J044--Boiler Repair
Closed Solicitation Posted
- Solicitation number
- 36C24624Q0907
- Agency
- Veterans Integrated Service Network 6 Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 332410 Power Boiler and Heat Exchanger Manufacturing
- PSC
- J044 Maint/Repair/Rebuild Of Equipment- Furnace, Steam Plant, And Drying Equipment; Nuclear Reactors
- Points of contact
-
- Serina H Black serina.black1@va.gov (757) 315-3965
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Veterans Affairs (VA), Veterans Health Administration, Veterans Integrated Service Network 6 is seeking quotes for boiler repair services at the Salisbury, North Carolina VA Medical Center. The contractor must have experience in fire protection engineering and healthcare facilities, and will be evaluated on their technical approach, past performance, and price. Quotes are due by 11:00 AM EST on July 3, 2024, and technical questions must be submitted by June 7, 2024. The government will select the quote that represents the best value.
This solicitation has no set-aside designation. The contract performance period is from July 1, 2024 to December 31, 2024. The North American Industry Classification System (NAICS) code is 332410 - Power Boiler and Heat Exchanger Manufacturing, and the Product Service Code is J044 - Maintenance/Repair/Rebuild of Equipment- Furnace, Steam Plant, and Drying Equipment. The government has not released the Independent Government Cost Estimate for this requirement.
Notice text
5 versions
Update #5 · Latest ·
Q&A | Boiler Repair
Q: The new door in the SOW is wider than existing, is this intentional meaning that we need to demolition wider opening?
A: The door is the same size as what is on the boiler now (Reference the SOW equipment listing).
Q: What type of material should we use for the rope gasket?
A: A High Temp Fire Rated rope gaskets made for this application.
Q: The existing work area is covered in thick black matte paint. Is this lead-free paint?
A: This is lead-free paint.
Q: What type of material is this and do we need to match it on our repairs?
A: This is a high temperature paint, please match as closely as possible.
Q: Can a certified engineer with 10 years experience be substituted for the 10-year fire protection engineer
A: CERTIFICATIONS: Contractor must provide a certified Engineer that must be certified through a formalized training program, with a verified Certificate to perform preventative and remedial maintenance on the Boiler. Contractor must provide an Engineer who must be OSHA-10 certified and comply with the Federal Guidelines.
TRAINING: A minimum of 10 hours of training is required
Update #4 ·
Solicitation 36C24624Q0907 extended until Wednesday, July 3, 2024 at 15:00 PM EST.
Update #3 ·
Site visit rescheduled for Friday, 21 June 2024 at 12:00 PM EST.
Salisbury VAMC, Boiler plant building 18
1601 Brenner Avenue
Salisbury, NC 28144
POC: Gary Swygert
Update #2 ·
Q&A | Boiler Repair
Q: Would it be possible to provide any pictures of the boiler, as well as it s Make, Model and National Board Number? Also do you know if there is any asbestos.
A: See attached pictures.
Make: C-E Vertical Unit Boiler
Model: VU-10
National board #: 2210
No asbestos.
Q: Are we able to conduct a site visit?
A: Site visit will be conducted Wednesday, 12 June 2024 at 12:00 PM EST.
Salisbury VAMC, Boiler plant building 18
1601 Brenner Avenue
Salisbury, NC 28144
POC: Gary Swygert
Q: We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services.
A: Brand new contract
Q: If not brand new, could you please provide the current / previous contract number?
A: N/A
Update #1 ·
?.## INSTRUCTIONS TO QUOTERS
SITE VISIT
Quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost and/or the contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. The site visits will be conducted on a mutually agreeable date as requested.
QUOTE SUBMISSION
Quoters shall submit their quote via email to Serina Black at Serina.Black1@va.gov by 11:00 AM, EST, June 14th, 2024. Quotes shall be assembled by the following Sections; each section shall be easily identified.
Section A - Quote Form (Standard Form 1449)
Signed and dated, include the North American Industry Classification System (NAICS) code and small business size standard in Block 10. Data Universal Numbering System (DUNS) Number shall be entered in the block with the Quoters name and address.
Section B Pricing
Pricing shall be submitted as requested in the Schedule of Services. Total price will be evaluated by the Government. Proposed price should reflect a clear understanding of the requirements and is consistent with the various elements of the quote.
Section C Quoters Representations and Certifications
A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the quoter shall complete electronically). A quoter shall complete only paragraph (b) of this provision if the quoter has completed the annual representations and certifications electronically at www.sam.gov/portal/public/SAM/.
All Quoters shall be registered and current in the System for Award Management (SAM) database at time of award.
Section D Technical/Management Approach
Quoters shall submit a quote that addresses all aspects of the Statement of Work (SOW).
Quoter must have experience, capability, and willingness to commit the resources necessary to plan, organize, and execute tasks in an expeditious and efficient manner.
The project manager and lead site survey personnel shall have at least 10 years of fire protection engineering work experience with demonstrated experience with health care occupancies. A fire protection engineer shall conduct the actual on-site surveys and supervise any other onsite survey personnel.
Proposed personnel shall demonstrate that they have previously acted as the lead role in fire protection and engineering design and life safety assessment projects involving all aspects of fire protection and life safety, including code compliant designs. Personnel shall also demonstrate a thorough working knowledge and formal training in fire protection codes and standards, especially the latest edition of NFPA 101 Life Safety Code and NFPA 99 Health Care Facilities Code.
The quoter shall identify any subcontractors proposed under this solicitation. All technical elements applicable to the utilization of subcontractors must be addressed in the technical quote and detail provided.
The technical quote should be as detailed as necessary to fully explain the proposed methods and rationale; it should reflect a clear understanding of the nature of the work being undertaken. The technical quote shall include information on how the project is to be organized, staffed, and managed.
The Technical Volume shall not exceed twenty-five (25) pages in length (minimum 12-point font and no less than ½ inch margins). Page limitation includes any drawings, charts, images, etc., and excludes section dividers, table of contents, glossary of terms, cross-referencing indices, and resumes. If more than 25 pages (not counting excluded pages) are submitted, only the first 25 pages will be considered.
Section E Past Performance
Identify all federal, state, and local government contracts as well as any private/commercial contracts of similar scope, size, complexity that are ongoing or have been completed within the last three years. List the following information for each contract:
Company Name and Address
Description of Services Performed
Name, Telephone Number and Email Address of Responsible individuals who have first-hand knowledge of performance relative to similar type of services
Dates of Contract Performance
Contract Type (e.g. fixed-price, cost reimbursable) and total contract value
Failure to submit a complete proposal may result in an unacceptable determination.
3.0 AWARD BASIS
The Government will select the quote that represents the best benefit to the Government at a price that can be determined reasonable. The Government will evaluate technical capabilities, past performance, and price.
Following receipt of quotes, the Government will perform an evaluation using a comparative analysis of the services quoted in accordance with FAR 13.106-2(b)(3). The Government will compare quotes to one another to select the service that best benefits the Government by fulfilling the requirement. The evaluation of Government requirements outlined in this request for quote will determine suitability. Contractors may submit more than one quote; however, contractors are strongly encouraged to submit their best technical solutions and prices in response to this request for quote. Once the Government determines there is/are a contractor(s) that can provide a service that meet(s) the requirements of this request for quote, the Government reserves the right to communicate with only those contractors quoting the best-suited service to address any remaining issues.
Factor 1: Technical/Management Approach
The evaluation process will consider whether the quote demonstrates a clear understanding of the technical features involved in meeting the requirements of the solicitation.
Factor 2: Past Performance
Past performance information will be utilized to determine the quality of the contractor s past performance as it relates to the probability of success of the required effort. The Government will evaluate customer satisfaction, responsiveness to customer needs, and past demonstration of meeting delivery schedules and the delivery of quality services. Emphasis will be on recent, relevant past performance in the previous 3 years. Recent is defined as work performed within the last three years. Relevant is defined as work similar in size and scope of the work described in the Performance Work Statement (PWS).
Past performance information is one indicator of a quoter s ability to perform the contract successfully. Current and relevant information, source of information, context of data, and general trends in Contractor s performance shall be considered as it pertains to the performance of work described in this solicitation. Quoters may provide information on problems encountered on identified contracts and the quoter s corrective action. The Government shall consider this information as well as information obtained from any other sources when evaluating the quoter s past performance.
Since the Government may not necessarily interview all of the sources provided by the quoters, it is incumbent upon the quoter to explain the relevance of the data provided. Quoters are reminded that the Government may elect to consider data obtained from other sources.
Quoters with no relevant past performance or whom information is not available, shall not be evaluated favorably or unfavorably on past performance, but may be considered less favorably than a quoter with favorable performance history.
Factor 3: Price
Prices shall be submitted in accordance with the Price Schedule contained in the Solicitation. Total price will be evaluated by the Government. In evaluating the quoter s proposed price for this project, the Government concern includes determining price reasonableness.
Reasonableness determinations will be made by determining if competition exists, by comparing proposed cost/price with established commercial prices, other contract vehicles, and/or by comparing proposed cost/price with the Independent Government Cost Estimate (IGCE). The IGCE is not releasable to the public.
4.0 TECHNICAL QUESTIONS
Quoters should submit all technical questions regarding this solicitation to the Contracting Officer in writing, via email, to Serina Black at Serina.Black1@va.gov on or before 11:00 AM, EST, June 7th, 2024.
Address Subject Line: Boiler Repair | Salisbury VAMC
Telephonic (verbal) questions Will Not be addressed.
All responses to questions, which may affect quotes, will be incorporated into a written amendment to the Request for Quote.
Attachments
| File | Type | Posted |
|---|---|---|
| 36C24624Q0907 0004.docx | DOCX document | |
| 36C24624Q0907 0003.docx | DOCX document | |
| 36C24624Q0907 0002.docx | DOCX document | |
| Boiler pictures.pdf | ||
| 36C24624Q0907 0001.docx | DOCX document | |
| 36C24624Q0907.docx | DOCX document | |
| Attachment A.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| J044--Boiler Repair | Solicitation | |
| J044--Boiler Repair | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity