12034319R0003_0002.pdf

PDF 173 KB Posted

Attached to
Kootenai National Forest, Libby Ranger District - Pipe Creek Bridge Replacement NFSR 471 MP 0. 3
Solicitation number
12034319R0003
Issued by

About this file

Amendment 002

View the file

Other files

File Type Posted
12034319R0003_004.pdf PDF
12034319R0003_003.pdf PDF
12034319R0003_0001.pdf PDF
Attch_01-Drawings.pdf PDF
Attch_03-WageDetermination.pdf PDF
Attch_02_FSSS.pdf PDF
12034319R0003.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12034319R0003 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

02RC

COEUR D ALENE ID 83815

3815 SCHREIBER WAY

IDAHO MONTANA ACQUISITION TEAM

USDA FOREST SERVICE

03/11/20190002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/28/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

KOOTENAI NATIONAL FOREST,

Libby Ranger District

Pipe Creek Bridge Replacement NFSR 471 (MP 0.3)

The Purpose of this Amendment is to do the following:

1) Question and Answer (located on Page 2)

2) Correct Clause 52.228-1 to include Bid Guarantee requirements. Paragraph (c) changed to "The amount of the bid guarantee shall be 20 percent of the bid or $100,000.00, whichever is less."

Period of Performance: 07/15/2019 to 08/31/2020

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Kootenai National Forest, Libby Ranger District Pipe Creek Bridge Replacement – NFSR 471 (MP 0.3)

12034319R0003_0001

Question and Answer

Reference FAR Clause 52.215-20 Requirements for Certified Cost or Pricing Data and Data other than Certified cost or Pricing data - Are offerors required to prepare a response? Our firm has not been asked to prepare certified pricing in the past and are unsure what is required. Can you confirm whether this is a required provision and how we are to respond?

o Certified cost and pricing data information is locate in Provision 452.215-71 paragraph

(c) located on page 30. No certified cost and pricing data is required for this proposal.

The provision states the filled out schedule B would be used as the business/cost proposal.

Page 25 to 28 of the RFP includes a series of FAR and DFARS provisions. Do we need to provide information in response to the provisions or simply acknowledge that they are part of the Contract Clauses for the bid?

o Pages 25 – 28 includes FAR and AGAR provisions part of section L. In review it doesn’t appear any of these provisions require a response or fill in.

Please confirm whether one printed Original of the proposal is to be submitted or an Original and a Copy?

o In accordance with provision 452.215-71 paragraph d(a)(4) only 1 copy of the signed offer, technical proposal, and business proposal.

Could you tell me the Bid Bond % required to be submitted with the proposal for the subject project?

o This amendment corrects this under clause 52.228-1 to read, “The amount of the bid guarantee shall be 20% of the bid or $100,000.00, whichever is less.”

Where are the specs for the Bearing Pads.

o The material is specified on sheet 1 of 11 under the heading “Elastomeric Bearing Pad”.

This looks like a performance spec rather than a name brand.

I am looking for clarification on what you would like to see for mulching on this project. FP-03 states straw applied at 3200 lbs per acre using an air forced blower and anchored with stabilizing emulsion tackifier. Is this what you are looking for or will hand scattered straw be sufficient?

o In the General Notes on sheet 1 of the plans a note says erosion control per FP-03 section 157. That references 625 where our seed mix and application method are described. The FSSS Section 625 states that it replaces the FP-03 Section 625 in its entirety. There is no requirement for mulch in FSSS 625. Additionally, there is note on Page 3 of the plans that says “Seeding per 625”. No mulching is required in conjunction with the seeding.