John day lock & DAM powerhouse submerged traveling screen (STS), new 130 ton gantry crane
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W9127N20R0005
- Agency
-
ENDIST Portland
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 333923 Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
- Place of performance
- Rufus OR 97050 USA
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Portland District is seeking to replace the existing 90 ton gantry crane at the John Day Lock and Dam powerhouse with a new 130 ton outdoor gantry crane through solicitation number W9127N20R0005. The contractor will be responsible for designing, manufacturing, testing, transporting, erecting and field testing the new crane, which must include a main hoist, auxiliary hoist and latching hoist capable of operating under varying environmental conditions and lifting different loads underwater across a wide elevation range by April 15, 2022. In addition, the contractor must deconstruct and safely remove the existing 90 ton crane. The formal solicitation is expected to be released in mid-May 2020.
There is no set-aside designated for this procurement. The NAICS code is 237990 and PSC code is 3925. The incumbent contractor maintains the existing 90 ton crane. The pre-solicitation notice did not provide an estimated value or budget range for this project to replace the crane. The new 130 ton crane must be completed and ready for service by April 15, 2022 to avoid disrupting trash removal operations during peak season at the John Day Lock and Dam powerhouse.
Notice text
PRESOLICITATION FOR THE JOHN DAY LOCK & DAM POWERHOUSE SUBMERGED TRAVELING SCREEN (STS), NEW 130 TON GANTRY CRANE – SOLICITATION W9127N20R0005
The U.S. Army Corps of Engineers, Portland District has a new requirement for a New 130 Ton, Submerged Traveling Screen (STS) Gantry Crane, at the John Day Lock and Dam, near Rufus, OR.
A formal solicitation will follow this announcement (currently planned for mid-May). This work consists of replacing the existing John Day Dam Powerhouse Submerged Traveling Screen (STS) 90 Ton Gantry Crane located at the John Day Lock and Dam, near Rufus, Oregon.
This project will consist of designing, manufacturing, factory testing, transporting, erecting, and field testing a new 130 ton, outdoor gantry crane comprising of a main hoist, an auxiliary hoist, and a latching hoist. The crane system will have built-in capabilities to meet a range of operating conditions, and modes that include: variable speed control; interlocking operating mode controls to eliminate operating hazards, reduce safety risks, and prevent use of systems that could result in equipment damage. The crane will need to be able to adapt to lifting different loads and load types under changing outdoor environmental conditions (such as high winds and variable weather conditions), and the ability to manage and handle loads underwater over a wide elevation range. In addition to the new crane work, the contractor will deconstruct/disassemble the existing 90 Ton STS Crane and safely remove it, in compliance with all environmental requirements.
Files
| File | Type | Posted |
|---|---|---|
| A.02 - Pre-Solicitation Notice - JD STS Crane.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| John day lock & DAM powerhouse submerged traveling screen (STS), new 130 ton gantry crane | Award Notice | |
| John day lock & DAM powerhouse submerged traveling screen (STS), new 130 ton gantry crane | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| John Day Below-the-Hook Lifting Devices Repair and Recertification | ENDIST Portland | No set-aside | |
| John day DAM navigation lock tainter valve (TV) repairs TV3 and TV4 | ENDIST Portland | No set-aside | |
| John day DAM unit 10 packing box replacement | ENDIST Portland | No set-aside | |
| Low Level Cranes- CSO | ACC Warren | No set-aside | |
| Bonneville Powerhouse II Unwatering Pump Replacement | ENDIST Portland | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity