings shall be removed or relocated. All wood in contact with concrete or masonry shall be pressure treated. Provide and install prefabricated single sloped roof trusses on both north and south wings. Truss design shall be by a professional engineer licensed in the state of Kentucky and experienced in the design and fabrication of prefabricated wood trusses.
Provide and install new end-wall framing and sheathing. Provide and install new roof underlayment over the entire building's roof surface. Provide and install standing seam aluminum roofing and associated trim and flashing over the entire building's roof surface. Panels shall be warranted for not less than twenty (20) years. Provide and install gutters and downspouts of material matching the roof panels.
Provide and install blown-in cellulose loose fill insulation over a 6-mil polyethylene vapor barrier sufficient to achieve an R-50 rating. Fabricate and install access doors into attic areas above both wings.
Provide and install new ductwork, in-line exhaust fans, exhaust louvers, and all associated electrical wiring and controls to extend existing ductwork to the east end-wall of the south wing. New exhaust system final design shall be performed by a professional mechanical engineer licensed in the state of Kentucky. Final exhaust system design shall be submitted for approval.
A guided site visit has been arranged to aid in preparation of offerors' bids for 17 Aug 2017, 1:00 to 3:00 PM (Central Daylight Time). Participants will meet in the Lake Barkley Resource Manager's Conference Room. The Visitor Center telephone is (270) 362-4236.
All participants are required to have the necessary personal protective equipment, i.e. hard hat, safety glasses, and steel-toed shoes before participating in the site inspection. Contractors who do not have these items may not be able to participate in the inspection.
Persons wishing to participate in the site visit must register with J.W. Purcell via email at James.W.Purcell@usace.army.mil within 48 hours of the start time by providing name, phone number, company, and names and number of people from the company participating. For questions and /or concerns regarding the site visit, please contact J.W. Purcell via email.
This will be the only organized site visit for this project. If you miss the scheduled site visit, no other arrangements will be made due to personnel availability and time restrictions.
Update #1 ·
This is a Pre-Solicitation notice, the full solicitation with all drawings and specifications is expected to be published the week of 7 August 2017.
Located at 200 Barkley Dam Overlook Drive, Grand Rivers, KY 42045, the Lake Barkley Resource Manager's Office and Visitor Center Roof Replacement project is described as follows:
The existing building consists of three sections: a cedar-sided, hip-roof framed (3:12 slope) multi-slope center portion that is currently covered by asphalt shingles (approx. 4000 sq. ft.); and two lower level wings (north, 945 sq. ft.; and south, 1,009 sq. ft.) of cast-in-place concrete construction with flat roofs of varying composition.
The existing sloped roofs shall have all roofing material removed to the bare plywood sheathing. Any sheathing found to be in unsound condition shall be removed and replaced in kind.
The existing flat roof areas shall have all roofing material removed to the bare gypsum-concrete deck. On the north wing, a portion of the cast-in-place concrete parapet wall that rises to form the railing of the ramp to the observation deck shall be saw-cut and demolished to an elevation level with the top of the parapet. The existing roof mounted exhaust fans shall be removed from the south wing and the roof openings prepared to receive new exhaust ductwork.
Remove existing roof drains and cap drain lines. Any additional roof mounted items on the two flat-roofed wings shall be removed or relocated. All wood in contact with concrete or masonry shall be pressure treated. Provide and install prefabricated single sloped roof trusses on both north and south wings. Truss design shall be by a professional engineer licensed in the state of Kentucky and experienced in the design and fabrication of prefabricated wood trusses.
Provide and install new end-wall framing and sheathing. Provide and install new roof underlayment over the entire building's roof surface. Provide and install standing seam aluminum roofing and associated trim and flashing over the entire building's roof surface. Panels shall be warranted for not less than twenty (20) years. Provide and install gutters and downspouts of material matching the roof panels.
Provide and install blown-in cellulose loose fill insulation over a 6-mil polyethylene vapor barrier sufficient to achieve an R-50 rating. Fabricate and install access doors into attic areas above both wings.
Provide and install new ductwork, in-line exhaust fans, exhaust louvers, and all associated electrical wiring and controls to extend existing ductwork to the east end-wall of the south wing. New exhaust system final design shall be performed by a professional mechanical engineer licensed in the state of Kentucky. Final exhaust system design shall be submitted for approval.
A guided site visit has been arranged to aid in preparation of offerors' bids for 17 Aug 2017, 1:00 to 3:00 PM (Central Daylight Time). Participants will meet in the Lake Barkley Resource Manager's Conference Room. The Visitor Center telephone is (270) 362-4236.
All participants are required to have the necessary personal protective equipment, i.e. hard hat, safety glasses, and steel-toed shoes before participating in the site inspection. Contractors who do not have these items may not be able to participate in the inspection.
Persons wishing to participate in the site visit must register with J.W. Purcell via email at James.W.Purcell@usace.army.mil within 48 hours of the start time by providing name, phone number, company, and names and number of people from the company participating. For questions and /or concerns regarding the site visit, please contact J.W. Purcell via email.
This will be the only organized site visit for this project. If you miss the scheduled site visit, no other arrangements will be made due to personnel availability and time restrictions.
Files
| File | Type | Posted |
|---|---|---|
| Abstract_completed1.pdf | ||
| Site_Visit_Roster.pdf | ||
| W912P5-17-B-0010Am1_TSpecs-pages.pdf | ||
| W912P5-17-B-0010_Plans.pdf | ||
| W912P5-17-B-0010-0001.pdf | ||
| W912P5-17-B-0010_TSpecs.pdf | ||
| Asbestos_Survey.pdf | ||
| W912P5-17-B-0010.pdf | ||
| BARRMRR_Plans.pdf | ||
| BARRMRR_TSpecs.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Center Hill Dam Site Restoration Project | Award Notice | |
| This notice | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity