About this opportunity

The U.S. Army Corps of Engineers Mobile District is seeking a contractor to perform comprehensive restoration work on Monolith R14 at the Holt Lock facility in Tuscaloosa, Alabama. The project requires the selected contractor to provide all necessary labor, materials, and equipment to execute a complex repair strategy involving multiple technical interventions. These interventions include horizontal drilling, installing horizontal post-tension anchor bars, internal pressure grouting, epoxy injection of surface cracks, water stop installation, underwater concrete placement, and lock chamber dewatering. The solicitation (ID: 76e7b5a6edcc48cabb73e055881f5253) was posted on April 24, 2025, with proposal responses due by June 10, 2025. While specific evaluation criteria are not explicitly detailed in the provided documentation, the technical complexity and specialized nature of the work suggest that contractors will be assessed on their engineering capabilities, technical expertise, and proven experience in similar infrastructure restoration projects.

The contract opportunity is not designated with a specific set-aside status, indicating it is open to all qualified contractors. The project is categorized under NAICS code 237990 for Other Heavy and Civil Engineering Construction and PSC code Y1KA for Construction of Dams. Based on the site visit sign-in sheet, potential contractors include organizations such as Coastal Drilling East, Pyramid Concrete Pumping, Ballard Marine Construction, and C.J. Mahan. The place of performance is specified as Tuscaloosa, Alabama 35406, with work to be conducted at the Holt Lock on the Black Warrior River. While no specific budget range is provided in the documentation, the technical complexity and multiple restoration techniques suggest this is a significant infrastructure project requiring substantial technical and financial resources. The project appears to be part of a broader infrastructure maintenance and restoration effort by the Department of the Army Corps of Engineers.

Notice text

4 versions

Update #4 · Latest ·

The objective of this project is for the Contractor to provide all labor, materials, and equipment necessary to repair monolith R14 in accordance with the plans and specifications. Work includes but not limited to horizontal drilling, installing horizontal post tension anchor bars, internal pressure grouting, epoxy injection of surface cracks, installing water stops, underwater concrete placement, and dewatering the lock chamber at Holt Lock. Amendment 0001 is posted 16 May 2025 to update the Table of Contents, Bid Schedule, Explanation of Bid Schedule, and several sections within the specifications as well as drawings. The response date has been extended to 4 June 2025. Amendment 0002 posted 2 June 2025 updates the Bid Scheule, Bid Schedule Notes, Explanation of the Bid Scheudle, Section 01 00 00, Section 13 51 00.10, Section 31 68 13, and extends the response date to 10 June 2025.

Update #3 ·

The objective of this project is for the Contractor to provide all labor, materials, and equipment necessary to repair monolith R14 in accordance with the plans and specifications. Work includes but not limited to horizontal drilling, installing horizontal post tension anchor bars, internal pressure grouting, epoxy injection of surface cracks, installing water stops, underwater concrete placement, and dewatering the lock chamber at Holt Lock. Amendment 0001 is posted 16 May 2025 to update the Table of Contents, Bid Schedule, Explanation of Bid Schedule, and several sections within the specifications as well as drawings. The response date has been extended to 4 June 2025.

Update #2 ·

The objective of this project is for the Contractor to provide all labor, materials, and equipment necessary to repair monolith R14 in accordance with the plans and specifications. Work includes but not limited to horizontal drilling, installing horizontal post tension anchor bars, internal pressure grouting, epoxy injection of surface cracks, installing water stops, underwater concrete placement, and dewatering the lock chamber at Holt Lock.

Update #1 ·

The objective of this project is for the Contractor to provide all labor, materials, and equipment necessary to repair monolith R14 in accordance with the plans and specifications. Work includes but not limited to horizontal drilling, installing horizontal post tension anchor bars, internal pressure grouting, epoxy injection of surface cracks, installing water stops, underwater concrete placement, and dewatering the lock chamber at Holt Lock.

Files

File Type Posted
W9127825RA015_AM02.pdf PDF
W9127825RA015_AM02_DRAWINGS.pdf PDF
W9127825RA015_Site Visit Attendees.pdf PDF

Notice history

Notice Type Posted
Holt Lock Monolith R14 Restoration Award Award Notice
This notice Latest solicitation Solicitation
Design-Bid-Build Holt Lock Monolith R14 Restoration Special Notice
Design-Bid-Build Holt Lock Monolith R14 Restoration Industry Day Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Black Warrior, Tombigbee, Alabama, Coosa Rivers Project Management Office Tuscaloosa, Alabama, Tuscaloosa County 35404 · NAICS 236220 ENDIST Mobile No set-aside
Solicitation - BWT Operation and Maintenance Black Warrior-Tombigbee, Tuscaloosa, Alabama 101 21st Avenue, Tuscaloosa, AL 35401 35401 · NAICS 561210 ENDIST Mobile Total Small Business