J041--Building 22 Chiller Replacement 655-22-201
Closed Solicitation Posted
- Solicitation number
- 36C25022B0056
- Agency
- Veterans Integrated Service Network 10 Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- PSC
- J041 Maint/Repair/Rebuild Of Equipment- Refrigeration, Air Conditioning, And Air Circulating Equipment
- Place of performance
- Saginaw, Michigan 48602, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation is for the replacement of two chiller units and chilled water circulating pumps serving Building 22 at the Aleda E. Lutz VA Medical Center in Saginaw, Michigan. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 seeks to replace the existing roof-mounted chillers and second floor mechanical room pumps to improve the facility's chilled water system. Contractors must have experience performing similar chilled water system replacements. Proposals are due by July 26, 2022 and the contract is set aside for Service-Disabled Veteran-Owned Small Businesses.
The opportunity is set aside for SDVOSBs under NAICS 238220 - Plumbing, Heating, and Air-Conditioning Contractors with a place of performance in Saginaw, Michigan. The solicitation number is 36C25022B0056 and it anticipates a contract value between $250,000-$500,000 to replace the two chillers and pumps within 180 days. Proposals were due by July 26, 2022 and the Department of Veterans Affairs VISN 10 will award a firm fixed price contract to the responsible offeror with the lowest price.
Notice text
This project is at the Aleda E. Lutz VA Medical Center located at 1500 Weiss Street in Saginaw,
Michigan. The intent of the project is to replace the two existing chiller units and the chilled water
system circulating pumps that serve Building 22. The existing chillers are mounted atop a steel chiller
platform structure on the roof above the 1st floor dining room and outside of the 2nd floor mechanical
room. The existing chilled water piping runs from the chiller units back into the 2nd floor mechanical
room through the south facing exterior wall. The existing chilled water system circulating pumps are
located in the 2nd floor mechanical room. The new chiller units will be placed atop the existing steel
chiller platform structure and the new chilled water system circulating pumps will go on the existing
housekeeping pads in the 2nd floor mechanical room.
Attachments
| File | Type | Posted |
|---|---|---|
| Notice of Award 36C25022C0274.pdf | ||
| 36C25022B0056 Amendment 0001.pdf | ||
| Wage Determination MI20220100.pdf | ||
| Project 655-22-201 Drawings.pdf | ||
| Project 655-22-201 Specifications.pdf | ||
| 36C25022B0056.pdf | ||
| Project 655-22-201 Scope of Work.pdf | ||
| RFI Form Solicitation.doc | DOC document | |
| Contractor EMR Certification Form .docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| J041--Building 22 Chiller Replacement 655-22-201 | Solicitation | |
| J041--Building 22 Chiller Replacement 655-22-201 | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity