12034319R0003_0001.pdf
PDF 89 KB Posted
- Attached to
- Kootenai National Forest, Libby Ranger District - Pipe Creek Bridge Replacement NFSR 471 MP 0. 3
- Solicitation number
- 12034319R0003
About this file
Amendment 001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12034319R0003_004.pdf | ||
| 12034319R0003_003.pdf | ||
| 12034319R0003_0002.pdf | ||
| Attch_01-Drawings.pdf | ||
| Attch_03-WageDetermination.pdf | ||
| Attch_02_FSSS.pdf | ||
| 12034319R0003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12034319R0003 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
02RC
COEUR D ALENE ID 83815
3815 SCHREIBER WAY
IDAHO MONTANA ACQUISITION TEAM
USDA FOREST SERVICE
03/11/20190001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/28/2019
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
KOOTENAI NATIONAL FOREST,
Libby Ranger District
Pipe Creek Bridge Replacement NFSR 471 (MP 0.3)
The Purpose of this Amendment is to do the following:
1) Extend the completion date by 1 year, from 08/31/2019 to 08/31/2020. (change SF-1442
Block 21 continued from 8/31/2019 to 8/31/2020 and Section F Clause 452.211-74 from
08/31/2019 to 08/31/2020).
2) Section M, M-1(1) Technical Approach to Perform the work - paragraph a. (ADD - Will
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12034319R0003/0001 evaluate flow chart for project completion to best meet the Forest Service needs. Preferred performance is FY19 field season but will allow performance into 2020 field season as outlined by the contractor).
This is due to the lengthy lead times for production of the concrete structures.
Contractor shall provide a progress schedule
(project time flow chart) outlining anticipated material ordering and construction schedule
(specifically indicating which field season contractor intens to operate and complete construction). This is to allow materials to be ordered and manufactured as required and performance may be completed in either the FY19 or FY20 field seasons.
This amendment does not extend the closing date for this RFP and all other Terms and Conditions remain unchanged.
Period of Performance: 07/15/2019 to 08/31/2020
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)