Hurricane Maria Communications Facility and Contingency Response Facility Muñiz Air National Guard Base, Isla Verde, Puerto Rico
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- N69450-21-R-0004
- Agency
-
Naval Facilities Engineering Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- PRI
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Navy Naval Facilities Engineering Command seeks to award a firm-fixed price design-build contract to construct a communications facility and contingency response facility at Muniz Air National Guard Base in Puerto Rico. The facilities must be designed and built according to DoD unified facilities criteria using conventional construction methods and incorporating local materials where cost-effective. Offerors must demonstrate the capability to self-perform at least 20% of the work. Proposals are due by January 27, 2021 and will be evaluated based on technical qualifications, past performance, and price. The anticipated award date is the fourth quarter of fiscal year 2021.
The North American Industry Classification System code is 236220 for commercial and institutional building construction with an annual size standard of $39.5 million. The total project magnitude is between $25 million and $100 million. There is no set-aside designation. The facilities must be constructed at Muniz Air National Guard Base in Isla Verde, Puerto Rico by the fourth quarter of 2022. Prime contractors must commit to subcontracting goals for small businesses including small disadvantaged, women-owned, HUBZone, veteran-owned and service-disabled veteran-owned small businesses.
Notice text
1. Construct a Communications Facility utilizing conventional design and construction methods to accommodate the mission of the facility. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1- 200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The facility should be compatible with applicable DoD, Air Force, and base design standards. In addition, local materials and construction techniques shall be used where cost effective. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria. Special Construction Requirements: Reinforced concrete foundation, relocate communications switch, standby power generator.
2. Construct a Contingency Response and deployment processing facility with associated administrative, shop, and high-bay warehouse utilizing conventional design and construction methods to accommodate the mission of the facility. Facility will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The facility should be compatible with applicable DoD, Air Force, and base design standards. In addition, local materials and construction techniques shall be used where cost effective. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria. Special Construction Requirements: The base has moderate soil conditions and a high underground water table. The proposed building site requires reinforced foundations, drainage improvements, pavements and utilities upgrades. Any resultant contract will be firm-fixed price. The North American Industry Classification System (NAICS) Code is 236220 – Commercial and Institutional Building Construction with the annual size standard of $39.5 million. Project Magnitude is between $25,000,000 and $100,000,000.
Under the FAR guidelines, the prime contractor must have the capability to perform at least 20 percent of the contract work with its own employees. The anticipated award date is 4th Quarter FY 2021.
Files
| File | Type | Posted |
|---|---|---|
| Exhibit B Safety Data Sheet Revised.docx | DOCX document | |
| N69450-21-R-0004 0001.pdf | ||
| Exhibit D Attachment E ProjNet How To Guide.pdf | ||
| Exhibit B Safety Data Sheet.docx | DOCX document | |
| Exhibit A Construction and Design Experience Project Data Sheet.docx | DOCX document | |
| Exhibit E Historical SB Utilization.docx | DOCX document | |
| Exhibit F SB Participation Commitment Doc.docx | DOCX document | |
| Exhibit C Past Performance Questionnaire.docx | DOCX document | |
| N69450-21-R-0004.pdf | ||
| Exhibit H Small Business Subcontracting Plan.doc | DOC document |
Notice history
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| DOWEA Preventative Maintenance Demand Maintenance- Puerto Rico IDIQ | ENDIST Norfolk | Total Small Business | |
| General Contractor for the Seismic Retrofit Project at the Clemente Ruiz Nazario U.S. Courthouse, San Juan, Puerto Rico | — | No set-aside | |
| Replacement of 10 Ton HVAC Unit, Bldg. 11, PR ANG | Army National Guard | Total Small Business | |
| Design-Build Repair Storm Sewer Lines at U. S. Coast Guard Base San Juan, Puerto Rico Project Number: PN 15852459 | — | Service-Disabled Veteran-Owned Small Business | |
| Major maintenance and repair UPH building 127 U.S. Coast guard base SAN juan, PR | — | No set-aside |