LAK-DS Pair-Gain Modem Upgrade-Replacement for Bldg. 10330
Closed Solicitation Posted
- Solicitation number
- FA301624Q5129
- Agency
- Air Education and Training Command Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- Points of contact
-
- Joseph Gyakari joseph.gyakari@us.af.mil (210) 671-1705
- Nichole Ray nichole.ray.1@us.af.mil (210) 671-1752
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Air Education and Training Command is seeking to procure the engineering, furnishing, installation, and testing of new single mode, loose buffer tube, water blocked, outside plant fiber optic cable suitable for underground applications. The key requirements include compliance with RUS 7 CFR 1755.900 criteria, industry standards for cable marking, jacket, rip cords, water blocking, fiber color coding, jacketing materials, mode field diameter, core cladding concentricity, attenuation, and dispersion characteristics. The contractor must also comply with the current TIA telecommunication installation and testing commercial standard and base installation standards. Important dates include the unescorted base access request due on July 15, 2024, the site visit on July 23, 2024, the deadline for questions on July 26, 2024, and the proposal submission deadline on August 5, 2024.
This opportunity is set aside for small businesses. The place of performance is from Building 10203 to Building 10330 at JBSA-Lackland. This is a firm fixed price contract with no partial or progress payments. The value of the contract is not specified in the solicitation notice.
Notice text
5 versions
Update #5 · Latest ·
The Contractor shall Engineer, Furnish, Install, and Test (EFI and T) new single mode (SM), loose buffer tube, water blocked, outside plant (OSP) fiber optic cable (FOC) suitable for underground applications in accordance with Attachment 1-Statement of Work. This requirement is from Bldg. 10203 to Bldg. 10330 at JBSA-Lackland. The intent is to install the cable in one continuous length, to the extent that it is practical. The cable will meet RUS 7 CFR 1755.900 criteria; will comply with industry standards with regard to manufacturers? cable marking, jacket, rip cords, water blocking, fiber color coding, jacketing materials, etc. In addition, the FOC will comply with industry standards with regard to mode field diameter, core cladding concentricity, attenuation, and dispersion characteristics at 1310 nm and 1550 nm. The Contractor shall comply with the current TIA telecommunication installation and testing commercial standard and base installation standards. All equipment, supplies, and materials provided shall be new and not refurbished. This is a firm fixed price contract in which the contractor shall provide non-personal services, to include all personnel, equipment, tools, supervision, and other items and services necessary to complete the specific requirements IAW the attached SOW. This requirement shall not provide partial or progress payments. Copies of all required licenses, certificates and permits shall be provided to the Government upon request.**Please take note of the below key dates**Unescorted Base Access Request (UAR) due date: 15 July 2024 at 2:00 PM CST. Site Visit: 23 July 2024 at 10:30 AM CST. Questions due date: 26 July 2024 at 2:00 PM CST. Proposal Submission due date: 5 August 2024 at 2:00 PM CST. Point of Contact: Contract Specialist: Mr. Joseph Gyakari, Email: joseph.gyakari@us.af.mil; Contracting Officer: Mr. Doralo Fuller, Email: doralo.fuller@us.af.mil.-------------------------***Amendment 0004***The purpose of this amendment is apply the following changes: 1. Extend the RFQ closing date from 8 August 2024 @ 3:00PM CST to 13 August 2024 @ 3:00PM CST. 2. Incorporate a revised RFQ document. Additions are highlighted in red, Strikethrough has been applied to all exclusions. All other terms and conditions to the RFQ remain unchanged. --------------------------***AMENDMENT 0003*** The purpose of this amendment is to incorporate revision 2 of the Statement of Works (SOW), dated 8-2-2024-Additions are highlighted in red, Strikethrough has been applied to all exclusions.--------------------***AMENDMENT 0002*** The purpose of this amendment is to extend the Request for Quote (RFQ) closing date from 5 August 2024 @ 3:00PM CST to 8 August 2024 @ 2:00PM CST. All other terms and conditions to the RFQ remain unchanged--------------------. ***AMENDMENT 0001*** The purpose of this amendment is to apply the following changes:(a) Add a revised SOW dated 7/31/2024-Additions are highlighted in red, Strikethrough has been applied to exclusions (Attachment 1).(b) Add responses to the contractor submitted questions and answers (Attachment 3).(c) Incorporate the Service Contract Act Wage Determination (Attachment 6)(b) Other than the changes mentioned above, all other terms and conditions to the RFQ remain unchanged.**AMENDMENT 0001**The purpose of this amendment is to apply the following changes:(a) Add a revised SOW dated 7/31/2024-Additions are highlighted in red, Strikethrough has been applied to exclusions (Attachment 1).(b) Add responses to contractor submitted questions and answers ((Attachment 3).(c) Add the Service Contract Act (SCA) Wage Determination (Attachment 6)(d) Other than the changes mentioned above, all other terms and conditions to the RFQ remain unchanged.
Update #4 ·
The Contractor shall Engineer, Furnish, Install, and Test (EFI and T) new single mode (SM), loose buffer tube, water blocked, outside plant (OSP) fiber optic cable (FOC) suitable for underground applications in accordance with Attachment 1-Statement of Work. This requirement is from Bldg. 10203 to Bldg. 10330 at JBSA-Lackland. The intent is to install the cable in one continuous length, to the extent that it is practical. The cable will meet RUS 7 CFR 1755.900 criteria; will comply with industry standards with regard to manufacturers? cable marking, jacket, rip cords, water blocking, fiber color coding, jacketing materials, etc. In addition, the FOC will comply with industry standards with regard to mode field diameter, core cladding concentricity, attenuation, and dispersion characteristics at 1310 nm and 1550 nm. The Contractor shall comply with the current TIA telecommunication installation and testing commercial standard and base installation standards. All equipment, supplies, and materials provided shall be new and not refurbished. This is a firm fixed price contract in which the contractor shall provide non-personal services, to include all personnel, equipment, tools, supervision, and other items and services necessary to complete the specific requirements IAW the attached SOW. This requirement shall not provide partial or progress payments. Copies of all required licenses, certificates and permits shall be provided to the Government upon request.**Please take note of the below key dates**Unescorted Base Access Request (UAR) due date: 15 July 2024 at 2:00 PM CST. Site Visit: 23 July 2024 at 10:30 AM CST. Questions due date: 26 July 2024 at 2:00 PM CST. Proposal Submission due date: 5 August 2024 at 2:00 PM CST. Point of Contact: Contract Specialist: Mr. Joseph Gyakari Email: joseph.gyakari@us.af.mil; Contracting Officer: Mr. Doralo Fuller Email: doralo.fuller@us.af.mil.-------------------------***AMENDMENT 0003*** The purpose of this amendment is to incorporate revision 2 of the Statement of Works (SOW), dated 8-2-2024-Additons are highlighted in red, Strikethrough has been applied to all exclusions.--------------------***AMENDMENT 0002*** The purpose of this amendment is to extend the Request for Proposal (RFP) closing date from 5 August 2024 @ 3:00PM CST to 8 August 2024 @ 2:00PM CST. All other terms and conditions to the TOPR remain unchanged--------------------. ***AMENDMENT 0001*** The purpose of this amendment is to apply the following changes:(a) Add a revised SOW dated 7/31/2024-Additions are highlighted in red, Strikethrough has been applied to exclusions (Attachment 1).(b) Add responses to the contractor submitted questions and answers (Attachment 3).(c) Incorporate the Service Contract Act Wage Determination (Attachment 6)(b) Other than the changes mentioned above, all other terms and conditions to the TOPR remain unchanged.**AMENDMENT 0001**The purpose of this amendment is to apply the following changes:(a) Add a revised SOW dated 7/31/2024-Additions are highlighted in red, Strikethrough has been applied to exclusions (Attachment 1).(b) Add responses to contractor submitted questions and answers ((Attachment 3).(c) Add the Service Contract Act (SCA) Wage Determination (Attachment 6)(d) Other than the changes mentioned above, all other terms and conditions to the TOPR remain unchanged.
Update #3 ·
The Contractor shall Engineer, Furnish, Install, and Test (EFI and T) new single mode (SM), loose buffer tube, water blocked, outside plant (OSP) fiber optic cable (FOC) suitable for underground applications in accordance with Attachment 1-Statement of Work. This requirement is from Bldg. 10203 to Bldg. 10330 at JBSA-Lackland. The intent is to install the cable in one continuous length, to the extent that it is practical. The cable will meet RUS 7 CFR 1755.900 criteria; will comply with industry standards with regard to manufacturers? cable marking, jacket, rip cords, water blocking, fiber color coding, jacketing materials, etc. In addition, the FOC will comply with industry standards with regard to mode field diameter, core cladding concentricity, attenuation, and dispersion characteristics at 1310 nm and 1550 nm. The Contractor shall comply with the current TIA telecommunication installation and testing commercial standard and base installation standards. All equipment, supplies, and materials provided shall be new and not refurbished. This is a firm fixed price contract in which the contractor shall provide non-personal services, to include all personnel, equipment, tools, supervision, and other items and services necessary to complete the specific requirements IAW the attached SOW. This requirement shall not provide partial or progress payments. Copies of all required licenses, certificates and permits shall be provided to the Government upon request.**Please take note of the below key dates**Unescorted Base Access Request (UAR) due date: 15 July 2024 at 2:00 PM CST. Site Visit: 23 July 2024 at 10:30 AM CST. Questions due date: 26 July 2024 at 2:00 PM CST. Proposal Submission due date: 5 August 2024 at 2:00 PM CST. Point of Contact: Contract Specialist: Mr. Joseph Gyakari Email: joseph.gyakari@us.af.mil; Contracting Officer: Mr. Doralo Fuller Email: doralo.fuller@us.af.mil.---------------- ***AMENDMENT 0002*** The purpose of this amendment is to extend the Request for Proposal (RFP) closing date from 5 August 2024 @ 3:00PM CST to 8 August 2024 @ 2:00PM CST. All other terms and conditions to the TOPR remain unchanged---------------. ***AMENDMENT 0001*** The purpose of this amendment is to apply the following changes:(a) Add a revised SOW dated 7/31/2024-Additions are highlighted in red, Strikethrough has been applied to exclusions (Attachment 1).(b) Add responses to the contractor submitted questions and answers (Attachment 3).(c) Incorporate the Service Contract Act Wage Determination (Attachment 6)(b) Other than the changes mentioned above, all other terms and conditions to the TOPR remain unchanged.**AMENDMENT 0001**The purpose of this amendment is to apply the following changes:(a) Add a revised SOW dated 7/31/2024-Additions are highlighted in red, Strikethrough has been applied to exclusions (Attachment 1).(b) Add responses to contractor submitted questions and answers ((Attachment 3).(c) Add the Service Contract Act (SCA) Wage Determination (Attachment 6)(d) Other than the changes mentioned above, all other terms and conditions to the TOPR remain unchanged.
Update #2 ·
The Contractor shall Engineer, Furnish, Install, and Test (EFI and T) new single mode (SM), loose buffer tube, water blocked, outside plant (OSP) fiber optic cable (FOC) suitable for underground applications in accordance with Attachment 1-Statement of Work. This requirement is from Bldg. 10203 to Bldg. 10330 at JBSA-Lackland. The intent is to install the cable in one continuous length, to the extent that it is practical. The cable will meet RUS 7 CFR 1755.900 criteria; will comply with industry standards with regard to manufacturers? cable marking, jacket, rip cords, water blocking, fiber color coding, jacketing materials, etc. In addition, the FOC will comply with industry standards with regard to mode field diameter, core cladding concentricity, attenuation, and dispersion characteristics at 1310 nm and 1550 nm. The Contractor shall comply with the current TIA telecommunication installation and testing commercial standard and base installation standards. All equipment, supplies, and materials provided shall be new and not refurbished. This is a firm fixed price contract in which the contractor shall provide non-personal services, to include all personnel, equipment, tools, supervision, and other items and services necessary to complete the specific requirements IAW the attached SOW. This requirement shall not provide partial or progress payments. Copies of all required licenses, certificates and permits shall be provided to the Government upon request.**Please take note of the below key dates**Unescorted Base Access Request (UAR) due date: 15 July 2024 at 2:00 PM CST. Site Visit: 23 July 2024 at 10:30 AM CST. Questions due date: 26 July 2024 at 2:00 PM CST. Proposal Submission due date: 5 August 2024 at 2:00 PM CST. Point of Contact: Contract Specialist: Mr. Joseph Gyakari Email: joseph.gyakari@us.af.mil; Contracting Officer: Mr. Doralo Fuller Email: doralo.fuller@us.af.milAMENDMENT 0001The purpose of this amendment is to apply the following changes:(a) Add a revised SOW dated 7/31/2024-Additions are highlighted in red, Strikethrough has been applied to exclusions (Attachment 1).(b) Add responses to the contractor submitted questions and answers (Attachment 3).(c) Incorporate the Service Contract Act Wage Determination (Attachment 6)(b) Other than the changes mentioned above, all other terms and conditions to the TOPR remain unchanged.**AMENDMENT 0001**The purpose of this amendment is to apply the following changes:(a) Add a revised SOW dated 7/31/2024-Additions are highlighted in red, Strikethrough has been applied to exclusions (Attachment 1).(b) Add responses to contractor submitted questions and answers ((Attachment 3).(c) Add the Service Contract Act (SCA) Wage Determination (Attachment 6)(d) Other than the changes mentioned above, all other terms and conditions to the TOPR remain unchanged.
Update #1 ·
The Contractor shall Engineer, Furnish, Install, and Test (EFI and T) new single mode (SM), loose buffer tube, water blocked, outside plant (OSP) fiber optic cable (FOC) suitable for underground applications in accordance with Attachment 1-Statement of Work. This requirement is from Bldg. 10203 to Bldg. 10330 at JBSA-Lackland. The intent is to install the cable in one continuous length, to the extent that it is practical. The cable will meet RUS 7 CFR 1755.900 criteria; will comply with industry standards with regard to manufacturers? cable marking, jacket, rip cords, water blocking, fiber color coding, jacketing materials, etc. In addition, the FOC will comply with industry standards with regard to mode field diameter, core cladding concentricity, attenuation, and dispersion characteristics at 1310 nm and 1550 nm. The Contractor shall comply with the current TIA telecommunication installation and testing commercial standard and base installation standards. All equipment, supplies, and materials provided shall be new and not refurbished. This is a firm fixed price contract in which the contractor shall provide non-personal services, to include all personnel, equipment, tools, supervision, and other items and services necessary to complete the specific requirements IAW the attached SOW. This requirement shall not provide partial or progress payments. Copies of all required licenses, certificates and permits shall be provided to the Government upon request.**Please take note of the below key dates**Unescorted Base Access Request (UAR) due date: 15 July 2024 at 2:00 PM CST. Site Visit: 23 July 2024 at 10:30 AM CST. Questions due date: 26 July 2024 at 2:00 PM CST. Proposal Submission due date: 5 August 2024 at 2:00 PM CST. Point of Contact: Contract Specialist: Mr. Joseph Gyakari Email: joseph.gyakari@us.af.mil; Contracting Officer: Mr. Doralo Fuller Email: doralo.fuller@us.af.mil