Draft Solicitation for Industry Review- 21R0001.pdf

PDF 2 MB Posted

Attached to
INDUSTRY REVIEW: Turbine Rehabilitation & Generator Rewind, Norfork Powerhouse
Solicitation number
W9127S21R0001
Issued by

About this file

This special notice requests industry feedback on draft specifications, drawings, and evaluation criteria for a turbine rehabilitation and generator rewind project at the Norfork Powerhouse in Arkansas. The U.S. Army Corps of Engineers, Little Rock District is seeking comments through July 16, 2021 on requirements for new Francis turbines, dissolved oxygen improvement, generator rewinds, and associated refurbishments. An in-person pre-solicitation site visit will be held on June 30, 2021, following COVID-19 guidelines. Questions should be submitted to the listed contract specialist by email. This request for information is not a solicitation and does not obligate the government for any costs.

View the file

Other files

File Type Posted
B.01.04 Site Visit Attendance Record.pdf PDF
DRAFT Specifications.pdf PDF
DRAFT Contract Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This is a REQUEST FOR INFORMATION (RFI) only. The Government is seeking feedback on this DRAFT Solicitation.

Project Title: Turbine Rehabilitation and Generator Rew ind, Norfork Lake, Dam and Pow erhouse, White River Basin, Baxter County, Arkansas

Project Number: 401258

Magnitude of Construction: Betw een $25,000,000 and $75,000,000

Set-Aside: Full and Open Competition

NAICS: 237990, Other Heavy and Civil Engineering Construction SBA Size Standard: $39,500,000

Site Visit: An organized Pre-Solicitation Site Visit has been scheduled for June 30, 2021, at the Norfork Pow erhouse. Please see FAR 52.236-27 Alt 1 in section 00 21 00 for complete details.

Industry Comments: Potential Offerors are invited to provide comments on this draft solicitation via ProjNet. The key SZIXBA-9497ZM has been established. Industry may provide comments from June 16, 2021, until July 16, 2021.

SARAH N HAGOOD 501-340-1277

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED (RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________1975 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________00 72 00

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________16 Jul 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIVISION

USACE, LITTLE ROCK (W9127S)

700 W. CAPITOL AVE, RM 7315

LITTLE ROCK AR 72201-3225

W9127S

PAGE OF PAGES

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

05:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

(501) 324-5196FAX:TEL: (501) 340-5720 TEL: FAX:

W9127S21R0001 1 OF 89TBD

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W9127S21R0001

Section 00 10 00 - Solicitation

PRICING SCHEDULE

Line Item No.

Description Quantity Unit of Measure

Unit Price Amount

BASE ITEMS

0001 Hydraulic Turbine Model (Applies to both Units 1&2) 1 Job XXX $

0002 Site Mobilization and Demobilization (Applies to both Units 1&2)

1 Job XXX $

0003 On-Site Lead-Based Paint Removal (Applies to both Units 1&2)

17,200

EST

Square Foot

0004 Special Tools and Scaffolding (Applies to both Units 1&2) 1 Job XXX $

0005 Furnish Spares (Applies to both Units 1&2)

0005AA Spare Turbine Shaft Sleeve (Applies to both Units 1&2) 1 Job XXX $

0005AB Spare Wicket Gate Stem Seal Sets (Applies to both Units 1&2)

1 Job XXX $

0005AC Spare Servomotor Packing Box Stem Seals (Applies to both Units 1&2)

1 Job XXX $

0005AD Furnish Spare Set of RTD's and Relays (Applies to both Units 1&2)

1 Job XXX $

0005AE Furnish Spare Generator Parts (Applies to both Units 1&2) 1 Lump Sum

XXX $

0006 Furnish and Test Prototype Coils (Applies to both Units 1&2)

1 Lump Sum

XXX $

0007 Provision of Boring Bar (Applies to both Units 1&2) 1 Job XXX $

0008 Governor and Lube Oil (Applies to both Units 1&2)

0008AA Drain, Clean, and Flush System (Applies to both Units 1&2)

1 Job XXX $

0008AB Disposal of Old Oil (Applies to both Units 1&2) 4,920

EST

Gallon $ $

0008AC Supply and Filling of New Oil (Applies to both Units 1&2) 4,920

EST

Gallon $ $

0009 Inspect, Load Test, and Name Plate BTH Devices (Applies to both Units 1&2)

1 Job XXX $

0010 Unit 1- Painting 1 Each $ $

0011 Unit 1- Francis Runner 1 Each $ $

0012 Unit 1- Pre-disassembly Investigation 1 Each $ $

0013 Unit 1- Generating Unit Disassembly Including Inspections of Components

1 Each $ $

0014 Unit 1- Reassembly of Generating Unit 1 Each $ $

0015 Unit 1- Testing After Reassembly 1 Each $ $

0016 Unit 1- Line Bore Wicket Gate Stem Housing 1 Each $ $

0017 Unit 1- Stay Ring Inspection 1 Each $ $

0018 Unit 1- Replace Wicket Gates 1 Each $ $

0019 Unit 1- Supply Stationary Sealing Ring 1 Each $ $

0020 Unit 1- Head Cover Refurbishment 1 Each $ $

0021 Unit 1- Turbine Guide Bearing Housing Refurbishment 1 Each $ $

0022 Unit 1- Bottom Ring Refurbishment 1 Each $ $

0023 Unit 1- Turbine Air Inlet Valve Refurbishment 1 Each $ $

0024 Unit 1- Furnish and Install All Bushings and Bearing Plates 1 Each $ $

0025 Unit 1- Refurbish Wicket Gate Operating Mechanism 1 Each $ $

0026 Unit 1- Refurbish Shear Linkages 1 Each $ $

0027 Unit 1- Furnish and Install Turbine Shaft Sleeve 1 Each $ $

0028 Unit 1- Operating Ring Refurbishment 1 Each $ $

0029 Unit 1- Turbine and Generator Shaft

0029AA Unit 1- Turbine and Generator Shaft Inspection 1 Each $ $

0029AB Unit 1- Machining of Turbine Shaft 1 Each $ $

0030 Unit 1- Supply and Install Main Turbine Shaft Packing Box 1 Each $ $

0031 Unit 1- Refurbish Wicket Gate Servomotor 1 Each $ $

0032 Unit 1- Thrust Runner Phase 1 Inspection 1 Each $ $

0033 Unit 1- Thrust Bearing Shoe Refurbishment

0033AA Unit 1- Shipment of Thrust Bearing Shoes 1 Each $ $

0033AB Unit 1- Refurbish Set of Shoes 1 Each $ $

0034 Unit 1- Guide Bearing Refurbishment

0034AA Unit 1- Shipment of Turbine Guide Bearing 1 Each $ $

0034AB Unit 1- Ship Set of Guide Bearing Pads 1 Each $ $

0034AC Unit 1- Refurbish Turbine Guide Bearing 1 Each $ $

0034AD Unit 1- Refurbish Set of Guide Bearing Pads 1 Each $ $

0035 Unit 1- Setup for Machining and Machining up to 0.020" 1 Each $ $

0036 Unit 1- Spiral Case Inspection 1 Each $ $

0037 Unit 1- Discharge Ring Inspection 1 Each $ $

0038 Unit 1- Piezometer Tap Inspection and Repair 1 Each $ $

0039 Unit 1- Replace Fasteners for Runner-to-Shaft Couplings 1 Each $ $

0040 Unit 1- Replacement of Turbine Bearing Pumps and Installation of New Oil Sump Tank

1 Each $ $

0041 Unit 1- Generator Brake and Manual Oil Pump Refurbishment

1 Each $ $

0042 Unit 1- Inspect Generator Brake Rings 1 Each $ $

0043 Unit 1- High Pressure Lift System 1 Each $ $

0044 Unit 1- Refurbishment of Governors 1 Each $ $

0045 Unit 1- Disassemble, Inspect, Overhaul, and Reinstall Governor Pumps

1 Each $ $

0046 Unit 1- Miscellaneous Electrical Work As Described in 26 05 00.00 26

1 Each $ $

0047 Unit 1- Furnish Complete Set of Stator Coils, Supplies, and Accessories

1 Each $ $

0048 Unit 1- Remove Stator Winding 1 Each $ $

0049 Unit 1- Inspect, Clean, and Test Stator Core 1 Each $ $

0050 Unit 1- Inspect, Clean, and Test Rotor 1 Each $ $

0051 Unit 1- Install and Test Stator Winding 1 Each $ $

0052 Unit 1- Perform Special Field Tests 1 Each $ $

0053 Unit 1- Replace Existing Current Transformers 1 Each $ $

0054 Unit 1- Collector Ring Assembly Inspection 1 Each $ $

0055 Unit 1- Chrome Plate Piston Rods 1 Each $ $

0056 Unit 1- Machining of Curb Ring 1 Each $ $

0057 Unit 1- Void Mapping of Draft Tube Liner 1 Each $ $

0058 Unit 1- Surface Air Coolers 9 Each $ $

0059 Unit 1- Machine Condition Monitoring System 1 Each $ $

0060 Unit 1- Replace Thrust Bearing Oil Coolers 16 Each $ $

0061 Unit 1- Thrust Sump Kidney Loop Filter 1 Each $ $

0062 Unit 1- Head Cover Drainage Improvement 1 Each $ $

0063 Unit 1- Miscellaneous Turbine Pit Piping Work as Described in Section 22 00 00.00 26

1 Each $ $

0064 Unit 1- Remove Farval Grease System 1 Each $ $

0065 Unit 2- Painting 1 Each $ $

0066 Unit 2- Francis Runner 1 Each $ $

0067 Unit 2- Pre-disassembly Investigation 1 Each $ $

0068 Unit 2- Generating Unit Disassembly Including Inspections of Components

1 Each $ $

0069 Unit 2- Reassembly of Generating Unit 1 Each $ $

0070 Unit 2- Testing After Reassembly 1 Each $ $

0071 Unit 2- Line Bore Wicket Gate Stem Housing 1 Each $ $

0072 Unit 2- Stay Ring Inspection 1 Each $ $

0073 Unit 2- Replace Wicket Gates 1 Each $ $

0074 Unit 2- Supply Stationary Sealing Ring 1 Each $ $

0075 Unit 2- Head Cover Refurbishment 1 Each $ $

0076 Unit 2- Turbine Guide Bearing Housing Refurbishment 1 Each $ $

0077 Unit 2- Bottom Ring Refurbishment 1 Each $ $

0078 Unit 2- Turbine Air Inlet Valve Refurbishment 1 Each $ $

0079 Unit 2- Furnish and Install All Bushings and Bearing Plates 1 Each $ $

0080 Unit 2- Refurbish Wicket Gate Operating Mechanism 1 Each $ $

0081 Unit 2- Refurbish Shear Linkages 1 Each $ $

0082 Unit 2- Furnish and Install Turbine Shaft Sleeve 1 Each $ $

0083 Unit 2- Operating Ring Refurbishment 1 Each $ $

0084 Unit 2- Turbine and Generator Shaft

0084AA Unit 2- Turbine and Generator Shaft Inspection 1 Each $ $

0084AB Unit 2- Machining of Turbine Shaft 1 Each $ $

0085 Unit 2- Supply and Install Main Turbine Shaft Packing Box 1 Each $ $

0086 Unit 2- Refurbish Wicket Gate Servomotor 1 Each $ $

0087 Unit 2- Thrust Runner Phase 1 Inspection 1 Each $ $

0088 Unit 2- Thrust Bearing Shoe Refurbishment

0088AA Unit 2- Shipment of Thrust Bearing Shoes 1 Each $ $

0088AB Unit 2- Refurbish Set of Shoes 1 Each $ $

0089 Unit 2- Guide Bearing Refurbishment

0089AA Unit 2- Shipment of Turbine Guide Bearing 1 Each $ $

0089AB Unit 2- Ship Set of Guide Bearing Pads 1 Each $ $

0089AC Unit 2- Refurbish Turbine Guide Bearing 1 Each $ $

0089AD Unit 2- Refurbish Set of Guide Bearing Pads 1 Each $ $

0090 Unit 2- Setup for Machining and Machining up to 0.020" 1 Each $ $

0091 Unit 2- Spiral Case Inspection 1 Each $ $

0092 Unit 2- Discharge Ring Inspection 1 Each $ $

0093 Unit 2- Piezometer Tap Inspection and Repair 1 Each $ $

0094 Unit 2- Replace Fasteners for Runner-to-Shaft Couplings 1 Each $ $

0095 Unit 2- Replacement of Turbine Bearing Pumps and Installation of New Oil Sump Tank

1 Each $ $

0096 Unit 2- Generator Brake and Manual Oil Pump Refurbishment

1 Each $ $

0097 Unit 2- Inspect Generator Brake Rings 1 Each $ $

0098 Unit 2- High Pressure Lift System 1 Each $ $

0099 Unit 2- Refurbishment of Governors 1 Each $ $

0100 Unit 2- Disassemble, Inspect, Overhaul, and Reinstall Governor Pumps

1 Each $ $

0101 Unit 2- Miscellaneous Electrical Work As Described in 26 05 00.00 26

1 Each $ $

0102 Unit 2- Furnish Complete Set of Stator Coils, Supplies, and Accessories

1 Each $ $

0103 Unit 2- Remove Stator Winding 1 Each $ $

0104 Unit 2- Inspect, Clean, and Test Stator Core 1 Each $ $

0105 Unit 2- Inspect, Clean, and Test Rotor 1 Each $ $

0106 Unit 2- Install and Test Stator Winding 1 Each $ $

0107 Unit 2- Replace Existing Current Transformers 1 Each $ $

0108 Unit 2- Collector Ring Assembly Inspection 1 Each $ $

0109 Unit 2- Chrome Plate Piston Rods 1 Each $ $

0110 Unit 2- Machining of Curb Ring 1 Each $ $

0111 Unit 2- Void Mapping of Draft Tube Liner 1 Each $ $

0112 Unit 2- Surface Air Coolers 9 Each $ $

0113 Unit 2- Machine Condition Monitoring System 1 Each $ $

0114 Unit 2- Replace Thrust Bearing Oil Coolers 16 Each $ $

0115 Unit 2- Thrust Sump Kidney Loop Filter 1 Each $ $

0116 Unit 2- Head Cover Drainage Improvement 1 Each $ $

0117 Unit 2- Miscellaneous Turbine Pit Piping Work as Described in Section 22 00 00.00 26

1 Each $ $

0118 Unit 2- Remove Farval Grease System 1 Each $ $

0119 Miscellaneous Parts and Materials (Applies to both Units 1&2)

NTE

100,000

Each $ 1.00

100,000.00

0120 Welding Services (Applies to both Units 1&2) 150 EST Man Hours

0121 Machinist Hire (Applies to both Units 1&2) 200 EST Man Hours

0122 Electrical Hire (Applies to both Units 1&2) 100 EST Man Hours

0123 Painter Hire (Applies to both Units 1&2) 50 EST Man Hours

0124 Other Skilled Craftsman Hire (Applies to both Units 1&2) 100 EST Man Hours

0125 General Laborer Hire (Applies to both Units 1&2) 100 EST Man Hours

0126 Liquid Penetrant Method (Applies to both Units 1&2) 50 EST Man Hours

0127 Magnetic Particle Method (Applies to both Units 1&2) 50 EST Man Hours

0128 Ultrasonic Method (Applies to both Units 1&2) 50 EST Man Hours

0129 Radiographic Method (Applies to both Units 1&2) 20 EST Man Hours

0130 Thermal Spraying (Applies to both Units 1&2) 30 EST Man Hours

0131 Visual (Applies to both Units 1&2) 100 EST Man Hours

TOTAL BASE PROPOSAL $

OPTIONAL ITEMS

0132 Prepare Die and Stamp Stator Laminations (Applies to both Units 1&2)

1 Job XXX $

0133 Thrust Bearing Phase 2 Inspection (Spare Only) (Applies to both Units 1&2)

0133AA Thrust Bearing Phase 2 Inspection without Splitting (Spare Only) (Applies to both Units 1&2)

1 Job XXX $

0133AB Thrust Bearing Phase 2 Inspection with Splitting (Spare Only) (Applies to both Units 1&2)

1 Job XXX $

0134 Unit 1- Additional Stay Ring Mounting Surface Machining 1 Each $ $

0135 Unit 1- Additional Head Cover Flange Machining 1 Each $ $

0136 Unit 1- Additional Bottom Ring Flange Machining 1 Each $ $

0137 Unit 1- Additional Bearing Housing Machining 1 Each $ $

0138 Unit 1- Additional Curb Ring Machining 1 Each $ $

0139 Unit 1- Refurbish Generator Brake Rings 1 Each $ $

0140 Unit 1- Thrust Bearing Phase 2 Inspection

0140AA Unit 1- Thrust Bearing Phase 2 Inspection without Splitting 1 Each $ $

0140AB Unit 1- Thrust Bearing Phase 2 Inspection with Splitting 1 Each $ $

0141 Unit 1- Generator Thrust Bearing Runner and Guide Runner

0141AA Unit 1- Shipment of Thrust Bearing Runner and Guide

1 Each $ $

0141AB Unit 1- Resurfacing Thrust Bearing Runner and Backside 1 Each $ $

0141AC Unit 1- Resurfacing Thrust Bearing Runner Running Surface Only

1 Each $ $

0141AD Unit 1- Thrust Guide Runner Refurbishment 1 Each $ $

0142 Unit 1- Refurbish Rotor Field Poles 1 Each $ $

0143 Unit 1- Reinsulate Rotor Field Leads 1 Each $ $

0144 Unit 1- Refurbish Collector Rings and Replace Brushes, and Brush Holders

1 Each $ $

0145 Unit 1- Replace Collector Rings, Brushes, and Brush Holders

1 Each $ $

0146 Unit 1- Perform Additional Stator Core Interlaminar Insulation Test

1 Job XXX $

0147 Unit 1- Remove Existing Stator Core, Install New Stator Core

1 Each $ $

0148 Unit 1- Governor Pumps Additional Machine Work - Level A

1 Each $ $

0149 Unit 1- Governor Pumps Additional Machine Work - Level B

1 Each $ $

0150 Unit 1- Governor Pumps Additional Machine Work - Level C

1 Each $ $

0151 Unit 1- Governor Pumps Additional Machine Work - Level D

1 Each $ $

0152 Unit 1- Turbine Guide Bearing Build up of the Split Flange Faces

1 Each $ $

0153 Unit 1- Turbine Guide Bearing Build up of the O.D. Spigot Fits

1 Each $ $

0154 Unit 1- Gate Distributing Valve Components

0154AA Unit 1- Furnish Gate Distributing Valve Plunger 1 Each $ $

0154AB Unit 1- Furnish Gate Distributing Valve Bushing 1 Each $ $

0154AC Unit 1- Furnish Gate Distributing Valve Piston 1 Each $ $

0154AD Unit 1- Furnish Gate Distributing Valve Stem 1 Each $ $

0155 Unit 1- Core Drilling for Piping Work as Described in Section 22 00 00.00 26

1 Each $ $

0156 Unit 1- Epoxy Injection in Draft Tube Liner 20 EST Gallon $ $

0157 Unit 1- New Turbine Guide Bearing Shell 1 Each $ $

0158 Unit 1- Restore Servomotor Head Spigot Fit 1 Each $ $

0159 Unit 1- Additional Cylinder Bore and Replace Servomotor Pistons

1 Each $ $

0160 Unit 1- Discharge Ring Repair 1 Each $ $

0161 Unit 2- Additional Stay Ring Mounting Surface Machining 1 Each $ $

0162 Unit 2- Additional Head Cover Flange Machining 1 Each $ $

0163 Unit 2- Additional Bottom Ring Flange Machining 1 Each $ $

0164 Unit 2- Additional Bearing Housing Machining 1 Each $ $

0165 Unit 2- Additional Curb Ring Machining 1 Each $ $

0166 Unit 2- Refurbish Generator Brake Rings 1 Each $ $

0167 Unit 2- Thrust Bearing Phase 2 Inspection

0167AA Unit 2- Thrust Bearing Phase 2 Inspection without Splitting 1 Each $ $

0167AB Unit 2- Thrust Bearing Phase 2 Inspection with Splitting 1 Each $ $

0168 Unit 2- Generator Thrust Bearing Runner and Guide

0168AA Unit 2- Shipment of Thrust Bearing Runner and Guide

1 Each $ $

0168AB Unit 2- Resurfacing Thrust Bearing Runner and Backside 1 Each $ $

0168AC Unit 2- Resurfacing Thrust Bearing Runner Running Surface Only

1 Each $ $

0168AD Unit 2- Thrust Guide Runner Refurbishment 1 Each $ $

0169 Unit 2- Refurbish Rotor Field Poles 1 Each $ $

0170 Unit 2- Reinsulate Rotor Field Leads 1 Each $ $

0171 Unit 2- Refurbish Collector Rings and Replace Brushes, and Brush Holders

1 Each $ $

0172 Unit 2- Replace Collector Rings, Brushes, and Brush Holders

1 Each $ $

0173 Unit 2- Perform Additional Stator Core Interlaminar Insulation Test

1 Each $ $

0174 Unit 2- Remove Existing Stator Core, Install New Stator Core

1 Each $ $

0175 Unit 2- Governor Pumps Additional Machine Work - Level A

1 Each $ $

0176 Unit 2- Governor Pumps Additional Machine Work - Level B

1 Each $ $

0177 Unit 2- Governor Pumps Additional Machine Work - Level C

1 Each $ $

0178 Unit 2- Governor Pumps Additional Machine Work - Level D

1 Each $ $

0179 Unit 2- Turbine Guide Bearing Build up of the Split Flange Faces

1 Each $ $

0180 Unit 2- Turbine Guide Bearing Build up of the O.D. Spigot Fits

1 Each $ $

0181 Unit 2- Gate Distributing Valve Components

0181AA Unit 2- Furnish Gate Distributing Valve Plunger 1 Each $ $

0181AB Unit 2- Furnish Gate Distributing Valve Bushing 1 Each $ $

0181AC Unit 2- Furnish Gate Distributing Valve Piston 1 Each $ $

0181AD Unit 2- Furnish Gate Distributing Valve Stem 1 Each $ $

0182 Unit 2- Core Drilling for Piping Work as Described in Section 22 00 00.00 26

1 Each $ $

0183 Unit 2- Epoxy Injection in Draft Tube Liner 20 EST Gallon $ $

0184 Unit 2- New Turbine Guide Bearing Shell 1 Each $ $

0185 Unit 2- Restore Servomotor Head Spigot Fit 1 Each $ $

0186 Unit 2- Additional Cylinder Bore and Replace Servomotor Pistons

1 Each $ $

0187 Unit 2- Discharge Ring Repair 1 Each $ $

TOTAL OPTIONAL PROPOSAL $

TOTAL PROPOSAL AMOUNT (BASE PLUS

OPTIONAL ITEMS)

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 1975 dys. ANP 1 NORFORK POWERHOUSE

1487 HIGHWAY 177

SALESVILLE AR 72653

FOB: Destination

96721H

0002 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0003 1975 dys. ANP 17,200 (SAME AS PREVIOUS LOCATION)

0004 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0005 N/A N/A N/A N/A

0005AA 1975 dys. ANP 1 NORFORK POWERHOUSE

1487 HIGHWAY 177

SALESVILLE AR 72653

0005AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0005AC 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0005AD 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0005AE 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0006 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0007 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0008 N/A N/A N/A N/A

0008AA 1975 dys. ANP 1 NORFORK POWERHOUSE

1487 HIGHWAY 177

SALESVILLE AR 72653

0008AB 1975 dys. ANP 4,920 (SAME AS PREVIOUS LOCATION)

0008AC 1975 dys. ANP 4,920 (SAME AS PREVIOUS LOCATION)

0009 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0010 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0011 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0012 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0013 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0014 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0015 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0016 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0017 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0018 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0019 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0020 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0021 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0022 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0023 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0024 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0025 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0026 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0027 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0028 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0029 N/A N/A N/A N/A

0029AA 1975 dys. ANP 1 NORFORK POWERHOUSE

1487 HIGHWAY 177

SALESVILLE AR 72653

0029AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0030 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0031 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0032 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0033 N/A N/A N/A N/A

0033AA 1975 dys. ANP 1 NORFORK POWERHOUSE

1487 HIGHWAY 177

SALESVILLE AR 72653

0033AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0034 N/A N/A N/A N/A

0034AA 1975 dys. ANP 1 NORFORK POWERHOUSE

1487 HIGHWAY 177

SALESVILLE AR 72653

0034AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0034AC 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0034AD 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0035 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0036 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0037 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0038 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0039 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0040 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0041 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0042 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0043 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0044 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0045 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0046 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0047 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0048 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0049 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0050 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0051 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0052 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0053 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0054 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0055 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0056 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0057 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0058 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0059 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0060 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0061 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0062 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0063 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0064 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0065 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0066 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0067 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0068 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0069 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0070 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0071 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0072 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0073 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0074 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0075 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0076 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0077 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0078 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0079 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0080 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0081 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0082 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0083 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0084 N/A N/A N/A N/A

0084AA 1975 dys. ANP 1 NORFORK POWERHOUSE

1487 HIGHWAY 177

SALESVILLE AR 72653

0084AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0085 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0086 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0087 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0088 N/A N/A N/A N/A

0088AA 1975 dys. ANP 1 NORFORK POWERHOUSE

1487 HIGHWAY 177

SALESVILLE AR 72653

0088AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0089 N/A N/A N/A N/A

0089AA 1975 dys. ANP 1 NORFORK POWERHOUSE

1487 HIGHWAY 177

SALESVILLE AR 72653

0089AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0089AC 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0089AD 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0090 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0091 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0092 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0093 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0094 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0095 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0096 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0097 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0098 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0099 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0100 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0101 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0102 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0103 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0104 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0105 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0106 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0107 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0108 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0109 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0110 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0111 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0112 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0113 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0114 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0115 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0116 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0117 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0118 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0119 1975 dys. ANP 100,000 (SAME AS PREVIOUS LOCATION)

0120 1975 dys. ANP 150 (SAME AS PREVIOUS LOCATION)

0121 1975 dys. ANP 200 (SAME AS PREVIOUS LOCATION)

0122 1975 dys. ANP 100 (SAME AS PREVIOUS LOCATION)

0123 1975 dys. ANP 50 (SAME AS PREVIOUS LOCATION)

0124 1975 dys. ANP 100 (SAME AS PREVIOUS LOCATION)

0125 1975 dys. ANP 100 (SAME AS PREVIOUS LOCATION)

0126 1975 dys. ANP 50 (SAME AS PREVIOUS LOCATION)

0127 1975 dys. ANP 50 (SAME AS PREVIOUS LOCATION)

0128 1975 dys. ANP 50 (SAME AS PREVIOUS LOCATION)

0129 1975 dys. ANP 20 (SAME AS PREVIOUS LOCATION)

0130 1975 dys. ANP 30 (SAME AS PREVIOUS LOCATION)

0131 1975 dys. ANP 100 (SAME AS PREVIOUS LOCATION)

0132 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0133 N/A N/A N/A N/A

0133AA 1975 dys. ANP 1 NORFORK POWERHOUSE

1487 HIGHWAY 177

SALESVILLE AR 72653

0133AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0134 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0135 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0136 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0137 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0138 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0139 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0140 N/A N/A N/A N/A

0140AA 1975 dys. ANP 1 NORFORK POWERHOUSE

1487 HIGHWAY 177

SALESVILLE AR 72653

0140AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0141 N/A N/A N/A N/A

0141AA 1975 dys. ANP 1 NORFORK POWERHOUSE

1487 HIGHWAY 177

SALESVILLE AR 72653

0141AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0141AC 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0141AD 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0142 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0143 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0144 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0145 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0146 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0147 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0148 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0149 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0150 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0151 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0152 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0153 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0154 N/A N/A N/A N/A

0154AA 1975 dys. ANP 1 NORFORK POWERHOUSE

1487 HIGHWAY 177

SALESVILLE AR 72653

0154AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0154AC 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0154AD 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0155 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0156 1975 dys. ANP 20 (SAME AS PREVIOUS LOCATION)

0157 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0158 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0159 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0160 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0161 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0162 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0163 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0164 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0165 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0166 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0167 N/A N/A N/A N/A

0167AA 1975 dys. ANP 1 NORFORK POWERHOUSE

1487 HIGHWAY 177

SALESVILLE AR 72653

0167AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0168 N/A N/A N/A N/A

0168AA 1975 dys. ANP 1 NORFORK POWERHOUSE

1487 HIGHWAY 177

SALESVILLE AR 72653

0168AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0168AC 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0168AD 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0169 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0170 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0171 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0172 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0173 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0174 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0175 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0176 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0177 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0178 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0179 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0180 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0181 N/A N/A N/A N/A

0181AA 1975 dys. ANP 1 NORFORK POWERHOUSE

1487 HIGHWAY 177

SALESVILLE AR 72653

0181AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0181AC 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0181AD 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0182 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0183 1975 dys. ANP 20 (SAME AS PREVIOUS LOCATION)

0184 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0185 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0186 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0187 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

Section 00 21 00 - Instructions

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.209-7 Information Regarding Responsibility Matters OCT 2018 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.215-20 Requirements for Certified Cost or Pricing Data or

Information Other Than Certified Cost or Pricing Data

OCT 2010

52.217-5 Evaluation Of Options JUL 1990 52.225-10 Notice of Buy American Requirement--Construction

Materials

MAY 2014

52.232-13 Notice Of Progress Payments APR 1984 52.236-28 Preparation of Proposals--Construction OCT 1997 52.237-10 Identification of Uncompensated Overtime MAR 2015 252.204-7004 Antiterrorism Awareness Training for Contractors. FEB 2019 252.215-7008 Only One Offer JUL 2019

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price (FFP) Construction contract resulting from this solicitation.

(End of provision)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

3.3% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Norfork Powerhouse, Salesville, Baxter County, Arkansas.

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be twenty (20) percent of the bid price or $3,000,000.00, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

Jonathan J. Sawrie Contracting Officer Post Office Box 867 700 West Capitol, Room 7315 Little Rock, Arkansas 72203

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the

GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized Pre-Solicitation Site Visit has been scheduled for June 30, 2021 at 10:00 AM CST

(c) Participants will meet at Norfork Powerhouse 1487 Highway 177 Salesville, Arkansas 72653

**All attendees will be limited to two (2) representatives at the site visit. All attendees shall comply with the social distancing guidelines found at https://www.cdc.gov/.

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Defense Federal Acquisition Regulation Supplement (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

Section 00 22 16 - Supplementary Instructions to Proposers

SECTION 00 22 16 - PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION

CRITERIA, AND BASIS OF AWARD

GENERAL REQUIREMENTS

The proposal shall describe the capability of the Offeror to perform the requirements of the Specifications. The proposal should be specific and complete in every detail; and should be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the requirements. The proposal should be practical, legible, clear, and coherent.

In order to evaluate all proposals effectively and equitably, the Contracting Officer must receive information containing sufficient detail to allow review and evaluation by the Government. Proposal clarity, organization, and cross-referencing are mandatory. Failure to submit and organize proposals as requested may adversely affects an Offeror's evaluation.

Proposals shall not exceed the page limits described. Provide all information in bookmarked sections. Appendices and/or attachments are not permitted and will not be evaluated.

SUBMISSION FORMAT

METHOD OF SUBMISSION. Offerors shall submit one (1) electronic copy of their proposal via DoD SAFE (https://safe.apps.mil/) before the time and date specified in the solicitation (Standard Form 1442).

1. Send an email to the Contracting Officer AND Contract Specialist to receive the link to drop off your proposal. This shall be completed no later than five (5) business days prior to the proposal due date.

i. Contracting Officer: donald.p.tam@usace.army.mil

ii. Contract Specialist: sarah.n.hagood@usace.army.mil

2. You will receive an email with the link to submit your drop-off. The link will be provided no later than two

(2) business days prior to the proposal due date.

3. Once in DoD SAFE, please add your files in accordance with the File Format section below. Please add ‘W9127S21R0001- Firm Name’ in the Short Note to the Recipients box.

4. Add the Contracting Officer AND Contract Specialist as recipients.

5. Ensure everything is correct, and then click “Drop-off Files” to send.

Should DoD SAFE be unavailable, proposals may be submitted via Compact Disk (CD) and delivered to

US Army Corps of Engineers ATTN: Sarah Hagood Solicitation W9127S21R0001 700 West Capitol Avenue Little Rock, AR 72203

FILE FORMAT. Files shall be in Portable Document Format, filename extension: “.pdf” and suitable for viewing in Adobe Reader. There shall only be three files in each Offerors’ submission: ‘W9127S21R0001- Firm Name- Volume I, Technical Submission,’ W9127S21R0001- Firm Name- Volume II, Small Business/Subcontracting Submission’ and ‘W9127S21R0001- Firm Name- Volume III, Price Submission.’

FONT SIZE. Shall not be less than 10 point. Each page shall be identified with the appropriate page number centered at the bottom of the page.

SHEET SIZE. Shall be 8-1/2 inches x 11 inches; however, if drawings, charts, or other graphics are submitted, sheets no larger than 11 inches x 17 inches shall be used. Sheets which are 11 x 17 inch will be counted as two 8-1/2-inch x 11-inch sheets. All sheets shall be dated and numbered.

COVER SHEET & TABLE OF CONTENTS. Proposals shall consist of three (3) volumes. A cover sheet identifying the Offeror (name, address, point of contact) and solicitation number shall be provided. The second sheet shall be a table of contents. The proposal shall contain a detailed table of contents. Offers violating these rules unnecessarily delay the evaluation process and may be rejected by the Government after the initial evaluation without receiving any further consideration. Neither the cover sheet nor the table of contents count toward the page limitations.

BOOKMARKS. Proposals shall be bookmarked and labeled as specified in a manner to afford easy identification from the Table of Contents. Additional bookmarks may be provided but shall be nested under the appropriate tab bookmark.

HYPERLINKS. Hyperlinks are not permitted. This includes hyperlinks within the document, such as Figure or Table references to the page containing content, and hyperlinks to websites.

ATTACHMENTS. Attachments/appendices are not permitted.

PAGE LIMITS. The proposal shall not exceed the specified page limits. The Government will not review any information in excess of the page limits or information submitted in an appendix or attachment to the proposal. The Offeror shall not submit verbatim sections of this solicitation as part of their proposal. Offers not meeting these requirements may be subject to rejection.

SUBMISSION REQUIREMENTS

Offerors shall submit their proposals in accordance with the following:

VOLUME I:

BOOKMARK A— Standard Form 1442 and Proposal Data Sheet (Attachment A). Proposal must include Offeror’s telephone number, FAX number, email address, and DUNS number. DUNS number will be used to access CPARS Data.

BOOKMARK B – Factor 1 – Past Performance

1.1 – Turbine Rehabilitation

1.2 – Generator Rewind BOOKMARK C – Factor 2 – Turbine Rehabilitation Technical Approach BOOKMARK D – Factor 3 – Generator Rewind Technical Approach BOOKMARK E – Factor 4 – Schedule BOOKMARK F – Factor 5 – Quality Control

VOLUME II:

BOOKMARK A — Small Business Participation Plan BOOKMARK B — Subcontracting Plan

VOLUME III:

BOOKMARK A — Price Schedule BOOKMARK B — Offer Guarantee

FACTOR 1 – PAST PERFORMANCE (VOL 1, BOOKMARK B)

SUBMISSION REQUIREMENT: Under each sub-factor, the Offeror shall submit information on projects completed within the past twenty (20) years or currently under contract and more than 50% complete to demonstrate the organization's/team’s recent and relevant experience. Project completion dates shall be submitted as part of package. Information shall be submitted utilizing the template found as Attachment B below.

For each submitted project, the Offeror shall request a Past Performance Questionnaire (PPQ), found as Attachment C below, from those Government agencies or private sector companies’ Point of Contact identified for each project.

These agency or company contacts must have detailed information concerning the performance of the project in order to accurately complete the PPQ for the Offeror. The POCs may be contacted by the SSEB to assess the scope of work performed and to evaluate performance of the projects listed under the previous experience tab of this volume, if necessary; therefore, it is imperative to ensure correct telephone and email addresses are identified for the client POCs on each PPQ. Completed Past Performance Questionnaires shall be submitted with your proposal if they are able to be received from the POC prior to the proposal due date. Offerors shall follow-up with clients/references to ensure timely submittal of questionnaires. If the Offeror’s client requests, he/she may submit the questionnaire directly to the Contract Specialist, Sarah Hagood at Sarah.N.Hagood@usace.army.mil prior to proposal closing date.

PPQs previously completed by the example project's POC may be submitted in lieu of requesting the POC to re-complete the form; however, Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

NOTE: For Department of Defense (DoD) projects, the Offeror need not submit a copy of the Contractor Performance Assessment Reporting System (CPARS) Evaluations (ACASS & CCASS) for each DoD project; instead, provide written notification current ratings are available for the Government to evaluate. CPARS evaluations shall not be submitted by the Offeror in place of a PPQ.

TEAMING ARRANGEMENTS AND JOINT VENTURES (JV). Provide a copy of the teaming/joint venture agreement. Offerors may submit experience of an affiliated entity where the affiliated entity has made a firm commitment to participate meaningfully in the performance of the contract. If required, JV approval must be obtained in accordance with Small Business Administration policy.

EVALUATION CRITERIA: There are two aspects to the Government’s past performance evaluation: relevancy and quality of performance. The Government will first evaluate how relevant the past performance is to the work required by these specifications and then the Government will evaluate how well the Offeror performed on the submitted projects. In doing this, Government will use the relevancy and confidence ratings discussed below.

In addition to the PPQs, the Government may review and consider any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror (including information from Government personnel and databases).

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

The Government intends to assess the relative risks associated with the Offeror’s performance based on the past performance information provided in the proposal and, if applicable, information obtained from available sources identified previously. A significant achievement, unexplained or unresolved problem, or lack of relevant data may significantly impact the risk rating by the Government.

This is the start of the file's text. The full file is on GovTribe.