Install scaffolding DOC & shipping (USCG forces micronesia/sector guam)
Closed Solicitation Posted
- Solicitation number
- REQ37350PR250000015
- Agency
-
Coast Guard
Department of Homeland Security
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- Place of performance
- Santa Rita Guam 96915, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The United States Coast Guard Forces Micronesia/Sector Guam is soliciting contractors to procure and install a specialized scaffold dock system to support Fast Response Cutter (FRC) maintenance operations at Apra Harbor. The procurement involves three primary deliverables: purchasing a scaffold dock measuring approximately 12 feet by 6 feet from an authorized dealer, arranging shipping and delivery to the installation site, and completing inspection and acceptance procedures. The floating platform must provide a minimum working height of 4 feet above the waterline, accommodate 4 maintenance personnel, and be constructed with marine-grade materials capable of withstanding saltwater and UV exposure, including safety features such as handrails, anti-slip surfaces, and secure boarding points. The contractor must provide qualified personnel for installation, delivery schedules, and progress reports throughout the project. This solicitation was posted on September 11, 2025, with responses due by September 12, 2025, providing an extremely tight turnaround time for potential bidders.
This opportunity does not utilize any set-aside designations and is open to all qualified contractors. No incumbent contractors or current service providers are identified in the solicitation materials. The contract calls for the procurement and installation of one (1) scaffold dock unit, with performance beginning immediately upon contract award. The work will be performed at U.S. Naval Station Victor Pier in Santa Rita, Guam 96915, supporting the Coast Guard's operational requirements in the Micronesia region. The technical specifications include detailed engineering drawings for scaffold platforms and floating dock systems, indicating the specialized nature of the marine equipment required for this mission-critical maintenance support capability.
Notice text
Install scaffolding Dock & Shipping for USCG Forces Micronesia/Sector Guam
Please see attached Statement of Work (SOW).
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Guatemala - Tactical Dock | US Embassy Guatemala City | No set-aside | |
| Dock-side (DS): USCGC WAESCHE Quarter 2 FY27 Repair | — | No set-aside | |
| Drydock: USCGC cobia dry dock availability FY2026 | Coast Guard | No set-aside | |
| Drydock repairs for the CGC anvil | — | Total Small Business | |
| YRBM-25 Dry-Docking Selected Restricted Availability (DSRA) and Vessel Transportation | Naval Supply Systems Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity