This document is a solicitation amendment for contract W9127N24R0006, which is for the John Day Generator Cooling Water System Rehab project at John Day Dam in Rufus, Oregon. The purpose of this amendment is to provide revised specifications for Section 40 95 00.00 26, update the solicitation due date and time, and make other minor changes. The work includes replacing generator air cooler, header and drain piping, installing modulating valves and associated controls, and replacing existing flow gauges with ultrasonic or electromagnetic technology for 16 generator units. The estimated cost of the project is $5,000,000 to $10,000,000, and the estimated period of performance is 742 days after notice to proceed. The solicitation due date has been revised to 11:00 A.M. on 13-NOV-2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of thisamendment is to provide revised specifications SECTION 40 95 00.00 26. Sections that w ere amended are 2.4.3 and 2.8.
The sollicitation due date and time has also been revised to 11:00 A.M. on 13-NOV-2024. See Summary of Changes. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Oct-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127N24R0006
X 9B. DATED (SEE ITEM 11)
11-Sep-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Oct-2024
CODE
USACE, PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N24R0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 01 10 - TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 B.08 ATTACHMENT A -
OFFEROR'S
EXPERIENCE FORM
Attachment 2 B.08 ATTACHMENT B -
PAST PERFORMANCE
QUESTIONNAIRE
Attachment 3 Resource Drawings Attachment 4 Amendment 0004
Drawing JDP-1.004_M-
102XXX-ANSI_D-
Attachment 5 Amendment 0004 Specs 22 00 00.00 26 to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 B.08 ATTACHMENT A -
OFFEROR'S
EXPERIENCE FORM
Attachment 2 B.08 ATTACHMENT B -
PAST PERFORMANCE
QUESTIONNAIRE
Attachment 3 Resource Drawings Attachment 4 Amendment 0004
Drawing JDP-1.004_M-
102XXX-ANSI_D-
Attachment 5 Amendment 0004 Specs 22 00 00.00 26
Attachment 6 A.02 Revised Specification 40 95 00.00 26_amended
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 06-Nov-2024 11:00 AM to 13-Nov-2024 11:00 AM.
(End of Summary of Changes)
W9127N24R0006
SECTION 40 95 00.00 26
PROCESS CONTROL
10/07
PART 1 GENERAL
1.1 GENERAL INFORMATION
1.1.1 General
This Section covers the process controls for the John Day Generator Cooling Water System. When the specifications or drawings call for a programmable logic controller (PLC) the nomenclature within this specification for PLC and PAC (programmable automation controller) must be considered interchangeable. The Contractor must supply all additional equipment necessary to install the components in the configuration shown in the Contract drawings and in accordance with the manufacturers' recommendations. Provide and install instrumentation including liquid flow sensors, liquid temperature sensors, air temperature sensors, humidity sensors and liquid pressure sensors. PLC equipment will be provided and programmed by the government and installed by the contractor. Programming of all other equipment which requires it, will be done by the Contractor.
1.1.2 Related Documents
Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 00 Specification Sections apply to this Section.
1.1.3 Related Sections
a. Section 26 05 00.00 26, BASIC ELECTRICAL MATERIALS AND METHODS
b. Section 26 08 01.00 26, SYSTEMS TESTING AND COMMISSIONING
c. Section 01 33 26.00 26, ELECTRICAL AND CONTROL DRAWINGS AND DATA
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI C12.1 (2014; Errata 2016) Electric Meters - Code for Electricity Metering
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME BPVC SEC VIII D1 (2019) BPVC Section VIII-Rules for Construction of Pressure Vessels Division 1
ASTM INTERNATIONAL (ASTM)
ASTM B88 (2022) Standard Specification for Seamless
Copper Water Tube
ASTM B88M (2020) Standard Specification for Seamless Copper Water Tube (Metric)
ASTM D1238 (2013) Melt Flow Rates of Thermoplastics by Extrusion Plastometer
ASTM D1693 (2015) Standard Test Method for Environmental Stress-Cracking of Ethylene Plastics
ASTM E1137/E1137M (2020) Standard Specification for Industrial Platinum Resistance Thermometers
BUILDERS HARDWARE MANUFACTURERS ASSOCIATION (BHMA)
ANSI/BHMA A156.2 (2022) Bored and Preassembled Locks and Latches
U.S. FEDERAL COMMUNICATIONS COMMISSION (FCC)
FCC Part 68 Connection of Terminal Equipment to the Telephone Network (47 CFR 68)
INTERNATIONAL ELECTROTECHNICAL COMMISSION (IEC)
IEC 61131-3 (2013) Programmable Controllers - Part 3:
Programming Languages
IEC 60068-2-6 (2007) Environmental testing – Part 2-6:
Tests – Test Fc: Vibration (sinusoidal)
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 142 (2007; Errata 2014) Recommended Practice for Grounding of Industrial and Commercial Power Systems - IEEE Green Book
IEEE 802.3 (2022) Ethernet
IEEE C37.90 (2005; R 2011) Standard for Relays and Relay Systems Associated With Electric Power Apparatus
IEEE C37.90.1 (2013) Standard for Surge Withstand Capability (SWC) Tests for Relays and Relay Systems Associated with Electric Power Apparatus
IEEE C62.41.1 (2002; R 2008) Guide on the Surges Environment in Low-Voltage (1000 V and Less) AC Power Circuits
IEEE C62.41.2 (2002) Recommended Practice on Characterization of Surges in Low-Voltage (1000 V and Less) AC Power Circuits
IEEE Stds Dictionary (2009) IEEE Standards Dictionary: Glossary of Terms & Definitions
INTERNATIONAL SOCIETY OF AUTOMATION (ISA)
ISA 7.0.01 (1996) Quality Standard for Instrument Air
ISA MC96.1 (1982) Temperature Measurement Thermocouples
INTERNATIONAL TELECOMMUNICATION UNION (ITU)
ITU V.34 (1998) Data Communication Over the Telephone Network: A Modem Operating at Data Signaling Rates of up to 33,600 Bit/S for Use on the General Switched Telephone Network and on Leased Point-To-Point 2-Wire Telephone-Type Circuits
ITU V.42 bis (1990) Data Communication over the Telephone Network: Data Compression Procedures for Data Circuit-Terminating Equipment (DCE) Using Error Correction Procedures
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 60 Standards of Performance for New Stationary Sources
47 CFR 15 Radio Frequency Devices
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA 250 (2020) Enclosures for Electrical Equipment (1000 Volts Maximum)
NEMA ICS 1 (2022) Standard for Industrial Control and Systems: General Requirements
NEMA ICS 1.1 (1984; R 2020) Safety Guidelines for the Application, Installation and Maintenance of Solid State Control
NEMA ICS 2 (2000; R 2020) Industrial Control and Systems Controllers, Contactors, and Overload Relays Rated 600 V
NEMA ICS 3 (2005; R 2010) Medium-Voltage Controllers Rated 2001 to 7200 V AC
NEMA ICS 4 (2015) Application Guideline for Terminal Blocks
NEMA ICS 6 (1993; R 2016) Industrial Control and Systems: Enclosures
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2023) National Electrical Code
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)
NIST SP 250 (1991) Calibration Services Users Guide
TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)
TIA-232 (1997f; R 2012) Interface Between Data Terminal Equipment and Data Circuit-Terminating Equipment Employing Serial Binary Data Interchange
TIA-568.2 (2018d) Balanced Twisted-Pair Telecommunications Cabling and Components Standards
UNDERWRITERS LABORATORIES (UL)
UL 50 (2024) UL Standard for Safety Enclosures for Electrical Equipment, Non-Environmental Considerations
UL 508A (2018; Reprint Jul 2022) UL Standard for Safety Industrial Control Panels
UL 1059 (2019; Reprint Jul 2022) UL Standard for Safety Terminal Blocks
UL 508 (2018; Reprint Jul 2021) UL Standard for Safety Industrial Control Equipment
UL 94 (2023; Reprint Jan 2024) UL Standard for Safety Tests for Flammability of Plastic Materials for Parts in Devices and Appliances
UL 61058-1 (2017; 5th Edition) Safety Switches for Appliances - Part 1: General Requirements
1.3 DEFINITIONS
Definitions, Symbols, and engineering unit abbreviations must conform to IEEE Stds Dictionary, as applicable.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00, SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Equipment Installation; G, HDC
Control Drawings; G, HDC
Wiring Drawings; G, HDC
Schedule Of System I/O; G, HDC
SD-03 Product Data
Manufacturer's Catalog Data; G, HDC
Sensors and Meters; G, HDC
Spare Parts; G, HDC
Materials And Equipment List
SD-06 Test Reports
Testing, Adjusting And Commissioning; G, HDC
SD-07 Certificates
Installer's Qualifications; G, HDC
Field Test Plan; G, HDC
SD-08 Manufacturer's Instructions
Installation Procedures; G, HDC
SD-10 Operation and Maintenance Data
Training Manual; G,HDC
System I/O; G, HDC
Operation and Maintenance Manual; G, HDC
1.5 SUBMITTAL INSTRUCTIONS
Submit Shop Drawings and Product Data submittals within 90 days after Notice To Proceed. The final performance verification test report must be delivered 15 days after completion of testing.
1.6 QUALITY ASSURANCE
Submit and obtain approval of shop drawings and make approved shop drawings available prior to placement of conduits in slabs to ensure placement is coordinated with panel access locations.
1.7 STORAGE AND HANDLING
a. After completion of shop assembly and testing, enclose panels in heavy-duty polyethylene envelopes or secured sheeting to provide complete protection from dust and moisture. Place dehumidifiers inside the polyethylene covering.
b. Skid-mount the equipment for final transport. Show shipping weight on shipping tags, together with instructions for unloading, transporting, storing, and handling on job site.
1.8 SYSTEM DESCRIPTION
1.8.1 Design Requirements
a. The system must include, central processing units (CPUs), input/output (I/O) modules, communication models, power supplies, and associated accessory items to provide a complete and functional control system for Generator Cooling equipment.
b. Provide interchangeable devices for all units to the furthest extent possible for devices of similar type.
c. Provide PLC systems of same type and manufacture. If a more current model number exists, proposed PLC must satisfy or exceed salient characteristics specified in Part II - Products of this Section.
d. All 16 units must have similar instrumentation and controllers. One Generator Cooling Controller must be provided per unit.
e. Units 1-6 will have a slightly modified control scheme to allow for providing cooling water to the HVAC header.
1.8.2 Performance Requirements
The installed system must perform the functional and operational algorithms required for control of the process. A Field Test Plan showing when and how each system will be tested, material testing, and certification records, must be submitted for approval at least 30 calendar days prior to the start of testing and in accordance with Section 26 08 01.00 26, SYSTEMS
TESTING AND COMMISSIONING.
1.8.3 THEORY OF OPERATION
a. The controller will modulate the unit cooler water valves to a set point and reduce humidity and wastewater sent downstream. This will increase the temperature in the air housing, and reduce condensation.
Water flows will be monitored to be able to ensure enough water supply to the HVAC heat pump header piping, and that they are above the unit running minimum flow rate. Water temperatures will be monitored to measure heat extraction from the units and to ensure water temperatures are above the minimum for the HVAC system. Air housing humidity level will be monitored as well as ambient temperatures to increase air housing temperature above the dew point where possible.
b. The generator cooling system PLC will operate in three modes, Hand, Off, and Auto. Units 1-6 will have a slightly modified operation control scheme than Units 7-16 as described below. There will be a PLC installed at each unit. Each unit will have a dedicated Hand/Off/Auto control switch, which will be used to select between modes of operation described below. Because the valves fail to the open state, upon power loss, (full open with no control) they will open, and the existing manual control valve will need to be operated to control the flow when in Off mode.
1.8.3.1 Hand Mode
In "Hand" (also known as "manual") mode, the generator and thrust bearing motorized valves will be set to full open from the cooling system PLC; the existing manual valves will need to be operated to restrict or supply water flow for the unit. Process values will still be logged by the controller and available to the repeating analog and digital outputs to GDACS but will not impact controls. Unit heater will operate as described below in Unit Heater Control Section.
1.8.3.2 Off Mode
In Off mode, the motorized valves will be set to full closed from the cooling system PLC. Unit heater will operate as described below in Unit Heater Control Section.
1.8.3.3 Auto Mode
a. In Auto mode, the controller will modulate the generator cooler valve based on cooling requirements of the units, the HVAC header (Units 1-6 only), the dewpoint and setpoints. Certain setpoints should be user configurable within range indicated on the drawings. Setpoints shown are approximate, the final values will be determined during commissioning. Thrust bearing modulating valve will be controlled separately from generator cooler valve based on thrust bearing RTD input.
b. Units 1-6 also provide water to the HVAC heat pump header. They will operate in a slightly different manner, described below. Automatic control schemes will prioritize unit cooling and operation over HVAC needs; cooling will not be restricted to units when temperatures/load demand additional cooling supply, even if it is outside the HVAC input needs.
1.8.3.4 Unit Water Control
a. For all units, cooling water will be enabled when running, and reduced / off when offline.
b. Startup: When a unit is brought online, the control valves will open fully for 10 minutes (user configurable), then go to the set position based on the PID control loop for unit temperature. This will actuate the valve and remove any debris from the valve body, as well as flush the coolers and piping of some residual sediment.
c. Operation: A PID control loop (Proportional, Integral, Derivative) will provide valve output control to maintain air housing and stator core temperatures where feasible. When the temperature gets above or below the target abilities of the system, a second set of setpoints will override the control loop and open the valve fully. This will ensure a unit is not starved of cooling water; it is better to overcool a running unit than undercool a running unit.
d. If the humidity in the room is such that the dew point is being approached, generator cooling water flow will be restricted to raise the temperature above the dew point. The dew point control will be overridden when unit cooling demands; this is to say the dew point control will be a desired outcome for the control loop, but cooling requirements reign, even if some condensation is to occur. Condensation would be minimal in these cases, as the stator and rotor would be providing heat to the room, raising the dew point.
e. Shutdown: When a unit is shut down, cooling water will flow until stator temperature reaches a determined setpoint to remove latent heat from the unit. After the cooldown period, the flow will be restricted.
A minimum flow setpoint will be operator configured. Online and Offline minimum flows will be separate setpoints. Online setpoint will match existing minimum flow alarms, and offline flow setpoints will reduce debris settling and biofouling opportunities (Zebra Mussels, mud, etc.)
within the cooling tubes. They can be independently controlled and set to zero if needed. Generator coolers flow and thrust bearing coolers flow will have separate setpoints.
1.8.3.5 Unit Heater Control
Unit heaters will be turned off when a unit is running and turned on when the unit is shut down, and the air housing / stator temperature is below desired setpoint. Air housing temperature sensors will be installed on the inside of generator barrel, across air coolers. The Unit heater setpoint will differ from the cooling water setpoints as the stator coils may need to be heated to reduce condensation and water absorption while in shut down state.
1.8.3.6 Units 1-6 Controls
a. Units 1-6 supply water to the plant's HVAC system. The HVAC system has minimum flow, temperature, and pressure needs for proper and efficient operation. Operating below the HVAC process values will decrease HVAC efficiency, or in extreme cases the HVAC will shut down.
b. The plant operation and river water temperatures have been evaluated, and while no risk is possible to eliminate, the likelihood of the combined Units 1-6 not being able to supply water within the HVAC needs window is unlikely. A detailed cooling water discharge analysis indicate river water and cooler temperature through the unit were above minimum temperature needs and above flow requirements in the years analyzed.
c. When the HVAC demand is on, the units will supply water into the HVAC header as well as the discharge piping. The controllers will ensure minimum flow and temperatures are met for the HVAC system.
d. A minimum flow, pressure, and temperature setpoints will be operator configurable. Online and offline minimum flows will be separate setpoints. Online setpoint will match existing minimum flow alarms, and offline flow setpoints will reduce debris settling and biofouling opportunities (Zebra Mussels, mud, etc.) within the cooling tubes.
Should more flow be required for the HVAC system, units 1-6 will increase their valve positions until the flow is met, under the condition that unit air temperature stays above humidity dew point average by a set amount to prevent condensation. Online units will be providing required flow, offline units will not increase their flow upon HVAC demand. Unit 1-6 cooling controllers will utilize produced and consumed tags to coordinate flow to HVAC. In the case that online units can't meet HVAC flow demand, generator bypass valve, present at each unit with HVAC header connection, will have to be operated to provide more flow.
1.9 COORDINATION
The drawings indicate the extent and the general location and arrangement of equipment and wiring. The Contractor must become familiar with all details of the work and verify all dimensions in the field so that the equipment must be properly located and readily accessible. Panels, and other equipment and materials must be located to avoid interference with mechanical or structural features. If any conflicts occur necessitating departures from the drawings, details of and reasons for departures must be submitted and approved prior to implementing any change.
1.10 SHOP DRAWINGS
Shop drawings must be furnished no later than 30 calendar days prior to installation date. Provide updated and complete as-shipped drawings at the time of final factory testing. The Owner's Representative must review the drawings against the panel construction at the time of final factory testing. Drawings which do not reflect the actual construction of the panel will need to be revised and reviewed again by the Owner's Representative against the actual construction prior to shipment of the panel to the job site. 'As shipped' drawings which require revisions must be submitted to the Owner's Representative for review prior to the actual field review of these drawings against the panel construction. This process of revision and review of the drawings will be repeated as necessary to produce drawings which reflect the actual construction of the panel at the time of shipment. Do not ship panels to the site until the 'as-shipped' drawings are updated, complete, and reflect the actual 'as-shipped' status of the panel. Shop drawings must be dimensioned, to-scale, and show:
a. Panel layout
b. Arrangement, connection, and interconnection of PLC system components
c. Conduit Layout
d. Cable and Conduit Schedule
e. Wiring access locations
f. Wiring diagrams
g. Instrument loop diagrams
h. Schematics
PART 2 PRODUCTS
All drawings and devices will be the property of the Government and must be capable of being altered as needed by Government personnel. There will be no devices that have code or settings that are locked out as proprietary and unavailable for changes.
2.1 SYSTEM DESCRIPTION
Products described in this Section must be used to monitor and control the operation of process equipment as specified and in accordance with the theory of operation and control schematics shown on the drawings. The control system must provide for operator interaction, overall control system supervision, and process equipment control and monitoring. Provide hardware configured and sized to support expansion as specified and shown on the drawings.
2.1.1 Government Furnished Equipment (GFE)
This section lists GFE for reference only.
PLC Equipment:
MANUFACTURER PRODUCT DESCRIPTION QUANTITY
Allen Bradley 1769-L30ER CompactLogix 5370 L3 Controller, 2 EtherNet/IP ports, 1MB memory w/ supercap backup, up to 8 1769 I/O expansion modules, 16 EtherNet/IP and 120 TCP connections
Allen Bradley 1769-IQ16F 16 Point High Speed 24 VDC Input Module
Allen Bradley 1769-OW8I 8 Point Individually Isolated AC/DC Relay Output Module
Allen Bradley 1769-IR6 6 Channel RTD/Resistance Input Module
Allen Bradley 1769-PA4 120/240V AC Power Supply (5V @ 4 Amp)
Allen Bradley 1769-IF8 8 Channel Analog Voltage/Current Input Module
Allen Bradley 1769-OF8C 8 Channel Analog Current Output Module
Allen Bradley 1769-ECR Right End Cap Terminator 16
Allen Bradley 9324M-RLDT31 Studio 5000 Profes Professional Perpetual with Studio 5000 PROPS ESD 8x5 Supt
Allen Bradley 9701M-VWSSPT31 FactoryTalk View Studio Enterprise Perpetual with FT View SE STPS 8x5 Supt
MANUFACTURER PRODUCT DESCRIPTION QUANTITY
Panasonic Toughbook 40 Rugged Win 10 Pro 64-bit (includes Win 11 Pro License)
16 GB RAM
NVMe Wi-Fi 6 Intel Core i5 1145G7 Iris Xe Graphics 512 GB SSD TCG Opal Encryption 14" IPS touchscreen 1920 x 1080 (Full HD)
Network equipment:
MANUFACTURER PRODUCT DESCRIPTION QUANTITY
CISCO C9300-24S-A Catalyst 9300 24 GE SFP Ports, modular uplink Switch
CISCO C9300-NW-A-24 C9300 Network Advantage, 24-port license
CISCO SC9300UK9-177 Cisco Catalyst 9300 XE 17.7
UNIVERSAL UNIVERSAL
CISCO PWR-C1-715WAC-P 715W AC 80+ platinum Config 1 Power Supply
CISCO PWR-C1-715WAC-P/2 715W AC 80+ platinum Config 1 SecondaryPower Supply
CISCO CAB-TA-NA North America AC Type A Power Cable
CISCO C9300-NM-4G Catalyst 9300 4 x 1GE Network Module
CISCO C9300-SSD-NONE No SSD Card Selected 2
CISCO TE-C9K-SW TE agent for IOSXE on C9K 2
CISCO C9300-DNA-A-24S C9300 DNA Advantage, 24-port Fiber Term Licenses
CISCO C9300-DNA-A-24S-5Y C9300 DNA Advantage, 24-Port Fiber, 5 Year Term Li
CISCO PI-LFAS-T Prime Infrastructure Lifecycle & Assurance Term
- Smart Lic
CISCO PI-LFAS-AP-T-5Y PI Dev Lic for Lifecycle & Assurance Term 5Y
CISCO TE-EMBEDDED-T Cisco ThousandEyes Enterprise Agent IBN Embedded
CISCO TE-EMBEDDED-T-5Y ThousandEyes - Enterprise Agents
CISCO NETWORK-PNP-LIC Network Plug-n-Play Connect for zero-touch device deployment
CISCO GLC-GE-100FX 100FX SFP on GE ports 32
CISCO C9300-STACK-NONE No Stack Cable Selected 2
CISCO C9300-SPWR-NONE No Stack Power Cable Selected
CISCO GLC-SX-MMD++= 1000BASE-SX SFP transceiver module, MMF, 850nm, DOM
CISCO GLC-TE++= GLC-TE++= 1000BASE-T SFP,
TAA Compliant.
CISCO C9300-24T-A 16 Point High Speed 24 VDC Input Module
CISCO C9300-NW-A-24 C9300 Network Advantage, 24-port license
CISCO SC9300UK9-177 Cisco Catalyst 9300 XE 17.7
UNIVERSAL UNIVERSAL
CISCO PWR-C1-350WAC-P 350W AC 80+ platinum Config 1 Power Supply
CISCO PWR-C1-715WAC-P/2 715W AC 80+ platinum Config 1 SecondaryPower Supply
CISCO CAB-TA-NA North America AC Type A Power Cable
CISCO C9300-SSD-NONE No SSD Card Selected 16
CISCO TE-C9K-SW TE agent for IOSXE on C9K 16
CISCO C9300-DNA-A-24 C9300 DNA Advantage, 24-port Term Licenses
CISCO C9300-DNA-A-24-5Y C9300 DNA Advantage, 24-Port, 5 Year Term License
CISCO PI-LFAS-T Prime Infrastructure Lifecycle & Assurance Term
- Smart Lic
CISCO PI-LFAS-AP-T-5Y PI Dev Lic for Lifecycle & Assurance Term 5Y
CISCO D-DNAS-EXT-S-T Cisco DNA Spaces Extend Term License for Catalyst Switches
CISCO D-DNAS-EXT-S-5Y Cisco DNA Spaces Extend for Catalyst Switching - 5Year
CISCO TE-EMBEDDED-T Cisco ThousandEyes Enterprise Agent IBN Embedded
CISCO TE-EMBEDDED-T-5Y ThousandEyes - Enterprise Agents
CISCO C9300-NM-4G Catalyst 9300 4 x 1GE Network Module
CISCO NETWORK-PNP-LIC Network Plug-n-Play Connect for zero-touch device deployment
CISCO C9300-STACK-NONE No Stack Cable Selected 16
CISCO C9300-SPWR-NONE No Stack Power Cable Selected
CISCO GLC-SX-MMD++= 1000BASE-SX SFP transceiver module, MMF, 850nm, DOM
Install the above-listed parts according to the Contract drawings. Any remaining parts must be turned over to the Government as spares.
2.1.2 Operation
The control system provided under this specification must operate using direct digital control (DDC) algorithms or ladder logic type and supervisory control to provide the required sequences of operation. Input data to the controller must be obtained by using instruments and controls interfaced to mechanical, electrical, utility systems and other systems as shown and specified. All required setpoints, settings, alarm limits, and sequences of operation must be as identified in the database/ settings tables. The number and location of control panels shown on drawings must be provided as a minimum.
2.1.3 Points
Provide inputs to and outputs from the control system in accordance with the Input/Output (I/O) Summary Table indicated. Each connected analog output (AO), analog input (AI), digital output (DO), digital input (DI), resistance temperature detector (RTD) input and other input or output device connected to the control system must represent a "point" where referred to in this specification.
2.2 MATERIALS AND EQUIPMENT LIST
Manufacturer's Catalog Data composed of catalog cuts, brochures, circulars, specifications, product data, and printed information in sufficient detail and scope to verify compliance with the requirements of the Contract documents. Standard catalog data will not be acceptable unless irrelevant parts are marked out and relevant parts are clearly identified.
Manufacturer's catalog data must be included in the required Operation and Maintenance data as indicated above.
2.2.1 Standard Products
Materials and equipment must be standard unmodified products of a manufacturer regularly engaged in the manufacturing of such products.
Units of the same type of equipment must be products of a single manufacturer. Items of the same type and purpose must be identical and supplied by the same manufacturer, unless replaced by a new version approved by the Government.
2.2.2 Nameplates
Each major component of equipment must have the manufacturer's name and address, and the model and serial number in a conspicuous place. Laminated plastic nameplates must be provided for equipment devices and panels furnished. Each nameplate must identify the device. Labels must be coordinate with the schedules and the process and instrumentation drawings. Laminated plastic must be 1/8 inch thick. Nameplates must be a minimum of 1 by 3 inches with minimum 1/4 inch high engraved block lettering. Nameplates for devices smaller than 1 by 3 inches must be attached by a nonferrous metal chain. All other nameplates must be attached to the device.
2.3 GENERAL REQUIREMENTS
a. Equipment and wiring must be in accordance with NFPA 70, with proper consideration given to environmental conditions such as moisture, dirt, corrosive agents, and hazardous area classification.
b. Conform to NEMA ICS 1.1 for installation and application of the PLC system.
c. The equipment must consist of fully integrated microprocessor units specifically designed for operation in unconditioned audible noise and be able to withstand vibration testing of 2g in the frequency range of 10 to 500Hz as described in IEC 60068-2-6.
2.4 MONITORING AND CONTROL PARAMETERS
The control system must be complete including sensors, field preamplifiers, signal conditioners, offset and span adjustments, amplifiers, transducers, transmitters, control devices, engineering units conversions and algorithms for the applications; and must maintain the specified end-to-end process control loop accuracy from sensor to display and final control element.
Instrumentation equipment must be powered by a 24VDC power source, with local power supplies included as needed for signal transmission and subsystem operation. Connecting conductors must be suitable for installed service. All software and hardware must be provided, necessary for installation and programming of all instrumentation. Installation must be done in accordance with manufacturer's recommendation.
2.4.1 Transmitter
Unless indicated otherwise, each sensor must be provided with a transmitter, selected to match the sensor. Except where specifically indicated otherwise on the drawings, the transmitter must provide a 4 to 20 mA output signal proportional to the level of the measured parameter.
Accuracy must be plus or minus one percent of full scale reading with output error not exceeding plus or minus 0.5 percent of full scale.
Transmitter must be located where indicated, mounted integrally with the sensor, pipe mounted, wall mounted or installed in the control panel. The distance between the sensor and transmitter must not exceed the manufacturer's recommendation. Field preamplifiers and signal conditioners must be included when necessary to maintain the accuracy from sensor to the programmable logic controller or recorder. Transmitters must be rated NEMA 4X and IP65 at a minimum and be powered by 24VDC.
2.4.2 Liquid Service
Sensors and Meters in liquid service must be rated for continuous duty service at fluid approach velocities from 0.327 ft/s to 10 ft/s with correspondingly higher constriction velocities over a fluid temperature range from 40 degrees F to 120 degrees F at pressures up to 150 psi gage.
2.4.3 Flow Sensor
Liquid flow indication must be provided in GPM. Pressure taps must incorporate appropriate snubbers. Unless indicated otherwise, the flow transmitter must produce a signal that is proportional to the volumetric flow rate, compensated for fluid temperature, and must have an accuracy of plus or minus one percent of full flow. Flow transmitter must be located within 15 feet of the flow element. The flow transmitter must include a digital readout of the volumetric flow rate to three significant figures.
The controller must be provided with a minimum of three sets of dry contacts rated in accordance with NEMA ICS 1. The first set of contacts must close when the lower (warning) detection level has been exceeded. The second set of contacts must close when the upper (alarm) detection level has been exceeded. The third set of contacts must close when a controller malfunction has occurred, including loss of power or loss of sensor input.
The alarm levels must be individually adjustable. The controller must be provided with an audible warning horn that sounds when the upper detection level has been exceeded, and a warning horn silence button. The controller must provide a 4-20 mAdc output signal proportional to the measured parameter. Flow rate must be controlled to within plus or minus 5 percent of the design flow.
2.4.3.1 Ultrasonic Flow meter
New ultrasonic type flow meters must be provided for the generator air coolers and thrust bearing supply as shown on the drawings. Ultrasonic flow meters must meet the following requirements:
a. Ultrasonic Doppler type; with Inline transducer.
b. Flow sensor capable of a minimum operating range of 2.0 GPM up to 2000.
c. Capable of stable and accurate measurement (plus or minus 0.5 percent of rate and plus or minus 0.5 percent repeatability).
d. Housed in a NEMA Type 4X enclosure.
e. 4-20 mA Analog Output Signal.
f. Local numeric display with keypad for programming.
g. Operate on 24 Volts DC Power.
2.4.4 Pressure Instrumentation
Pressure taps must incorporate appropriate snubbers. The transmitter must provide a 4-20 mAdc output signal to the programmable logic controller, proportional to the measured parameter. The sensing element must be either capsule, diaphragm, bellows, Bourdon tube, or solid state as applicable for the installation. The pressure transducer must withstand up to 300 percent of rated pressure, with an accuracy of plus or minus 0.25 percent of full scale selected to put the design range of the measured pressure in the middle third of the transducer's range. Pressure must be measured in psi gage with a range of 0 to 150 psi. The transmitter output error must not exceed 0.1 percent of calibrated span.
2.4.5 Temperature Instrumentation
All devices must be suitable for process temperatures. Mercury must not be used in thermometers. The transmitter must provide a 4-20 mAdc output signal to the programmable logic controller, proportional to the measured parameter.
2.4.5.1 Liquid Temperature Sensor
Direct reading, hermetically sealed, suitable for external adjustment.
Accurate within one percent of full range. Stainless steel construction.
Complete with thermowell. Temperature must be measured in degrees C with a range of -10 to 150 degrees C.
2.4.5.2 Thermowell
Thermowell must be monel, brass, or copper for use in water lines; wrought iron for measuring flue gases; and austenitic stainless steel for other applications. Calibrated thermowells must be provided with threaded plug and chain, two inch lagging neck and inside diameter insertion neck as required for the application. The thermowell must include a connection box, sized to accommodate the temperature sensing devise.
2.4.5.3 Air Temperature Sensor
Air temperature sensors must be able to process temperatures in the range of zero to 100 degree C with an accuracy of a least plus or minus 0.3 percent FS.
2.4.6 Humidity Instrumentation
The Humidity sensor must have relative humidity range between zero and 100 percent RH, have an accuracy of plus or minus two percent. The transmitter must provide a 4-20 mA output signal to the programmable logic controller, proportional to the measured parameter.
2.4.7 Modulating Valve Actuators
Valve actuators must by powered by 110 VAC and be controlled by the PLC.
Actuator must be able to accept a 4-20mA control setpoint and provide a 4-20mA feedback signal. For valve specifications refer to Section
22 00 00.00 26 BASIC MECHANICAL MATERIALS AND METHODS.
2.5 WIRING DRAWINGS
a. The Contract Drawings provide installation and removal, schematic, layout, and elevation drawings for one generating unit. The design for one generating unit is typical for other generating units. The Contractor must use the Contract Drawings to generate detailed wiring drawings for each unit. Submit for approval Wiring Drawings in accordance with Section 01 33 26.00 26 ELECTRICAL AND CONTROL DRAWINGS AND DATA and 01 33 00 SUBMITTAL PROCEDURES.
b. Wiring connections must be heavy duty, self lifting, pressure type screw terminals to provide easy wire insertion and secure connections.
The terminals must accept two No.16 AWG wires. A hinged protective cover must be provided over the wiring connections. The cover must have write-on areas for identification of the external circuits.
c. CADD files must be compatible with Microstation Connect edition.
Drawings must comply with the latest USACE CADD standards.
2.6 INCIDENTAL MATERIALS AND EQUIPMENT
Provide all incidental materials and equipment required for a complete functional and successfully operating PLC system. These items include but are not limited to:
a. Power supplies.
b. Filters.
c. Isolation transformers.
d. Relays.
e. Delay or suppression devices.
f. Interconnecting devices.
g. Other items and appurtenances ordinarily furnished as part of a complete system.
2.7 ACCESSORIES
Provide all accessories and appurtenances required, whether indicated or not, for completely functioning PLC control systems capable of accomplishing the requirements of the Contract documents.
2.8 SPARE PARTS
a. Three - Sensor of each type and rating.
b. Three - Circuit breaker of each type and rating.
c. Three - Power supplies of each type.
d. One - flow meter, with associated transducers, for each size type provided.
e. Other spare parts identified in other spec sections and the Contract drawings must also be furnished.
PART 3 EXECUTION
3.1 EQUIPMENT INSTALLATION REQUIREMENTS
3.1.1 Equipment Installation
Where Installation procedures or part of the installation procedures are required to be in accordance with manufacturer's instructions, submit printed copies of those instructions prior to installation. Installation of the item must not proceed until manufacturer's instructions are received. Failure to submit manufacturer's instructions will be cause for rejection of the equipment or material.
a. Install instrumentation and communication equipment and cable grounding as necessary to preclude ground loops, noise, and surges from adversely affecting system operation.
b. Submit detail drawings containing complete piping, wiring, schematic, flow diagrams and any other details required to demonstrate that the system has been coordinated and will properly function as a unit. Include in the Drawings, as appropriate: product specific catalog cuts; a drawing index; a list of symbols; a series of drawings for each control system using abbreviations, symbols, nomenclature and identifiers as shown.
3.1.1.1 Isolation, Penetrations and Clearance from Equipment
Dielectric isolation must be provided where dissimilar metals are used for connection and support. Installation must provide clearance for control-system maintenance. Control system installation must not interfere with the clearance requirements for mechanical and electrical system maintenance.
3.1.1.2 Device Mounting
Devices must be installed in accordance with manufacturers' recommendations and as shown. Control devices to be installed in piping must be provided with required gaskets, flanges, thermal compounds, insulation, piping, fittings, and manual valves for shutoff, equalization, purging, and calibration. Any deviations must be documented and submitted to the Government for approval prior to mounting. Damaged insulation must be replaced or repaired after devices are installed to match existing work.
Damaged galvanized surfaces must be repaired by touching up with zinc paint.
3.2 DESIGN AND FABRICATION
3.2.1 Component Installation
a. Provide wire bending space per NEMA ICS 6.
b. Label wiring within the panel with wire numbers and run in wiring duct neatly tied and bundled with tie wraps or similar materials.
Identify each wire termination, including all jumpers unless shorter than three inches, with machine printed non metallic tube type markers that float on the wire at each termination. Arrange wire labels to permit reading of identification when installed. For additional requirements see Section 26 05 19.00 26, INSULATED WIRE AND CABLE.
c. Connect wiring internal to the panel to the "inside" of the terminal strip. Connect field wiring to the "outside" of the terminal strip.
Wires to enclosure door mounted components are considered as internal wires. Connect no more than two wires to any one control terminal point. Provide terminal block manufactures jumper bar assembly wherever feasible.
d. Arrange wiring inside the panel to separate low voltage/current signals of the milliamp or other low energy type from inductive power circuits and use shielded cables to carry those signals.
e. Connect grounds and shields of circuits which derive power internal to the panel to a panel common ground bus which must be grounded by the electrical Contractor in the field.
f. Physically separate signals entering controllers for amplification as control outputs from all line voltage wiring and shield with continuous foil shielding or enclose them in metal raceway.
g. Provide necessary power supplies for control equipment.
h. Termination requirements:
(1) Terminate panel wiring on device or terminal block screw terminals using ring-tongue type insulated crimp (compression) terminators.
(2) Terminate panel wiring on compression clamp style terminals using slip-on stud insulated crimp (compression) terminators.
(3) Stranded conductors must not be terminated bare to terminals or devices.
(4) Provide terminal strips for the termination of panel wiring not directly connected to panel mounted devices.
(5) Terminals must facilitate termination of two each conductors of the following wire sizes:
(a) Power applications: Wire size 10 AWG.
(b) Control applications: Wire size 12 AWG.
(c) Other: Wire size 14 AWG.
(6) Label each I/O terminal to indicate tag number of the conductor and connected device. Locate terminals for termination of multiconductor shielded cables adjacent to each other to minimize lengths of unshielded conductor at the terminations.
(7) Provide terminals for individual termination of each signal shield. Locate the terminal adjacent to the terminals for the signal conductors.
(8) Provide 20 percent excess terminals for future expansion.
(9) Provide a minimum of 2.5 inches between terminal strips and wireways or between terminal strips.
(10) The PLC discrete output must terminate on the auxiliary relays, if internal to the cabinet. Otherwise, terminate all PLC discrete I/O on terminal blocks as shown in the Contract drawings.
i. Conform to NEMA ICS 1.1 for installation and application of the PLC system.
j. PLC device arrangement:
Component placement:
(a) Comply with NEMA ICS 6 and manufacturer's recommendations for mounting, ventilation, and grounding.
(b) Locate power supplies with sufficient clearance for circulation of cooling air.
(c) Do not place CPU or I/O racks directly above power supplies.
(d) Strategically arrange devices supplied with line power (transformers, power supplies, surge suppressors, etc.) to keep power wire runs within the enclosure as short as possible.
(e) Place circulating fans or cooling equipment, if required, close to major heat generating devices.
(f) Group input/output modules by type.
(g) Where multiple subsystems of equipment are controlled by the PLC, distribute the assignment/arrangement of components (such as I/O modules, power supplies, etc.) so that the failure of a single component does not affect equipment on all subsystems. Unless otherwise indicated or required for safety reasons, group I/O points for each subsystem on a single I/O module.
3.3 INSTALLATION OF EQUIPMENT
Install equipment as specified, as shown and as required in the manufacturer's instructions for a complete and fully operational control system.
3.3.1 Component Installation
a. Minimize welding to panel fronts and avoid distortion of panel metal.
b. Reinforce around areas of the enclosure weakened by openings or mounting of heavy equipment/components.
c. Accurately and cleanly cut or nibble cut-outs, and finish free of sharp edges or burrs. Make cutouts plumb, level, and on-line vertically or horizontally within 1/32 of an inch where components are in rows or columns.
d. Provide minimum 1 5/8 inches spacing between horizontal rows of externally mounted components; 1 1/2 inches minimum between vertical columns of components.
e. The distance from the bottom row of components to the floor must be not less than 36 inches, unless specifically shown as less. In general, all indicating lights, pushbuttons, and similar control devices, must be mounted in accordance with the sequence of operation from left to right and top to bottom.
f. Provide minimum 1/4 inch spacing between components mounted on the panel sub-plate, provide minimum spacing between the component and the wire duct of 1 1/2 inches above and one inch below. Provide additional space if required to access terminals, adjusting screws, and similar items.
g. Components mounted in the interior must be fastened to an interior subpanel using machine screws.
h. Interior component mounting and wiring must be grouped as much as possible by function and then by component type. Interiors must be so arranged that control relays, terminal blocks, fuses, etc., can be replaced or added without disturbing adjacent components.
i. Provide raceways for panel wiring.
(1) Size raceways per the requirements of the NEC.
(2) Provide panel wireways between each row of components, and adjacent to each terminal strip.
3.3.2 Panel Nameplates and Identification
Enclosure nameplates must be fastened with approved metal fasteners except for nameplates at NEMA 4 or NEMA 4X enclosures must be adhesive type without penetrating the enclosure.
3.3.3 Flow Measuring Device
a. The Contractor must install and connect ultrasonic flow meter systems for the following cooling water systems:
(1) generator thrust bearing water discharge.
(2) Air coolers water discharge as specified.
b. The Contractor must mount the flow meters so that the displays are directly visible. The Contractor must be responsible for verifying existing cooling water systems. The Contractor must be responsible for providing all wiring, conduit, hardware, and piping modifications for connecting flow meters and signals. Approximate locations for the new flow meters are shown in the Contract Drawings, however the Contractor must determine the exact location in the system and the locations must be approved by the COR. Fluid flow instruments must be installed in accordance with manufacturer's recommendations. The minimum straight unobstructed piping for the flow meter installation must be 10.0 pipe diameters upstream and 5.0 pipe diameters downstream. Installation must meet with manufacturers requirements with respect to all aspects of execution; including spacing and configuration requirements, methods of insertion, applicability of sensor to fluid type in the application, requirements for the exclusion of entrained air from the sensor, whether or not the pipe must be full of fluid, minimum distances from flow disruptions such as elbows, tees, etc.
3.3.3.1 Ultrasonic Flow meter
Meter must be installed using manufacturer's published procedures for installation. Installers must be trained for such installations in the pipes encountered. Provide certificates demonstrating installer's qualifications.
3.3.4 Pressure Instruments
Pressure sensors must be verified by calibration. All pressure taps must incorporate appropriate snubbers. Pressure sensors must have valves for isolation, venting, and taps for calibration. Pressure sensors installed on liquid or steam lines must have drains. Differential pressure sensors must have nulling valves.
3.3.5 Temperature Instrument Installation
3.3.5.1 RTD
When the RTD is installed in pipe or is susceptible to corrosion or vibration, the RTD must be installed in a thermowell. Thermowells must be filled with conductive heat transfer fluid prior to installation of the RTD in the thermowell. RTDs used for space temperature sensing must include a housing suitable for wall mounting. RTDs used for outside air sensing must have an instrument shelter or sun shield as shown to minimize solar effects, and must be mounted to minimize building effects. RTD assemblies must be readily accessible and installed to allow easy replacement.
3.3.5.2 Thermometers and Temperature Sensing Elements
Thermometers and temperature sensing elements installed in liquid systems must be installed in thermowells.
3.3.5.3 Thermocouples
Each thermocouple must be installed in a protective tube or in a thermowell. Thermocouples must be insulated from ambient temperature effects.