About this opportunity

The Department of the Army Materiel Command Contracting Command at Picatinny Arsenal seeks installation of government-owned air compressor and Hotsy steam cleaner equipment at Joint Base McGuire-Dix-Lakehurst (JB MDL), Building 8411, with proposals due July 20, 2026. The procurement is a 100% Small Business set-aside, firm-fixed-price commercial construction contract foreclosing competition outside that pool.

Place of performance is Fort Dix, New Jersey. The contractor must position and secure one Hotsy Steam Cleaner (Model 5762SS 208, SN 11096540 100120) in the designated wash bay with natural gas and electrical utility connections, install one Air Compressor on the mezzanine with vibration isolation pads and anchoring, install approximately 190 feet of feed wire and conduit from the existing electrical panel to the steam cleaner, and install electrical conduit and connections for the air compressor per National Electrical Code standards. The contractor must also install natural gas piping, replace the existing circuit breaker with a properly sized unit, install a local disconnect switch for the air compressor, install surge protective devices, perform code compliance verification, conduct gas leak testing and operational testing, submit as-built drawings and wiring diagrams, and furnish all labor, materials, equipment, and transportation. Performance period is 60 calendar days. Davis-Bacon Act prevailing wages apply per Burlington County Building WD NJ20260027 (issued May 18, 2026). Pre-award bid bonds and standard performance and payment bonds are waived. NAICS code is 238290, Other Building Equipment Contractors. Offerors must acknowledge receipt of Amendment 0003 (extending deadline to July 20) and all prior amendments. Questions deadline is June 27 at 1:00 PM local time submitted to Nelia Shyshak, Contract Specialist, nelia.shyshak.civ@army.mil. Submissions are 100% electronic via email.

Notice text

4 versions

Update #4 · Latest ·

Amendment 0003:

The purpose of this Amendment is to extend the response date to 20 July 2026 and change the set-aside to 100% Small Business.

Amendment 0002:

The purpose of this Amendment is to extend the response date to 13 July 2026.

Amendment 0001:

The purpose of this Amendment is to extend the response date from 30 June 2026 to 8 July 2026 and answer vendors' questions. Please see attachment Solicitation Amendment W15QKN26QA1090001 SF 30 for full text.

Installation of Air Compressor and Steam Cleaner

LRC, Bldg 8411, Joint Base McGuire-Dix-Lakehurst (JB MDL), NJ

Solicitation No. W15QKN-26-Q-A109

Request for Quote (RFQ) 

Contract Type Firm-Fixed-Price (FFP)

Single-award commercial construction/installation

Set-Aside Status - 100% Total HUBZone Small Business

NAICS: 238290 (Other Building Equipment) | Size Standard: $25.5M

Bonding / Security

Alternative Payment Protections (FAR 28.102-1(b))

Pre-award bid bonds and standard 100% P&P bonds are waived.

Period of Performance 60 Calendar Days

Mandatory Labor Rates Davis-Bacon Act Prevailing Wages, Burlington County Building WD NJ20260027 (issued May 18, 2026)

Questions Deadline June 27, 2026, at 13:00 Local Time

Submitted in writing via email to CS and Technical POC

Proposal Deadline June 30, 2026

100% Electronic Submission via Email to CS

Primary Contact (CS)

Nelia Shyshak, Contract Specialist

nelia.shyshak.civ@army.mil

Summary of What the Contractor Shall Provide

To be deemed technically acceptable and responsive, the successful contractor must deliver the physical installations and technical deliverables detailed below:

  • Physical Installations & Specialty Trade Services (GFP Integration):
    • Hotsy Steam Cleaner (GFP): Position and secure one (1) Government-owned Hotsy Steam Cleaner (Model 5762SS 208, SN 11096540 100120) in the designated wash bay of Bldg 8411, JB MDL. Make all final natural gas (1/2 psig, 5.0" WC manifold pressure) and electrical utility connections.
    • Air Compressor (GFP): Position and secure one (1) Government-owned Air Compressor in the designated location within Bldg 8411, JB MDL, including installing vibration pads, mounting hardware, and anchoring.
    • Electrical Installations: Install approximately 190 feet of feed wire and conduit from the existing electrical panel to the steam cleaner. Replace the existing circuit breaker with a properly sized breaker. Terminate and secure all obsolete wiring/conduit. Install a local disconnect switch for the air compressor. Integrate a fusible link, surge protective device (SPD), or equivalent into the electrical panel or disconnect.
    • Gas Piping Installations: Install approximately 30 feet of natural gas piping from the ceiling to the steam cleaner equipment, including all fittings, supports, shutoff valves, and unions.
    • Testing and Commissioning: Perform comprehensive leak testing of gas piping, verify electrical voltage and amperage ratings, test the SPD, verify burner operation and pump performance, and execute full startup, calibration, and operational testing.
  • Mandatory Technical Submittals & Deliverables (SOW Section 10.0):
    • Onsite Survey Report (submitted and approved by Government prior to starting any physical work)
    • As-Built Drawings and Wiring Diagrams
    • Surge Protection Documentation
    • Test and Commissioning Report
    • Gas Leak Test Results
    • Electrical Verification Documentation / Reports
    • Manufacturer-compliant Warranty Documentation
  • Completed Cost Breakdown Form (Attachment 0003): Itemized breakdown specifying direct labor rates (compliant with WD NJ20260027), direct materials, direct equipment, and a separate breakout of Overhead/G&A and Profit at the bottom of the worksheet.

Mandatory Site Visit & Access Security Gates

Prospective offerors are highly encouraged to inspect the site prior to proposal submission to satisfy themselves regarding all conditions that may affect contract performance. Failure to inspect the site shall not constitute grounds for a claim after award.

  • Site Visit Schedule:
    • Primary Site Visit: Monday, June 22, 2026, from 7:30 AM to 4:00 PM (local time)
    • Secondary Site Visit: Thursday, June 25, 2026, from 7:30 AM to 4:00 PM (local time)
    • Site Visit Address: Building 8411, Range Road, Joint Base McGuire-Dix-Lakehurst (JB MDL), NJ 08640.
  • Access Pass Security Gate (Mandatory 24-Hour Advance Notice):
    To obtain installation access instructions, prospective attendees must contact the Site Visit POC at least twenty-four (24) hours prior to the scheduled site visit date:
    • Ronnie Walker, Site Visit POC | Email: ronnie.walker1.civ@army.mil | Phone: (609) 562-4964

Post-Award Contract Execution & Security Sequence

To protect subcontractors, laborers, and the Government's interest, contract performance shall follow this strict chronological sequence. Physical mobilization, tool delivery, or actual onsite work is strictly prohibited prior to receiving the written Notice to Proceed (NTP):

  1. Contract Award: The Government executes and issues the Firm-Fixed-Price contract (SF 1442).
  2. Payment Security Submission (Within 10 Days of Award): The Contractor must submit one (1) of the following three (3) alternative payment protections in the amount of 100% of the contract award price to the Contracting Officer for review and approval:
    • Option A: A Payment Bond (SF 25A)
    • Option B: An Irrevocable Letter of Credit (ILC) in accordance with FAR 52.228-14
    • Option C: Certificates of Deposit from a federally insured financial institution, in an acceptable form executable solely by the CO.
  3. Notice to Proceed (NTP) Issuance: Upon written approval of the contractor's payment protection, the CO will issue the formal NTP, which officially starts the 60-calendar-day Period of Performance (PoP) clock.
  4. Pre-Construction Conference: Within five (5) calendar days of the NTP issuance, a conference will be conducted at Building 8411 to coordinate base access, safety, and scheduled utility shutdowns.
  5. GFP Custody Transfer (DD Form 1149): Following the approved pre-installation survey (PWS 5.1), a joint physical inspection of the Hotsy Steam Cleaner and Air Compressor will be conducted. Physical custody and the risk of loss will transfer to the Contractor immediately upon the signing of the DD Form 1149.
  6. Physical Onsite Work: The contractor shall commence physical onsite installation immediately following the GFP transfer.
Update #3 ·

Amendment 0002:

The purpose of this Amendment is to extend the response date to 13 July 2026.

Amendment 0001:

The purpose of this Amendment is to extend the response date from 30 June 2026 to 8 July 2026 and answer vendors' questions. Please see attachment Solicitation Amendment W15QKN26QA1090001 SF 30 for full text.

Installation of Air Compressor and Steam Cleaner

LRC, Bldg 8411, Joint Base McGuire-Dix-Lakehurst (JB MDL), NJ

Solicitation No. W15QKN-26-Q-A109

Request for Quote (RFQ) 

Contract Type Firm-Fixed-Price (FFP)

Single-award commercial construction/installation

Set-Aside Status - 100% Total HUBZone Small Business

NAICS: 238290 (Other Building Equipment) | Size Standard: $25.5M

Bonding / Security

Alternative Payment Protections (FAR 28.102-1(b))

Pre-award bid bonds and standard 100% P&P bonds are waived.

Period of Performance 60 Calendar Days

Mandatory Labor Rates Davis-Bacon Act Prevailing Wages, Burlington County Building WD NJ20260027 (issued May 18, 2026)

Questions Deadline June 27, 2026, at 13:00 Local Time

Submitted in writing via email to CS and Technical POC

Proposal Deadline June 30, 2026

100% Electronic Submission via Email to CS

Primary Contact (CS)

Nelia Shyshak, Contract Specialist

nelia.shyshak.civ@army.mil

Summary of What the Contractor Shall Provide

To be deemed technically acceptable and responsive, the successful contractor must deliver the physical installations and technical deliverables detailed below:

  • Physical Installations & Specialty Trade Services (GFP Integration):
    • Hotsy Steam Cleaner (GFP): Position and secure one (1) Government-owned Hotsy Steam Cleaner (Model 5762SS 208, SN 11096540 100120) in the designated wash bay of Bldg 8411, JB MDL. Make all final natural gas (1/2 psig, 5.0" WC manifold pressure) and electrical utility connections.
    • Air Compressor (GFP): Position and secure one (1) Government-owned Air Compressor in the designated location within Bldg 8411, JB MDL, including installing vibration pads, mounting hardware, and anchoring.
    • Electrical Installations: Install approximately 190 feet of feed wire and conduit from the existing electrical panel to the steam cleaner. Replace the existing circuit breaker with a properly sized breaker. Terminate and secure all obsolete wiring/conduit. Install a local disconnect switch for the air compressor. Integrate a fusible link, surge protective device (SPD), or equivalent into the electrical panel or disconnect.
    • Gas Piping Installations: Install approximately 30 feet of natural gas piping from the ceiling to the steam cleaner equipment, including all fittings, supports, shutoff valves, and unions.
    • Testing and Commissioning: Perform comprehensive leak testing of gas piping, verify electrical voltage and amperage ratings, test the SPD, verify burner operation and pump performance, and execute full startup, calibration, and operational testing.
  • Mandatory Technical Submittals & Deliverables (SOW Section 10.0):
    • Onsite Survey Report (submitted and approved by Government prior to starting any physical work)
    • As-Built Drawings and Wiring Diagrams
    • Surge Protection Documentation
    • Test and Commissioning Report
    • Gas Leak Test Results
    • Electrical Verification Documentation / Reports
    • Manufacturer-compliant Warranty Documentation
  • Completed Cost Breakdown Form (Attachment 0003): Itemized breakdown specifying direct labor rates (compliant with WD NJ20260027), direct materials, direct equipment, and a separate breakout of Overhead/G&A and Profit at the bottom of the worksheet.

Mandatory Site Visit & Access Security Gates

Prospective offerors are highly encouraged to inspect the site prior to proposal submission to satisfy themselves regarding all conditions that may affect contract performance. Failure to inspect the site shall not constitute grounds for a claim after award.

  • Site Visit Schedule:
    • Primary Site Visit: Monday, June 22, 2026, from 7:30 AM to 4:00 PM (local time)
    • Secondary Site Visit: Thursday, June 25, 2026, from 7:30 AM to 4:00 PM (local time)
    • Site Visit Address: Building 8411, Range Road, Joint Base McGuire-Dix-Lakehurst (JB MDL), NJ 08640.
  • Access Pass Security Gate (Mandatory 24-Hour Advance Notice):
    To obtain installation access instructions, prospective attendees must contact the Site Visit POC at least twenty-four (24) hours prior to the scheduled site visit date:
    • Ronnie Walker, Site Visit POC | Email: ronnie.walker1.civ@army.mil | Phone: (609) 562-4964

Post-Award Contract Execution & Security Sequence

To protect subcontractors, laborers, and the Government's interest, contract performance shall follow this strict chronological sequence. Physical mobilization, tool delivery, or actual onsite work is strictly prohibited prior to receiving the written Notice to Proceed (NTP):

  1. Contract Award: The Government executes and issues the Firm-Fixed-Price contract (SF 1442).
  2. Payment Security Submission (Within 10 Days of Award): The Contractor must submit one (1) of the following three (3) alternative payment protections in the amount of 100% of the contract award price to the Contracting Officer for review and approval:
    • Option A: A Payment Bond (SF 25A)
    • Option B: An Irrevocable Letter of Credit (ILC) in accordance with FAR 52.228-14
    • Option C: Certificates of Deposit from a federally insured financial institution, in an acceptable form executable solely by the CO.
  3. Notice to Proceed (NTP) Issuance: Upon written approval of the contractor's payment protection, the CO will issue the formal NTP, which officially starts the 60-calendar-day Period of Performance (PoP) clock.
  4. Pre-Construction Conference: Within five (5) calendar days of the NTP issuance, a conference will be conducted at Building 8411 to coordinate base access, safety, and scheduled utility shutdowns.
  5. GFP Custody Transfer (DD Form 1149): Following the approved pre-installation survey (PWS 5.1), a joint physical inspection of the Hotsy Steam Cleaner and Air Compressor will be conducted. Physical custody and the risk of loss will transfer to the Contractor immediately upon the signing of the DD Form 1149.
  6. Physical Onsite Work: The contractor shall commence physical onsite installation immediately following the GFP transfer.
Update #2 ·

Amendment 0001:

The purpose of this Amendment is to extend the response date from 30 June 2026 to 8 July 2026 and answer vendors' questions. Please see attachment Solicitation Amendment W15QKN26QA1090001 SF 30 for full text.

Installation of Air Compressor and Steam Cleaner

LRC, Bldg 8411, Joint Base McGuire-Dix-Lakehurst (JB MDL), NJ

Solicitation No. W15QKN-26-Q-A109

Request for Quote (RFQ) 

Contract Type Firm-Fixed-Price (FFP)

Single-award commercial construction/installation

Set-Aside Status - 100% Total HUBZone Small Business

NAICS: 238290 (Other Building Equipment) | Size Standard: $25.5M

Bonding / Security

Alternative Payment Protections (FAR 28.102-1(b))

Pre-award bid bonds and standard 100% P&P bonds are waived.

Period of Performance 60 Calendar Days

Mandatory Labor Rates Davis-Bacon Act Prevailing Wages, Burlington County Building WD NJ20260027 (issued May 18, 2026)

Questions Deadline June 27, 2026, at 13:00 Local Time

Submitted in writing via email to CS and Technical POC

Proposal Deadline June 30, 2026

100% Electronic Submission via Email to CS

Primary Contact (CS)

Nelia Shyshak, Contract Specialist

nelia.shyshak.civ@army.mil

Summary of What the Contractor Shall Provide

To be deemed technically acceptable and responsive, the successful contractor must deliver the physical installations and technical deliverables detailed below:

  • Physical Installations & Specialty Trade Services (GFP Integration):
    • Hotsy Steam Cleaner (GFP): Position and secure one (1) Government-owned Hotsy Steam Cleaner (Model 5762SS 208, SN 11096540 100120) in the designated wash bay of Bldg 8411, JB MDL. Make all final natural gas (1/2 psig, 5.0" WC manifold pressure) and electrical utility connections.
    • Air Compressor (GFP): Position and secure one (1) Government-owned Air Compressor in the designated location within Bldg 8411, JB MDL, including installing vibration pads, mounting hardware, and anchoring.
    • Electrical Installations: Install approximately 190 feet of feed wire and conduit from the existing electrical panel to the steam cleaner. Replace the existing circuit breaker with a properly sized breaker. Terminate and secure all obsolete wiring/conduit. Install a local disconnect switch for the air compressor. Integrate a fusible link, surge protective device (SPD), or equivalent into the electrical panel or disconnect.
    • Gas Piping Installations: Install approximately 30 feet of natural gas piping from the ceiling to the steam cleaner equipment, including all fittings, supports, shutoff valves, and unions.
    • Testing and Commissioning: Perform comprehensive leak testing of gas piping, verify electrical voltage and amperage ratings, test the SPD, verify burner operation and pump performance, and execute full startup, calibration, and operational testing.
  • Mandatory Technical Submittals & Deliverables (SOW Section 10.0):
    • Onsite Survey Report (submitted and approved by Government prior to starting any physical work)
    • As-Built Drawings and Wiring Diagrams
    • Surge Protection Documentation
    • Test and Commissioning Report
    • Gas Leak Test Results
    • Electrical Verification Documentation / Reports
    • Manufacturer-compliant Warranty Documentation
  • Completed Cost Breakdown Form (Attachment 0003): Itemized breakdown specifying direct labor rates (compliant with WD NJ20260027), direct materials, direct equipment, and a separate breakout of Overhead/G&A and Profit at the bottom of the worksheet.

Mandatory Site Visit & Access Security Gates

Prospective offerors are highly encouraged to inspect the site prior to proposal submission to satisfy themselves regarding all conditions that may affect contract performance. Failure to inspect the site shall not constitute grounds for a claim after award.

  • Site Visit Schedule:
    • Primary Site Visit: Monday, June 22, 2026, from 7:30 AM to 4:00 PM (local time)
    • Secondary Site Visit: Thursday, June 25, 2026, from 7:30 AM to 4:00 PM (local time)
    • Site Visit Address: Building 8411, Range Road, Joint Base McGuire-Dix-Lakehurst (JB MDL), NJ 08640.
  • Access Pass Security Gate (Mandatory 24-Hour Advance Notice):
    To obtain installation access instructions, prospective attendees must contact the Site Visit POC at least twenty-four (24) hours prior to the scheduled site visit date:
    • Ronnie Walker, Site Visit POC | Email: ronnie.walker1.civ@army.mil | Phone: (609) 562-4964

Post-Award Contract Execution & Security Sequence

To protect subcontractors, laborers, and the Government's interest, contract performance shall follow this strict chronological sequence. Physical mobilization, tool delivery, or actual onsite work is strictly prohibited prior to receiving the written Notice to Proceed (NTP):

  1. Contract Award: The Government executes and issues the Firm-Fixed-Price contract (SF 1442).
  2. Payment Security Submission (Within 10 Days of Award): The Contractor must submit one (1) of the following three (3) alternative payment protections in the amount of 100% of the contract award price to the Contracting Officer for review and approval:
    • Option A: A Payment Bond (SF 25A)
    • Option B: An Irrevocable Letter of Credit (ILC) in accordance with FAR 52.228-14
    • Option C: Certificates of Deposit from a federally insured financial institution, in an acceptable form executable solely by the CO.
  3. Notice to Proceed (NTP) Issuance: Upon written approval of the contractor's payment protection, the CO will issue the formal NTP, which officially starts the 60-calendar-day Period of Performance (PoP) clock.
  4. Pre-Construction Conference: Within five (5) calendar days of the NTP issuance, a conference will be conducted at Building 8411 to coordinate base access, safety, and scheduled utility shutdowns.
  5. GFP Custody Transfer (DD Form 1149): Following the approved pre-installation survey (PWS 5.1), a joint physical inspection of the Hotsy Steam Cleaner and Air Compressor will be conducted. Physical custody and the risk of loss will transfer to the Contractor immediately upon the signing of the DD Form 1149.
  6. Physical Onsite Work: The contractor shall commence physical onsite installation immediately following the GFP transfer.
Update #1 ·

Installation of Air Compressor and Steam Cleaner

LRC, Bldg 8411, Joint Base McGuire-Dix-Lakehurst (JB MDL), NJ

Solicitation No. W15QKN-26-Q-A109

Request for Quote (RFQ) 

Contract Type Firm-Fixed-Price (FFP)

Single-award commercial construction/installation

Set-Aside Status - 100% Total HUBZone Small Business

NAICS: 238290 (Other Building Equipment) | Size Standard: $25.5M

Bonding / Security

Alternative Payment Protections (FAR 28.102-1(b))

Pre-award bid bonds and standard 100% P&P bonds are waived.

Period of Performance 60 Calendar Days

Mandatory Labor Rates Davis-Bacon Act Prevailing Wages, Burlington County Building WD NJ20260027 (issued May 18, 2026)

Questions Deadline June 27, 2026, at 13:00 Local Time

Submitted in writing via email to CS and Technical POC

Proposal Deadline June 30, 2026

100% Electronic Submission via Email to CS

Primary Contact (CS)

Nelia Shyshak, Contract Specialist

nelia.shyshak.civ@army.mil

Summary of What the Contractor Shall Provide

To be deemed technically acceptable and responsive, the successful contractor must deliver the physical installations and technical deliverables detailed below:

  • Physical Installations & Specialty Trade Services (GFP Integration):
    • Hotsy Steam Cleaner (GFP): Position and secure one (1) Government-owned Hotsy Steam Cleaner (Model 5762SS 208, SN 11096540 100120) in the designated wash bay of Bldg 8411, JB MDL. Make all final natural gas (1/2 psig, 5.0" WC manifold pressure) and electrical utility connections.
    • Air Compressor (GFP): Position and secure one (1) Government-owned Air Compressor in the designated location within Bldg 8411, JB MDL, including installing vibration pads, mounting hardware, and anchoring.
    • Electrical Installations: Install approximately 190 feet of feed wire and conduit from the existing electrical panel to the steam cleaner. Replace the existing circuit breaker with a properly sized breaker. Terminate and secure all obsolete wiring/conduit. Install a local disconnect switch for the air compressor. Integrate a fusible link, surge protective device (SPD), or equivalent into the electrical panel or disconnect.
    • Gas Piping Installations: Install approximately 30 feet of natural gas piping from the ceiling to the steam cleaner equipment, including all fittings, supports, shutoff valves, and unions.
    • Testing and Commissioning: Perform comprehensive leak testing of gas piping, verify electrical voltage and amperage ratings, test the SPD, verify burner operation and pump performance, and execute full startup, calibration, and operational testing.
  • Mandatory Technical Submittals & Deliverables (SOW Section 10.0):
    • Onsite Survey Report (submitted and approved by Government prior to starting any physical work)
    • As-Built Drawings and Wiring Diagrams
    • Surge Protection Documentation
    • Test and Commissioning Report
    • Gas Leak Test Results
    • Electrical Verification Documentation / Reports
    • Manufacturer-compliant Warranty Documentation
  • Completed Cost Breakdown Form (Attachment 0003): Itemized breakdown specifying direct labor rates (compliant with WD NJ20260027), direct materials, direct equipment, and a separate breakout of Overhead/G&A and Profit at the bottom of the worksheet.

Mandatory Site Visit & Access Security Gates

Prospective offerors are highly encouraged to inspect the site prior to proposal submission to satisfy themselves regarding all conditions that may affect contract performance. Failure to inspect the site shall not constitute grounds for a claim after award.

  • Site Visit Schedule:
    • Primary Site Visit: Monday, June 22, 2026, from 7:30 AM to 4:00 PM (local time)
    • Secondary Site Visit: Thursday, June 25, 2026, from 7:30 AM to 4:00 PM (local time)
    • Site Visit Address: Building 8411, Range Road, Joint Base McGuire-Dix-Lakehurst (JB MDL), NJ 08640.
  • Access Pass Security Gate (Mandatory 24-Hour Advance Notice):
    To obtain installation access instructions, prospective attendees must contact the Site Visit POC at least twenty-four (24) hours prior to the scheduled site visit date:
    • Ronnie Walker, Site Visit POC | Email: ronnie.walker1.civ@army.mil | Phone: (609) 562-4964

Post-Award Contract Execution & Security Sequence

To protect subcontractors, laborers, and the Government's interest, contract performance shall follow this strict chronological sequence. Physical mobilization, tool delivery, or actual onsite work is strictly prohibited prior to receiving the written Notice to Proceed (NTP):

  1. Contract Award: The Government executes and issues the Firm-Fixed-Price contract (SF 1442).
  2. Payment Security Submission (Within 10 Days of Award): The Contractor must submit one (1) of the following three (3) alternative payment protections in the amount of 100% of the contract award price to the Contracting Officer for review and approval:
    • Option A: A Payment Bond (SF 25A)
    • Option B: An Irrevocable Letter of Credit (ILC) in accordance with FAR 52.228-14
    • Option C: Certificates of Deposit from a federally insured financial institution, in an acceptable form executable solely by the CO.
  3. Notice to Proceed (NTP) Issuance: Upon written approval of the contractor's payment protection, the CO will issue the formal NTP, which officially starts the 60-calendar-day Period of Performance (PoP) clock.
  4. Pre-Construction Conference: Within five (5) calendar days of the NTP issuance, a conference will be conducted at Building 8411 to coordinate base access, safety, and scheduled utility shutdowns.
  5. GFP Custody Transfer (DD Form 1149): Following the approved pre-installation survey (PWS 5.1), a joint physical inspection of the Hotsy Steam Cleaner and Air Compressor will be conducted. Physical custody and the risk of loss will transfer to the Contractor immediately upon the signing of the DD Form 1149.
  6. Physical Onsite Work: The contractor shall commence physical onsite installation immediately following the GFP transfer.

Files

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Installation of Government-Owned Air Compressor and Hotsy Steam Cleaner Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Design/Build Maintenance and Repair Army Reserve (MRAR), Area Maintenance Support Activity (AMSA) 21, JBMDL, NJ Joint Base MDL, New Jersey, United States · NAICS 236220 ENDIST Louisville Total Small Business
EOS Custodial Service Joint Base MDL, New Jersey 08641, United States · NAICS 561720 Air Mobility Command Competitive 8(a)
Reciprocating Air Compressor Pine Bluff Arsenal, AR 71602 · NAICS 333912 MICC Fort Drum Total Small Business
Locomotive Air Compressor Pine Bluff Arsenal 71602 · NAICS 333912 MICC Fort Drum Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors