Industrial High Temperature Heater System
Closed Solicitation Posted
- Solicitation number
- W15QKN25QA025
- Agency
-
ACC Picatinny
Army Contracting Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 333912 Air and Gas Compressor Manufacturing
- PSC
- 3895 Miscellaneous Construction Equipment
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Materiel Command Contracting Command at Picatinny Arsenal is seeking to procure an Industrial High Temperature Heater System for upgrading a supersonic wind tunnel in Building 266. The specific requirement is to acquire a heater element and ancillary equipment to support transitioning the wind tunnel from supersonic to hypersonic capabilities. The heater system must meet precise technical specifications, including the ability to heat compressed air in two distinct operating conditions: heating 1.8 kg/s flow rate to 800F and 3.5 kg/s flow rate to 500F, with inlet air at room temperature and 350 PSI pressure. The solicitation requires electronic proposal submission through the PIEE system by March 10, 2025, at 5:00 PM EST, with proposals evaluated under NAICS code 333912 for Air and Gas Compressor Manufacturing. Potential vendors must demonstrate compliance with detailed technical requirements, including minimal pressure drop, specific pipe dimensions, and a 20-year corrosion-free lifespan.
This procurement is designated as a 100% small business set-aside with a firm-fixed-price purchase order anticipated. The contract requires delivery within 12 months after award, with the heater system needing to be a maximum of 12 feet long by 6 feet wide, utilizing 480V AC power and including remote control capability and safety switches. The system must operate in a non-hazardous indoor environment and meet NEMA 4 requirements. Performance will occur at Picatinny Arsenal in New Jersey, specifically in Building 266, where the supersonic wind tunnel is located. While specific contract value is not explicitly stated, the procurement is part of the Combat Capabilities Development Command - Armaments Center's (DEVCOM-AC) technology enhancement efforts. The solicitation includes standard attachments such as a Contract Data Requirements List (CDRL) and Contract Quality Requirements, indicating a comprehensive and structured procurement process.
Notice text
2 versions
Update #2 · Latest ·
The Combat Capabilities Development Command - Armaments Center (DEVCOM-AC), Munitions Engineering and Technology Center (METC), Fuze and Precision Armaments Directorate (FPAD), Aeroballistics Division has a requirement to upgrade the supersonic wind tunnel in Building 266 Picatinny Arsenal, NJ 07806-5000. The tunnels are used to simulate the actions of an object inflight. This effort is a purchase order to acquire the heater element (and ancillary equipment) to support the upgrade of the supersonic wind tunnel inbuilding 266 from supersonic to hypersonic. The effort is merely to purchase all the hardware necessary for the upgrade. This effort does not include any other activities that needed to be accomplished to achieve hypersonic capability. AMENDMENT 0001 IS FOR A 45-DAY EXTENSION UNTIL 10 MARCH 2025, 5:00 PM EASTERN STANDARD TIME (EST).
Update #1 ·
The Combat Capabilities Development Command - Armaments Center (DEVCOM-AC), Munitions Engineering and Technology Center (METC), Fuze and Precision Armaments Directorate (FPAD), Aeroballistics Division has a requirement to upgrade the supersonic wind tunnel in Building 266 Picatinny Arsenal, NJ 07806-5000. The tunnels are used to simulate the actions of an object inflight. This effort is a purchase order to acquire the heater element (and ancillary equipment) to support the upgrade of the supersonic wind tunnel inbuilding 266 from supersonic to hypersonic. The effort is merely to purchase all the hardware necessary for the upgrade. This effort does not include any other activities that needed to be accomplished to achieve hypersonic capability.
Files
| File | Type | Posted |
|---|---|---|
| Solicitation_Amendment_W15QKN25QA0250003_SF_30.pdf | ||
| Attachment_0006___Solicitation_Questions_and_Answers_2.docx | DOCX document |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Request for Whitepaper-Arc Heater Component Manufacturing and Supply | Air Force Test Center | No set-aside | |
| Heat interchanger, r | Land and Maritime | No set-aside | |
| Heating element, electr | Construction and Equipment | HUBZone |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity