ID BOR SRAO TCROWN(1), Crown Point Trail and Parking Area
Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 69056725R000014
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Not on record
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Cascade, Idaho, United States
- Points of contact
-
- Contracts G. Office wfl.contracts@dot.gov (360) 619-7520
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Highway Administration is procuring trail construction and improvement services for the Crown Point Trail and Parking Area project, located 69 miles north of Boise, Idaho. The project encompasses trail construction, trail resurfacing, slope repair, and paving work across 2.7 miles of trail. This procurement will be conducted as a negotiated task order under the Idaho, Montana, and Surrounding Areas Multiple Award Task Order Contract (MATOC), with proposals limited to seven pre-selected prime contractors: ASCORP INC, Granite Construction, Hamilton Construction, M.A. Deatley Construction, MJ Hughes Construction, Thompson Constructing, and one additional contractor. The contract will be awarded on a firm-fixed-price basis, and solicitation documents are anticipated to be released in early spring 2026, with interested parties advised to monitor SAM.gov and utilize the "Follow" feature for automatic notifications of the Request for Proposals release. Specific evaluation criteria have not been detailed in the pre-solicitation notice, though contractors should review the preliminary plans and project description documents posted with this synopsis.
This procurement carries no set-aside designation and is restricted to the named MATOC contractors only. The estimated contract value ranges between $700,000 and $2,000,000, with a tentative completion date of Fall 2026. The project scope includes resurfacing 2.7 miles of trail, constructing 300 feet of new trail, stabilizing slopes, clearing and grubbing approximately 0.9 acres, excavating 1,150 cubic yards of roadway material, installing asphalt pavement for a parking area, adding accessibility features including a vault toilet, and implementing drainage and erosion control measures. The work involves multiple construction divisions covering earthwork, aggregate and base courses, asphalt pavement, and incidental construction requirements. Potential contractors should begin reviewing the preliminary plans and project description documents now to prepare for the formal solicitation release expected in early spring 2026.
Notice text
2 versions
Update #2 · Latest ·
UPDATE 10/17/2025: QA_10-17-2025.pdf posted to attachments.
PROJECT: ID BOR SRAO TCROWN(1), Crown Point Trail and Parking Area
LOCATION: 69 miles N of Boise, ID
WORK: This project consists of trail construction, trail resurfacing, slope repair, and paving. See “Project Description” for additional details
LENGTH: 2.7 miles
TENTATIVE COMPLETION DATE: Fall 2026
CONTRACT TYPE: Negotiated- Task Order; Firm-Fixed-Price
ESTIMATED PRICE RANGE: Between $700,000 and $2,000,000.
INTERESTED VENDORS LIST: To view the Interested Vendors List,you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, call the Federal Service Desk at 866-606-8220.
NOTICE OF SUBCONTRACTING OPPORTUNITY
This project will be solicited to the Idaho, Montana, and Surrounding Areas MATOC contractors. Contractor Information on the IDIQ contractor may be found on our web site at: Idaho, Montana, and Surrounding Areas IDIQ MATOC | FHWA
This project is anticipated to be solicited early spring 2026.
PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the Request for Proposals (specifications and plans) will be posted at this link.
Update #1 ·
PROJECT: ID BOR SRAO TCROWN(1), Crown Point Trail and Parking Area
LOCATION: 69 miles N of Boise, ID
WORK: This project consists of trail construction, trail resurfacing, slope repair, and paving. See “Project Description” for additional details
LENGTH: 2.7 miles
TENTATIVE COMPLETION DATE: Fall 2026
CONTRACT TYPE: Negotiated- Task Order; Firm-Fixed-Price
ESTIMATED PRICE RANGE: Between $700,000 and $2,000,000.
INTERESTED VENDORS LIST: To view the Interested Vendors List,you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, call the Federal Service Desk at 866-606-8220.
NOTICE OF SUBCONTRACTING OPPORTUNITY
This project will be solicited to the Idaho, Montana, and Surrounding Areas MATOC contractors. Contractor Information on the IDIQ contractor may be found on our web site at: Idaho, Montana, and Surrounding Areas IDIQ MATOC | FHWA
This project is anticipated to be solicited early spring 2026.
PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the Request for Proposals (specifications and plans) will be posted at this link.
Files
| File | Type | Posted |
|---|---|---|
| QA_10-17-2025.pdf | ||
| PROJECT DESCRIPTION_ID BOR SRAO TCROWN(1)_MATOC.pdf | ||
| Prelim_idr-srao-tcrown1_plans.pdf | ||
| Prelim Letter_ID BOR SRAO TCROWN(1).pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| ID BOR SRAO TCROWN(1), Crown Point Trail and Parking Area | Award Notice | |
| ID BOR SRAO TCROWN(1), Crown Point Trail and Parking Area | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1 | Federal Highway Administration | No set-aside | |
| ID FLAP CLEAR 4783(1), Dent Bridge Road Improvements | Federal Highway Administration | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity