This document is a detailed description of work for the Crown Point Trail and Parking Area project in Valley County, Idaho. The project involves creating a 2.7-mile trail with a firm and stable surface, expanding and paving an existing trailhead, formalizing a beach access trail, repairing slope erosion, and adding a vault toilet to meet Architectural Barriers Act requirements. The estimated price range is $700,000-$2,000,000, with a tentative fixed completion date of Fall 2026, located 69 miles north of Boise.

The project scope includes multiple construction divisions covering project requirements, earthwork, slope reinforcement, aggregate and base courses, asphalt pavements, and incidental construction. Key activities involve clearing and grubbing 0.9 acres, excavation of 1,150 cubic yards of roadway and 300 cubic yards of rock, special rock embankment, aggregate surface course, asphalt concrete pavement, installation of drainage chutes, traffic control measures, and roadside development including two kiosks and a vault toilet. The work will require construction survey, quality control, soil erosion control, and various infrastructure improvements to enhance trail accessibility and functionality.

View the file

Other files

File Type Posted
QA_10-17-2025.pdf PDF
Prelim Letter_ID BOR SRAO TCROWN(1).pdf PDF
Prelim_idr-srao-tcrown1_plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ID BOR SRAO TCROWN(1), Crown Point Trail and Parking Area

Valley County, Idaho

This work consists of creating a “firm and stable” trail surface for 2.7 miles, expanding and paving the existing trailhead, formalizing a beach access trail, repairing a slope erosion issue, adding a vault toilet and in general modifying the trail as needed to meet the requirements of the Architectural Barriers Act.

Project length: 2.7 miles

Tentative Fixed Completion Date: Fall 2026

(Once solicitation is issued, see SF 1442, Block 11)

Estimated Price Range: $700,000-$2,000,000

Location: 69 miles N of Boise, ID

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

O n e S ch ed u le

DIVISION 150 – Project Requirements

152 Construction Survey & Staking (yes/no) Yes

153 Contractor Quality Control and Assurance (yes/no) Yes

154 Contractor Sampling & Testing (yes/no) Yes

155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes

157 Soil Erosion & Sediment Control (erosion control devices) Silt Fence Earth Berms Fiber Roll Check Dam

3,000 LNFT

20 LNFT

50 LNFT

7 EACH

158 Watering for Dust Control LPSM

DIVISION 200 – Earthwork

201 Clearing & Grubbing 0.9 ACRE e S ch ed

203 Removal of Structures & Obstructions (structures, demolition) Removal of Bench Removal of Gate Removal of Sign

2 EACH

2 EACH

1 EACH

204 Excavation & Embankment Roadway Excavation Rock Excavation

1150 CUYD

300 CUYD

DIVISION 250 – Slope Reinforcement and Retaining Walls

252 Rockery, Special Rock Embankment, and Rock Buttress Special Rock Embankment, Mechanically- Placed 450 CUYD

DIVISION 300 – Aggregate and Base Courses

302 Minor Crushed Aggregate Roadway Aggregate, Method 2 180 CUYD

303 Roadway Reconditioning 2.8 MILE

311 Stabilized Aggregate Surface Course, Imported Aggregate 1,230 TON

DIVISION 400 – Asphalt Pavements & Surface Treatments

403 Asphalt Concrete Pavement, Type 1 75 TON

DIVISION 600 – Incidental Construction

608 Paved Waterways (culverts & drains) Drainage Chutes 15 LNFT

609 Curb & Gutter (concrete – minor structures) (indicate which) Wheelstop, Concrete 7 EACH

619 Fences, Gates, Cattle Guards & Bollard Posts Gate, Metal Remove and Reset Fence

2 EACH

55 LNFT

622 Rental Equipment (yes/no) Yes e S ch ed

623 General Labor (yes/no) Yes

624 Topsoil Placing Conserved Topsoil 95 CUYD

625 Turf Establishment 910 SQYD

633 Permanent Traffic Control (traffic control devices) Sign System Remove and Reset Sign

2 EACH

2 EACH

634 Permanent Pavement Markings (traffic pavement markings) Pavement Markings, Type B, Solid (White) Pavement Markings, Type B, Accessibility Symbol

400 LNFT

1 EACH

635 Temporary Traffic Control LPSM

646 Roadside Development (use pay item description) Fixture, Kiosk Fixture, Kiosk Fixture, Vault Toilet

2 EACH

1 EACH

1 EACH