INDUSTRY REVIEW: Turbine Rehabilitation & Generator Rewind, Norfork Powerhouse
Closed Special Notice Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W9127S21R0001
- Agency
-
ENDIST Little Rock
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Norfork, Arkansas 72658, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Little Rock District published a Special Notice requesting industry feedback on draft specifications, drawings, and evaluation criteria for a turbine rehabilitation and generator rewind project at the Norfork Powerhouse in Arkansas. The Norfork Powerhouse is located near Salesville, Arkansas and was originally constructed in 1944 to provide flood control and hydropower.
The Special Notice seeks industry comments and questions by July 16, 2021 regarding requirements for designing, manufacturing, and installing new Francis turbines with improved dissolved oxygen levels; rewinding existing generators concurrently with turbine installation; and refurbishing associated equipment at the powerhouse. An in-person pre-solicitation site visit was held on June 30, 2021 to allow interested contractors to visit the site. To participate, contractors must submit any comments or questions in writing to the specified Contract Specialist by the July 16 deadline. This Special Notice is issued for information gathering purposes only and does not constitute a solicitation; the agency has not made any commitment to procure the opportunities discussed.
Notice text
REQUEST FOR INFORMATION
Turbine Rehabilitation and Generator Rewind
Norfork Lake, Dam and Powerhouse
White River Basin, Baxter County, Arkansas
U.S. Army Corps of Engineers (USACE)
Little Rock District (SWL)
1.0 Description
1.1 The U.S. Army Corps of Engineers, Little Rock District, has been tasked to solicit for and award a construction contract for the Norfork Powerhouse Turbine Rehabilitation and Generator Rewind requirement.
1.2 This is a REQUEST FOR INFORMATION (RFI) only. This RFI is issued solely for information and planning purposes - it does not constitute a Request for Proposal (RFP) / Request for Prototype Proposal (RPP) or a promise to issue an RFP/RPP in the future. This Request for Information does not commit the Government to contract for any supply or service whatsoever. Interested parties are advised that the U.S. Government will not pay for any information or administrative costs incurred in response to this RFI; all costs associated with responding to this RFI will be solely at the interested party's expense. Not responding to this RFI does not preclude participation in any future RFP/RPP, if any are issued.
2.0 Background.
The Norfork Powerhouse is located in Arkansas near the city of Salesville, AR. The original primary purposes of the Norfork project were for flood control and hydropower. The project started producing power online in 1944. There are two vertical axis, single cast, 17 bucket, Francis type turbines installed at the powerhouse each with a discharge diameter of 145.56 inches and synchronous speed of 128.6 RPM. The turbines were manufactured by the S. Morgan Smith Company with a rated output of 42,000 horsepower (31.32 MW) at rated head of 160 feet. The existing turbines have exceeded their expected design life.
The work under this requirement includes design, manufacture, and install of Francis turbines, improvement of dissolved oxygen levels, rewinding of existing generator, and refurbishing associated equipment and components. The runner shall be designed using both Computational Fluid Dynamics (CFD) and a physical performance (scale) model. The latest design and proven technologies shall be applied to develop aerating capability for the replacement turbines. The existing generators will be rewound concurrent with the supply and installation of the turbines.
3.0 Requested Information
SWL is seeking feedback on Specifications, Drawings, Evaluation Criteria, etc.
4.0 Responses
4.1 Interested parties are requested to respond to this RFI via ProjNet. The key SZIXBA-9497ZM has been established. Industry may provide comments from June 16, 2021, until July 16, 2021.
5.0 Pre-Solicitation Site Visit
SWL has scheduled an in-person pre-solicitation site visit at Norfork Powerhouse on June 30, 2021 at 10:00 AM CST. All interested parties are invited to attend; however, all social distancing guidelines must be followed. Visit https://www.cdc.gov/ for the most current set of guidelines.
6.0 Questions
Questions regarding this RFI shall be submitted in writing via email to the Contract Specialist, Sarah.N.Hagood@usace.army.mil. Verbal questions will NOT be accepted.
7.0 Summary
This is a REQUEST FOR INFORMATION (RFI) only. Its purpose is to attract industry feedback on draft Specifications, Drawings, Evaluation Criteria, etc. The information provided in this RFI is subject to change and is not binding to the Government. SWL has not made a commitment to procure any of the items discussed, and release of this RFI should not be construed as such a commitment or as authorization to incur cost for which reimbursement would be required or sought. All submissions become Government property and will not be returned.
***The DRAFT Reference Drawings document is too large to upload to SAM. Please email Sarah.N.Hagood@usace.army.mil to request this document via DoD SAFE.
Files
| File | Type | Posted |
|---|---|---|
| B.01.04 Site Visit Attendance Record.pdf | ||
| Draft Solicitation for Industry Review- 21R0001.pdf | ||
| DRAFT Contract Drawings.pdf | ||
| DRAFT Specifications.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Turbine Rehabilitation & Generator Rewind, Norfork Powerhouse | Award Notice | |
| Turbine Rehabilitation & Generator Rewind, Norfork Powerhouse | Solicitation | |
| Turbine Rehabilitation & Generator Rewind, Norfork Powerhouse | Pre-Solicitation | |
| This notice | Special Notice | |
| Turbine Replacement & Generator Rewind, Norfork Powerhouse | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Eufaula Powerhouse Hydroelectric Generator Rewind | ENDIST Tulsa | No set-aside | |
| Webbers Falls U1 Speed Increaser Gearbox Replacement | ENDIST Tulsa | No set-aside | |
| Tenkiller Hydropower Excitation System Replacement | ENDIST Tulsa | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity