John Day Dam Generator Water Cooling System Rehab
Closed Solicitation Posted
This opportunity was awarded. See its 2 award notices in the notice history.
- Solicitation number
- W9127N24R0006
- Agency
-
ENDIST Portland
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z1KA Maintenance Of Dams
- Place of performance
- Rufus, Oregon 97050, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a firm-fixed price contract for the John Day Dam Generator Water Cooling System Rehab project. The project requires replacing generator air coolers, header and drain piping, installing modulating valves and associated controls, and replacing existing flow gauges with new technology across 16 generator units at the John Day Powerhouse. The purpose is to prevent water infiltration into the generator windings and reduce condensation. Proposals will be evaluated on a best value trade-off basis considering past performance and technical/management approach, with the Government intending to award without discussions if possible. The solicitation due date is 11:00 A.M. on November 13, 2024.
This is a 100% small business set-aside acquisition. The estimated project cost is $5,000,000 to $10,000,000, with a period of performance of 742 days after notice to proceed. The work will be performed at the John Day Powerhouse, which is located on the Columbia River in Rufus, Oregon and Paterson, Washington. No incumbent contractor information was provided.
Notice text
5 versions
Update #5 · Latest ·
***31 October 2024*** Amendment 0005 - The purpose of this amendment is to provide revised specifications SECTION 40 95 00.00 26. Sections that were amended are 2.4.3 and 2.8. The sollicitation due date and time has also been revised to 11:00 A.M. on 13-NOV-2024
***29 October 2024*** Amendment 0004 - The purpose of this amendment is to provide revised specifications and draw ings f rom questions asked through bidder inquiries.
***21 October 2024*** Amendment 0003 - The purpose of this Amendment is to provide requested Resource Drawings
***03 October 2024 *** Amendments 0001 and 0002 have been posted to the solicitation. Please see admendments for details.
The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Generator Cooling Water System Rehab at John Day Dam, Rufus, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.
Project Scope: The U.S. Army Corps of Engineers, Portland District, has a requirement to replace generator air cooler, header and drain piping. The work also includes the installation of modulating valves and associated controls to generator air cooler and thrust bearing discharge heard lines as well as replacing existing flow gauges for the generator air coolers and thrust bearing coolers with ultrasonic or electromagnetic technology. The described work is to be conducted on 16 units.
Background: The John Day Powerhouse is located on the Columbia River, 112 miles east of Portland, Oregon, and is the third largest hydro-electric facility in the United States, with its 16 generators having a total capacity of 2408MW. The powerhouse lies on the border between Oregon and Washington. Units 1 to 14 are in Oregon while Units 15 and 16 are in Washington. This project is being performed to prevent or reduce water infiltration into the main unit generator windings to eliminate future failures. Since 2014, three main unit generators at John Day Powerhouse have experienced winding failures on startup that have been linked back to water infiltration into the generator windings. The purpose of this project is to minimize water leaks in the generator barrel, reduce condensation and improve water drainage. Water leaks from the generator air cooler vent pipes will be eliminated by replacing the problematic ½ inch overhead copper piping. This piping will be replaced with stainless tubing using compression or flared type connections. Soldered connections directly over the air coolers will be replace with flexible hose. This will reduce possible leak points and eliminate vent port alignment issues when swapping out coolers. The main units were designed without modulating or automatic shut off valves, despite modulating valves being standard on other government dams at time of John Day construction. Condensation will be reduced by adding modulation valves to the generator air cooler and thrust bearing oil cooler water discharge. Also, discharge flow meters will be replaced with new to eliminate the costly calibration issues with the existing devices. These modulating valves and flow meters will require associated controls and PLCs to integrate into the existing DDC system.
Contract Period of Performance: The estimated Period of Performance for this contract is 742 days after Notice to Proceed
Magnitude of Construction: The estimated cost of the project is $5,000,000 to $10,000,000.
Please see attached.
Update #4 ·
*** 29 October 20024*** Amendment 0004 - The purpose of this amendment is to provide revised specifications and draw ings f rom questions asked through bidder inquiries.
*** 21 October 2024*** Amendment 0003 - The purpose of this Amendment is to provide requested Resource Drawings
*** 03 October 2024 *** Amendments 0001 and 0002 have been posted to the solicitation. Please see admendments for details.
The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Generator Cooling Water System Rehab at John Day Dam, Rufus, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.
Project Scope: The U.S. Army Corps of Engineers, Portland District, has a requirement to replace generator air cooler, header and drain piping. The work also includes the installation of modulating valves and associated controls to generator air cooler and thrust bearing discharge heard lines as well as replacing existing flow gauges for the generator air coolers and thrust bearing coolers with ultrasonic or electromagnetic technology. The described work is to be conducted on 16 units.
Background: The John Day Powerhouse is located on the Columbia River, 112 miles east of Portland, Oregon, and is the third largest hydro-electric facility in the United States, with its 16 generators having a total capacity of 2408MW. The powerhouse lies on the border between Oregon and Washington. Units 1 to 14 are in Oregon while Units 15 and 16 are in Washington. This project is being performed to prevent or reduce water infiltration into the main unit generator windings to eliminate future failures. Since 2014, three main unit generators at John Day Powerhouse have experienced winding failures on startup that have been linked back to water infiltration into the generator windings. The purpose of this project is to minimize water leaks in the generator barrel, reduce condensation and improve water drainage. Water leaks from the generator air cooler vent pipes will be eliminated by replacing the problematic ½ inch overhead copper piping. This piping will be replaced with stainless tubing using compression or flared type connections. Soldered connections directly over the air coolers will be replace with flexible hose. This will reduce possible leak points and eliminate vent port alignment issues when swapping out coolers. The main units were designed without modulating or automatic shut off valves, despite modulating valves being standard on other government dams at time of John Day construction. Condensation will be reduced by adding modulation valves to the generator air cooler and thrust bearing oil cooler water discharge. Also, discharge flow meters will be replaced with new to eliminate the costly calibration issues with the existing devices. These modulating valves and flow meters will require associated controls and PLCs to integrate into the existing DDC system.
Contract Period of Performance: The estimated Period of Performance for this contract is 742 days after Notice to Proceed
Magnitude of Construction: The estimated cost of the project is $5,000,000 to $10,000,000.
Please see attached.
Update #3 ·
*** 21 October 2024*** Amendment 0003 - The purpose of this Amendment is to provide requested Resource Drawings
*** 03 October 2024 *** Amendments 0001 and 0002 have been posted to the solicitation. Please see admendments for details.
The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Generator Cooling Water System Rehab at John Day Dam, Rufus, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.
Project Scope: The U.S. Army Corps of Engineers, Portland District, has a requirement to replace generator air cooler, header and drain piping. The work also includes the installation of modulating valves and associated controls to generator air cooler and thrust bearing discharge heard lines as well as replacing existing flow gauges for the generator air coolers and thrust bearing coolers with ultrasonic or electromagnetic technology. The described work is to be conducted on 16 units.
Background: The John Day Powerhouse is located on the Columbia River, 112 miles east of Portland, Oregon, and is the third largest hydro-electric facility in the United States, with its 16 generators having a total capacity of 2408MW. The powerhouse lies on the border between Oregon and Washington. Units 1 to 14 are in Oregon while Units 15 and 16 are in Washington. This project is being performed to prevent or reduce water infiltration into the main unit generator windings to eliminate future failures. Since 2014, three main unit generators at John Day Powerhouse have experienced winding failures on startup that have been linked back to water infiltration into the generator windings. The purpose of this project is to minimize water leaks in the generator barrel, reduce condensation and improve water drainage. Water leaks from the generator air cooler vent pipes will be eliminated by replacing the problematic ½ inch overhead copper piping. This piping will be replaced with stainless tubing using compression or flared type connections. Soldered connections directly over the air coolers will be replace with flexible hose. This will reduce possible leak points and eliminate vent port alignment issues when swapping out coolers. The main units were designed without modulating or automatic shut off valves, despite modulating valves being standard on other government dams at time of John Day construction. Condensation will be reduced by adding modulation valves to the generator air cooler and thrust bearing oil cooler water discharge. Also, discharge flow meters will be replaced with new to eliminate the costly calibration issues with the existing devices. These modulating valves and flow meters will require associated controls and PLCs to integrate into the existing DDC system.
Contract Period of Performance: The estimated Period of Performance for this contract is 742 days after Notice to Proceed
Magnitude of Construction: The estimated cost of the project is $5,000,000 to $10,000,000.
Please see attached.
Update #2 ·
*** 03 October 2024 *** Amendments 0001 and 0002 have been posted to the solicitation. Please see admendments for details.
The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Generator Cooling Water System Rehab at John Day Dam, Rufus, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.
Project Scope: The U.S. Army Corps of Engineers, Portland District, has a requirement to replace generator air cooler, header and drain piping. The work also includes the installation of modulating valves and associated controls to generator air cooler and thrust bearing discharge heard lines as well as replacing existing flow gauges for the generator air coolers and thrust bearing coolers with ultrasonic or electromagnetic technology. The described work is to be conducted on 16 units.
Background: The John Day Powerhouse is located on the Columbia River, 112 miles east of Portland, Oregon, and is the third largest hydro-electric facility in the United States, with its 16 generators having a total capacity of 2408MW. The powerhouse lies on the border between Oregon and Washington. Units 1 to 14 are in Oregon while Units 15 and 16 are in Washington. This project is being performed to prevent or reduce water infiltration into the main unit generator windings to eliminate future failures. Since 2014, three main unit generators at John Day Powerhouse have experienced winding failures on startup that have been linked back to water infiltration into the generator windings. The purpose of this project is to minimize water leaks in the generator barrel, reduce condensation and improve water drainage. Water leaks from the generator air cooler vent pipes will be eliminated by replacing the problematic ½ inch overhead copper piping. This piping will be replaced with stainless tubing using compression or flared type connections. Soldered connections directly over the air coolers will be replace with flexible hose. This will reduce possible leak points and eliminate vent port alignment issues when swapping out coolers. The main units were designed without modulating or automatic shut off valves, despite modulating valves being standard on other government dams at time of John Day construction. Condensation will be reduced by adding modulation valves to the generator air cooler and thrust bearing oil cooler water discharge. Also, discharge flow meters will be replaced with new to eliminate the costly calibration issues with the existing devices. These modulating valves and flow meters will require associated controls and PLCs to integrate into the existing DDC system.
Contract Period of Performance: The estimated Period of Performance for this contract is 742 days after Notice to Proceed
Magnitude of Construction: The estimated cost of the project is $5,000,000 to $10,000,000.
Please see attached.
Update #1 ·
The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Generator Cooling Water System Rehab at John Day Dam, Rufus, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.
Project Scope: The U.S. Army Corps of Engineers, Portland District, has a requirement to replace generator air cooler, header and drain piping. The work also includes the installation of modulating valves and associated controls to generator air cooler and thrust bearing discharge heard lines as well as replacing existing flow gauges for the generator air coolers and thrust bearing coolers with ultrasonic or electromagnetic technology. The described work is to be conducted on 16 units.
Background: The John Day Powerhouse is located on the Columbia River, 112 miles east of Portland, Oregon, and is the third largest hydro-electric facility in the United States, with its 16 generators having a total capacity of 2408MW. The powerhouse lies on the border between Oregon and Washington. Units 1 to 14 are in Oregon while Units 15 and 16 are in Washington. This project is being performed to prevent or reduce water infiltration into the main unit generator windings to eliminate future failures. Since 2014, three main unit generators at John Day Powerhouse have experienced winding failures on startup that have been linked back to water infiltration into the generator windings. The purpose of this project is to minimize water leaks in the generator barrel, reduce condensation and improve water drainage. Water leaks from the generator air cooler vent pipes will be eliminated by replacing the problematic ½ inch overhead copper piping. This piping will be replaced with stainless tubing using compression or flared type connections. Soldered connections directly over the air coolers will be replace with flexible hose. This will reduce possible leak points and eliminate vent port alignment issues when swapping out coolers. The main units were designed without modulating or automatic shut off valves, despite modulating valves being standard on other government dams at time of John Day construction. Condensation will be reduced by adding modulation valves to the generator air cooler and thrust bearing oil cooler water discharge. Also, discharge flow meters will be replaced with new to eliminate the costly calibration issues with the existing devices. These modulating valves and flow meters will require associated controls and PLCs to integrate into the existing DDC system.
Contract Period of Performance: The estimated Period of Performance for this contract is 742 days after Notice to Proceed
Magnitude of Construction: The estimated cost of the project is $5,000,000 to $10,000,000.
Please see attached.
Files
Show all 11
Notice history
| Notice | Type | Posted |
|---|---|---|
| John Day Generator Water Cooling System Rehab | Award Notice | |
| John Day Dam Generator Water Cooling System Rehab | Award Notice | |
| This notice | Solicitation | |
| John Day Generator Cooling Water System Rehab | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| John day DAM unit 10 packing box replacement | ENDIST Portland | No set-aside | |
| John Day Dam Powerhouse HVAC Upgrades (W9127N27BA007) | ENDIST Portland | No set-aside | |
| John day DAM navigation lock tainter valve (TV) repairs TV3 and TV4 | ENDIST Portland | No set-aside |