J041-- (CONS)Topeka AHU replacement, building 9, 2nd floor (VA-21-00059538)
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 36C25921R0074
- Agency
-
Veterans Integrated Service Network 19
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- PSC
- J041 Maint/Repair/Rebuild Of Equipment- Refrigeration, Air Conditioning, And Air Circulating Equipment
- Place of performance
- Topeka, Kansas 66604, United States
Notice details come from SAM.gov. Updated .
Notice text
6 versions
Update #6 · Latest ·
Veteran Affairs Healthcare Systems (VA HCS) Project # 635-21-114, Replace Lawton Outpatient Clinic Air Cool Chiller at Lawton, OK I. GENERAL: THIS IS A PRESOLICITATION NOTICE THE FULL SOLICITATION WILL BE POSTED ON or AFTER 5/24/2021 Air Handler Unit (AHU) replacement NAICS CODE 238220 This solicitation will be a Service-Disabled Veteran Owned Small Business Set-Aside. Magnitude; $250,000.00 - $500,000.00 Description of Work Remove the current Air Handler Unit (AHU) in a confined space on the 2nd floor of building 9 and replace it with a new AHU that includes any duct work replacement needed to complete the installation. The Contractor shall provide all labor, material to install new VA approve AHU units and exhaust fans for building 9. The Contractor shall pump-down and recover the refrigerant from all units effected by this project. Disconnect, de-pipe, detach, and remove the existing unit equipment at an offsite disposal site or recycling center in compliance with the regulatory requirements. Provide and/or connect all required piping, electrical conduit and wiring, controls, ductwork, VAV boxes, condensate, insulations and necessary appurtenances. Remove, cut, alter, replace, patch and repair existing work as necessary to install new equipment/component. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials used in restoring work shall conform in type and quality to that of original existing construction, except as otherwise shown The Contractor is responsible for upgrading control for each unit to digital control system which includes but are not limited to upgrade actuators, VAV boxes, thermostats, wiring to such components, and integrate those to existing Johnson Control system. The Contractor shall remove existing insulation and reinsulate the ducts. The contractor shall thoroughly clean all ductwork. The cleaning shall include all supply and return ductwork supply as well flex ducts from the mains to the diffusers. All diffusers shall be cleaned with appropriate method. The Contractor shall provide and install concrete pad, vibration isolator, piping, condensate drain, floor drain for the new unit as required. The Contractor is responsible for testing and balancing of all installed equipment and provide a detailed digital report to VHA MS COR and Eastern Kansas VA representative. The Contractor shall provide 2D CAD (REVIT 2015 or later) as built drawing shall be provided to show all work, equipment, piping, penetrations, interior/exterior features, cables, panels, etc. that are to be installed in this project. Contractor shall provide an adequate work force to complete all work associated with this project (i.e. plan, design, installation, and removal of project debris, and final cleanup
Update #5 ·
Veteran Affairs Healthcare Systems (VA HCS)
Project # 635-21-114, Replace Lawton Outpatient Clinic Air Cool Chiller at Lawton, OK
I. GENERAL: THIS IS A PRESOLICITATION NOTICE THE FULL SOLICITATION WILL BE POSTED ON or AFTER 5/24/2021
Air Handler Unit (AHU) replacement
NAICS CODE 238220
This solicitation will be a Service-Disabled Veteran Owned Small Business Set-Aside.
Magnitude; $250,000.00 - $500,000.00
Description of Work
Remove the current Air Handler Unit (AHU) in a confined space on the 2nd floor of building 9 and replace it with a new AHU that includes any duct work replacement needed to complete the installation.
The Contractor shall provide all labor, material to install new VA approve AHU units and exhaust fans for building 9.
The Contractor shall pump-down and recover the refrigerant from all units effected by this project.
Disconnect, de-pipe, detach, and remove the existing unit equipment at an offsite disposal site or recycling center in compliance with the regulatory requirements.
Provide and/or connect all required piping, electrical conduit and wiring, controls, ductwork, VAV boxes, condensate, insulations and necessary appurtenances.
Remove, cut, alter, replace, patch and repair existing work as necessary to install new equipment/component. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials used in restoring work shall conform in type and quality to that of original existing construction, except as otherwise shown
The Contractor is responsible for upgrading control for each unit to digital control system which includes but are not limited to upgrade actuators, VAV boxes, thermostats, wiring to such components, and integrate those to existing Johnson Control system.
The Contractor shall remove existing insulation and reinsulate the ducts. The contractor shall thoroughly clean all ductwork. The cleaning shall include all supply and return ductwork supply as well flex ducts from the mains to the diffusers. All diffusers shall be cleaned with appropriate method.
The Contractor shall provide and install concrete pad, vibration isolator, piping, condensate drain, floor drain for the new unit as required.
The Contractor is responsible for testing and balancing of all installed equipment and provide a detailed digital report to VHA MS COR and Eastern Kansas VA representative.
The Contractor shall provide 2D CAD (REVIT 2015 or later) as built drawing shall be provided to show all work, equipment, piping, penetrations, interior/exterior features, cables, panels, etc. that are to be installed in this project.
Contractor shall provide an adequate work force to complete all work associated with this project (i.e. plan, design, installation, and removal of project debris, and final cleanup
Update #4 ·
Veteran Affairs Healthcare Systems (VA HCS) Project # 635-21-114, Replace Lawton Outpatient Clinic Air Cool Chiller at Lawton, OK I. GENERAL: THIS IS A SOLICITATION NOTICE for Air Handler Unit (AHU) replacement NAICS CODE 238220 This solicitation will be a Service-Disabled Veteran Owned Small Business Set-Aside. Magnitude; $250,000.00 - $500,000.00 Description of Work Remove the current Air Handler Unit (AHU) in a confined space on the 2nd floor of building 9 and replace it with a new AHU that includes any duct work replacement needed to complete the installation. The Contractor shall provide all labor, material to install new VA approve AHU units and exhaust fans for building 9. The Contractor shall pump-down and recover the refrigerant from all units effected by this project. Disconnect, de-pipe, detach, and remove the existing unit equipment at an offsite disposal site or recycling center in compliance with the regulatory requirements. Provide and/or connect all required piping, electrical conduit and wiring, controls, ductwork, VAV boxes, condensate, insulations and necessary appurtenances. Remove, cut, alter, replace, patch and repair existing work as necessary to install new equipment/component. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials used in restoring work shall conform in type and quality to that of original existing construction, except as otherwise shown The Contractor is responsible for upgrading control for each unit to digital control system which includes but are not limited to upgrade actuators, VAV boxes, thermostats, wiring to such components, and integrate those to existing Johnson Control system. The Contractor shall remove existing insulation and reinsulate the ducts. The contractor shall thoroughly clean all ductwork. The cleaning shall include all supply and return ductwork supply as well flex ducts from the mains to the diffusers. All diffusers shall be cleaned with appropriate method. The Contractor shall provide and install concrete pad, vibration isolator, piping, condensate drain, floor drain for the new unit as required. The Contractor is responsible for testing and balancing of all installed equipment and provide a detailed digital report to VHA MS COR and Eastern Kansas VA representative. The Contractor shall provide 2D CAD (REVIT 2015 or later) as built drawing shall be provided to show all work, equipment, piping, penetrations, interior/exterior features, cables, panels, etc. that are to be installed in this project. Contractor shall provide an adequate work force to complete all work associated with this project (i.e. plan, design, installation, and removal of project debris, and final cleanup
Update #3 ·
Veteran Affairs Healthcare Systems (VA HCS) Project # 635-21-114, Replace Lawton Outpatient Clinic Air Cool Chiller at Lawton, OK I. GENERAL: THE FULL SOLICITATION WILL BE POSTED ON or AFTER 5/24/2021 Air Handler Unit (AHU) replacement NAICS CODE 238220 This solicitation will be a Service-Disabled Veteran Owned Small Business Set-Aside. Magnitude; $250,000.00 - $500,000.00 Description of Work Remove the current Air Handler Unit (AHU) in a confined space on the 2nd floor of building 9 and replace it with a new AHU that includes any duct work replacement needed to complete the installation. The Contractor shall provide all labor, material to install new VA approve AHU units and exhaust fans for building 9. The Contractor shall pump-down and recover the refrigerant from all units effected by this project. Disconnect, de-pipe, detach, and remove the existing unit equipment at an offsite disposal site or recycling center in compliance with the regulatory requirements. Provide and/or connect all required piping, electrical conduit and wiring, controls, ductwork, VAV boxes, condensate, insulations and necessary appurtenances. Remove, cut, alter, replace, patch and repair existing work as necessary to install new equipment/component. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials used in restoring work shall conform in type and quality to that of original existing construction, except as otherwise shown The Contractor is responsible for upgrading control for each unit to digital control system which includes but are not limited to upgrade actuators, VAV boxes, thermostats, wiring to such components, and integrate those to existing Johnson Control system. The Contractor shall remove existing insulation and reinsulate the ducts. The contractor shall thoroughly clean all ductwork. The cleaning shall include all supply and return ductwork supply as well flex ducts from the mains to the diffusers. All diffusers shall be cleaned with appropriate method. The Contractor shall provide and install concrete pad, vibration isolator, piping, condensate drain, floor drain for the new unit as required. The Contractor is responsible for testing and balancing of all installed equipment and provide a detailed digital report to VHA MS COR and Eastern Kansas VA representative. The Contractor shall provide 2D CAD (REVIT 2015 or later) as built drawing shall be provided to show all work, equipment, piping, penetrations, interior/exterior features, cables, panels, etc. that are to be installed in this project. Contractor shall provide an adequate work force to complete all work associated with this project (i.e. plan, design, installation, and removal of project debris, and final cleanup
Update #2 ·
Veteran Affairs Healthcare Systems (VA HCS) MEMBER SERVICES CALL CENTER (VHA-MSCC) located at 3401 SW 21st St., Bldg. 9, Topeka, KS, 66604.
GENERAL: THIS IS AN UPDATED SOLICITATION NOTICE TAir Handler Unit (AHU) replacement NAICS CODE 238220 This solicitation will be a Service-Disabled Veteran Owned Small Business Set-Aside. Magnitude; $250,000.00 - $500,000.00 Description of Work Remove the current Air Handler Unit (AHU) in a confined space on the 2nd floor of building 9 and replace it with a new AHU that includes any duct work replacement needed to complete the installation. The Contractor shall provide all labor, material to install new VA approve AHU units and exhaust fans for building 9. The Contractor shall pump-down and recover the refrigerant from all units effected by this project. Disconnect, de-pipe, detach, and remove the existing unit equipment at an offsite disposal site or recycling center in compliance with the regulatory requirements. Provide and/or connect all required piping, electrical conduit and wiring, controls, ductwork, VAV boxes, condensate, insulations and necessary appurtenances. Remove, cut, alter, replace, patch and repair existing work as necessary to install new equipment/component. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials used in restoring work shall conform in type and quality to that of original existing construction, except as otherwise shown The Contractor is responsible for upgrading control for each unit to digital control system which includes but are not limited to upgrade actuators, VAV boxes, thermostats, wiring to such components, and integrate those to existing Johnson Control system. The Contractor shall remove existing insulation and reinsulate the ducts. The contractor shall thoroughly clean all ductwork. The cleaning shall include all supply and return ductwork supply as well flex ducts from the mains to the diffusers. All diffusers shall be cleaned with appropriate method. The Contractor shall provide and install concrete pad, vibration isolator, piping, condensate drain, floor drain for the new unit as required. The Contractor is responsible for testing and balancing of all installed equipment and provide a detailed digital report to VHA MS COR and Eastern Kansas VA representative. The Contractor shall provide 2D CAD (REVIT 2015 or later) as built drawing shall be provided to show all work, equipment, piping, penetrations, interior/exterior features, cables, panels, etc. that are to be installed in this project. Contractor shall provide an adequate work force to complete all work associated with this project (i.e. plan, design, installation, and removal of project debris, and final cleanup
Update #1 ·
The Veterans Health Administration – Member Services Call Center (VHA-MSCC) located at 3401 SW 21st street, Building 9, Topeka KS 66604 is seeking to obtain a qualified Contractor who can demonstrate the required capability to remove the current Air Handler Unit (AHU) in a confined space on the 2nd floor of building 9 and replace it with a new AHU that includes any duct work replacement needed to complete the installation. GENERAL: THIS IS A PRESOLICITATION NOTICE THE FULL SOLICITATION WILL BE POSTED ON or AFTER 5/24/2021 Air Handler Unit (AHU) replacement NAICS CODE 238220 This solicitation will be a Service-Disabled Veteran Owned Small Business Set-Aside. Magnitude; $250,000.00 - $500,000.00 Description of Work Remove the current Air Handler Unit (AHU) in a confined space on the 2nd floor of building 9 and replace it with a new AHU that includes any duct work replacement needed to complete the installation. The Contractor shall provide all labor, material to install new VA approve AHU units and exhaust fans for building 9. The Contractor shall pump-down and recover the refrigerant from all units effected by this project. Disconnect, de-pipe, detach, and remove the existing unit equipment at an offsite disposal site or recycling center in compliance with the regulatory requirements. Provide and/or connect all required piping, electrical conduit and wiring, controls, ductwork, VAV boxes, condensate, insulations and necessary appurtenances. Remove, cut, alter, replace, patch and repair existing work as necessary to install new equipment/component. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials used in restoring work shall conform in type and quality to that of original existing construction, except as otherwise shown The Contractor is responsible for upgrading control for each unit to digital control system which includes but are not limited to upgrade actuators, VAV boxes, thermostats, wiring to such components, and integrate those to existing Johnson Control system. The Contractor shall remove existing insulation and reinsulate the ducts. The contractor shall thoroughly clean all ductwork. The cleaning shall include all supply and return ductwork supply as well flex ducts from the mains to the diffusers. All diffusers shall be cleaned with appropriate method. The Contractor shall provide and install concrete pad, vibration isolator, piping, condensate drain, floor drain for the new unit as required. The Contractor is responsible for testing and balancing of all installed equipment and provide a detailed digital report to VHA MS COR and Eastern Kansas VA representative. The Contractor shall provide 2D CAD (REVIT 2015 or later) as built drawing shall be provided to show all work, equipment, piping, penetrations, interior/exterior features, cables, panels, etc. that are to be installed in this project. Contractor shall provide an adequate work force to complete all work associated with this project (i.e. plan, design, installation, and removal of project debris, and final cleanup
Files
| File | Type | Posted |
|---|---|---|
| 36C25921R0074 0008.docx | DOCX document | |
| 3rd questions and Answers_Final.docx | DOCX document | |
| S06- 2nd Questions_Final.docx | DOCX document | |
| 36C25921R0074 0007.docx | DOCX document | |
| S04- Topeka AHU_2nd site visit signin_20JUL2021.pdf | ||
| Site Visit Meeting Doc_2nd.docx | DOCX document | |
| 36C25921R0074 0006.docx | DOCX document | |
| 36C25921R0074 0005.docx | DOCX document | |
| S05- Questions and Answers.docx | DOCX document | |
| Second Floor Piping.pdf | ||
| S05- Questions and Answers.docx | DOCX document | |
| S04- Site Visit Attendance.pdf | ||
| 36C25921R0074 0004.docx | DOCX document | |
| Second Floor HVAC.pdf | ||
| 065-MP103_.pdf | ||
| Pictures of space.pdf | ||
| 062-MH103-R.pdf | ||
| 36C25921R0074 0003.docx | DOCX document | |
| 36C25921R0074 0001.docx | DOCX document | |
| 36C25921R0074 0002.docx | DOCX document | |
| 36C25921R0074 Full Solicitation.docx | DOCX document | |
| 36C25921R0074_1.docx | DOCX document | |
| SELF-PERFORMED CALCULATIONS.docx | DOCX document | |
| S02 Past Performance Questionnaire.docx | DOCX document |
Show all 24
Notice history
| Notice | Type | Posted |
|---|---|---|
| J041-- (CONS)Topeka AHU replacement, building 9, 2nd floor (VA-21-00059538) | 702C10044 | Award Notice | |
| This notice | Solicitation | |
| J041-- (CONS)Topeka AHU replacement, building 9, 2nd floor (VA-21-00059538) | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity