Kootenai National Forest, Libby Ranger District - Pipe Creek Bridge Replacement NFSR 471 MP 0. 3

Award Notice Posted

Solicitation number
12034319R0003
Agency
Awarded
to Noble Excavating Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
12034319C0021 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Kootenai National Forest 12557 HWY 37 Libby, Montana 59923, United States

Notice details come from SAM.gov. Updated .

Notice text

8 versions

Update #8 · Latest ·

Awarded Vendors: Noble Excavating, Inc.. Contract Award Dollar Amount: $247,755. Contract Award Date: 2019-04-24.

Update #7 ·

Amendment 004: to correct language in Attachment 02 - FSSS Section 156.03 dealing with road closure time and period of instream work.
Closing date is extended to Tuesday 4/9/2019 at 4:00 PM PDT to the below address:
Idaho Panhandle National Forest
Attn: Michael Allred (Solicitation 12034319R0003)
3815 N. Schreiber Way
Coeur d'Alene ID 83815
If proposal packages have already been submitted and this amendment is the only update to the proposal package (no change is cost or technical proposal), it may be submitted electronically signed and scanned to mjallred@fs.fed.us by the closing date and time for this solicitation..

Update #6 ·

Post Solicitation - 2/27/2019
Closes -4/4/2019 Added: Mar 27, 2019 3:11 pm Modified: Mar 29, 2019 10:55 amTrack Changes Amendment 002 - Correction of 52.228-1 for Bid Guarentee and add Question and Answer.
Amendment 003 - Extend closing date to 4/4/2019 at 4:00 PM PT at the below address and change to Structural Back Fill requirement under Attachement 01.
Idaho Panhandle National Forst
Attn: Michael Allred (Soliciation 12034319R0003)
3815 N. Schreiber Way
Coeur d'Alene ID 83815.

Update #5 ·

Amendment 002 - Correction of 52.228-1 for Bid Guarentee and add Question and Answer. .

Update #4 ·

Amendment 001 - Extend the period of Performance to allow performance into 2020 with a final completion date of 8/31/2020. Once construction work begins contractor is expected to work continually until completion.

.

Update #3 ·

Add Attachment 01 - Plans.

Update #2 ·

Post Solicitation - 2/27/2019
Closes -4/2/2019.

Update #1 ·

Pipe Cr. Bridge - NFSR 471 MP 0.3


The project involves replacement of the Pipe Creek Bridge over Pipe Creek on the Kootenai National Forest.
Work includes but is not limited to bridge removal, bank shaping, geocell installation, supply and installation of precast concrete grade beams, supply and installation of the precast concrete bulb-tee bridge, supply and placement of riprap, installation of paved approaches, supply and installation of object markers, and site restoration.


The project is located on NFSR 471 MP 0.3. From Libby take Hwy 37 east to then north on Hwy 567 (68 Pipe Cr. Road) to Turner Mtn. for approximately 17 miles until intersection of NFSR 471/68. Take 471 0.3 miles to Pipe Cr Bridge.


Magnitude - Between $250,000 and $500,000


A Pre Bid Conference/Tour will not be held - Prospective bidders wishing to inquire about possibly visiting the site on their own may obtain directional information by contacting Tim Rusdal at the Forest Supervisors Office, Kootenai National Forest, telephone (406)283-7766 for additional information on site location.


Estimated Period of Performance - Start Work 7/15/2019 - 8/30/2019


Permits - The Forest Service will obtain the necessary stream preservation permits for this project and the contractor is responsible for adhering to the stipulations of these permits.

.

Files

File Type Posted
12034319R0003_004.pdf PDF
12034319R0003_003.pdf PDF
12034319R0003_0002.pdf PDF
12034319R0003_0001.pdf PDF
Attch_01-Drawings.pdf PDF
Attch_02_FSSS.pdf PDF
Attch_03-WageDetermination.pdf PDF
12034319R0003.pdf PDF