W9127825RA015_AM02_DRAWINGS.pdf
PDF 4 MB Posted
- Attached to
- Holt Lock Monolith R14 Restoration
- Solicitation number
- W9127825RA015
About this file
These are engineering design drawings for the Holt Lock Monolith R14 Restoration project, prepared by the US Army Corps of Engineers Mobile District. The comprehensive set of technical drawings details a significant restoration effort for Monolith 14R at the Holt Lock and Dam facility in Mobile, Alabama. The project involves extensive concrete repair, including drilling core holes, installing post-tension anchors, pressure grouting, installing water stops, and constructing a new toe block, with work to be performed both underwater and in a dewatered lock chamber.
Key technical specifications include installing multiple rows of anchors at various elevations (ranging from approximately 127.00' to 175.50'), repairing surface and culvert cracks through epoxy and cement grouting, and constructing a new concrete toe block with specific reinforcement requirements. The project requires precise engineering interventions, including horizontal drilling, anchor installation, concrete placement, and careful monitoring of thermal effects during construction. The drawings provide detailed guidance on anchor types, concrete mix designs, placement methods, and structural reinforcement, with specific notes on construction techniques, material specifications, and quality control measures.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W9127825RA015_AM02.pdf | ||
| W9127825RA015_Site Visit Attendees.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
US Army Corps of Engineers ®
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P R
O J E
C T
N O
F
IL
E N
A M
E
G-001
C O
V E
R S
H E
E T
H O
L T
L O
C K
A N
D D
A M
M O
B
IL
E D
IS
T
R
IC
T M
O B
IL
E
A
L A
B A
M A
R Z
U E
L Z
K E
T S
A N
D
IF
E R
E V
IN
C
E N
T
A J U
S T
IC
E
M A
Y
A M
E N
D M
E N
T
H O
L T
L O
C K
M O
N O
L
IT
H R
R
E S
T O
R A
T
IO
N
MOBILE DISTRICT
MAY 2025
HOLT LOCK AND DAM
HOLT LOCK MONOLITH R14 RESTORATION
CHC24010
AMENDMENT 0002
C H
C
S T
R C
R e v it P ro je c t
T e m p la te C
E S
A M
.r v t
SHEET INDEX
SHEET
NUMBER
SHEET TITLE
REFERENCE
SHEET
NUMBER
G-001 COVER SHEET
G-002 GENERAL NOTES, ABBREVIATIONS
G-003
GENERAL SITE PLAN & CONTRACTOR'S WORK
LIMITS
G-004 CONCRETE ORIGINAL DESIGN STRENGTH ZONES
C-001 LOCATION AND VICINITY MAP
C-002 PROJECT ABBREVIATIONS SHEET
C-003 PROJECT LEGEND
C-004 GENERAL PROJECT NOTES SHEET
C-005 GENERAL OVERVIEW PLAN
V-101 EXISTING CONDITIONS
V-102 PICES SURVEY
CS101 SITE PLAN
CS102 ENLARGED SITE PLAN
S-100 OVERALL PLAN VIEW
S-101 CONSTRUCTION WORK BARGE LIMITS PLAN
S-102 WORK VESSEL MOORING LAYOUT PLAN
S-103 DEWATERING PLAN
S-105 ENLARGED PLAN
S-110 14R CRACK LOCATION PLANS
S-112 14R CRACK LOCATION SECTIONS
S-113 14R CULVERT CRACK LOCATIONS
S-130 MONOLITH FACE ANCHOR LAYOUT
S-131 ANCHOR LOCATION ELEVATION
S-132 MONOLITH SECTIONS
S-140 14R PROPOSED ANCHOR LOCATION PLANS
S-141 14R PROPOSED ANCHOR LOCATION PLANS
S-142 14R PROPOSED ANCHOR LOCATION PLANS
S-143 14R PROPOSED ANCHOR LOCATION PLANS
S-144 14R PROPOSED ANCHOR LOCATION SECTIONS
S-145 14R PROPOSED ANCHOR LOCATION SECTIONS
S-146 14R PROPOSED ANCHOR LOCATION SECTIONS
S-147 14R PROPOSED ANCHOR LOCATION SECTIONS
S-148 14R PROPOSED ANCHOR LOCATION SECTIONS
S-149 14R PROPOSED ANCHOR LOCATION SECTIONS
S-150 14R FMB ANCHOR DETAILS
S-160 WATERSTOP PLAN
S-401 TYPICAL ANCHOR DETAILS
S-402 TOE BLOCK DETAILS
S-403 TYPICAL TOE BLOCK ANCHOR DETAILS
S-501 TOE BLOCK ANCHOR END DETAILS
S-901 UPPER GATE AREA PLAN 10/4
S-902 UPPER GATE AREA SECTIONS 10/5
S-903 CHAMBER AREA PLAN 10/6
S-904 CHAMBER AREA SECTIONS 10/7
S-905 LOWER GATE AREA PLAN 10/8
S-906 LOWER GATE AREA SECTIONS 10/9
S-907 GALLERY 10/15
S-908 GALLERY REINFORCEMENT 10/16
S-909 WALL CULVERTS 10/17
S-910 WALL CULVERTS REINFORCEMENT 10/18
S-911 MISCELLANEOUS REINFORCEMENT 10/19
S-912 LOCK BOTTOM LATERALS 10/20
S-913 TAINTER VALVE RECESSES 10/28
S-914 PARAPET WALL 10/45
S-915 FLOATING MOORING BIT RECESSES 10/48
S-916 CONTROL STATION FOUNDATION 10/49
S-917 CONTROL STATION BASEMENT 10/50
S-918 CONTROL STATION REINFORCEMENT 10/51
S-919
UNWATERING PUMP RECESS AND
MISCELLANEOUS CONCRETE DETAILS
10/54
S-920 WATER STOP DETAILS 10/55
S-921 FOUNDATION GROUTING 10/59
S-922 CONCRETE LIFT DETAILS 10/67
S-923 WALL ARMOR 14R 10/96
S-924 WALL ARMOR DETAILS 10/98
S-925 RECESS GRATING 10/110
S-926 TAINTER VALVE GENERAL DRAWING 13/1
S-927 TAINTER VALVE SECTIONS 13/2
S-928 TAINTER VALVE TRUNNION CONNECTION 13/3
S-929 TAINTER VALVE ANCHORAGE DETAILS 13/4
S-930 CULVERT BULKHEAD DETAILS 13/8
S-931 CULVERT BULKHEAD DETAILS 13/9
S-932 TAINTER VALVE DETAILS 14/1
S-933 TAINTER VALVE DETAILS 14/2
S-934 TAINTER VALVE DETAILS 14/3
S-935 TAINTER VALVE DETAILS 14/4
S-936 TAINTER VALVE DETAILS 14/5
S-937 TAINTER VALVE DETAILS 14/6
S-938 TAINTER VALVE DETAILS 14/7
S-939 TAINTER VALVE DETAILS 14/8
S-940 TAINTER VALVE DETAILS 14/9
S-941 TAINTER VALVE DETAILS 14/10
S-942 STOPLOG AND BULKHEAD HANDLING 15/6
S-943 CULVERT BULKHEAD HANDLING 15/7
S-944 CULVERT BULKHEAD HOIST ASSEMBLY 15/8
S-945 LOCK PIPING 19/6
S-946 REGULAR STOPLOGS - GENERAL DRAWING S-1
S-947 REGULAR STOPLOGS - DETAILS S-2
S-948 REGULAR STOPLOGS - DETAILS S-3
S-949 REGULAR STOPLOGS - DETAILS S-4
S-950 SPECIAL STOPLOGS - GENERAL DRAWING S-5
S-951 SPECIAL STOPLOGS - DETAILS S-6
S-952 SPECIAL STOPLOGS - DETAILS S-7
S-953 STOPLOGS - PICKUP BEAM DETAILS S-8
S-954 STOPLOGS - PICKUP BEAM DETAILS S-9
S-955 STOPLOGS - PICKUP BEAM DETAILS S-10
S-956 STOPLOGS - PICKUP BEAM DETAILS S-11
S-957 RIVERSIDE INTAKE BULKHEAD DETAILS S-0
S-958 RIVERSIDE INTAKE BULKHEAD DETAILS S-1
S-959 RIVERSIDE INTAKE BULKHEAD DETAILS S-2
S-960 RIVERSIDE INTAKE BULKHEAD DETAILS S-2A
S-961 RIVERSIDE INTAKE BULKHEAD DETAILS S-3
S-962 RIVERSIDE INTAKE BULKHEAD DETAILS S-4
S-963 RIVERSIDE INTAKE BULKHEAD DETAILS S-5
S-964 RIVERSIDE INTAKE BULKHEAD DETAILS S-6
S-965 RIVERSIDE INTAKE BULKHEAD DETAILS S-7
HOLT LOCK AND DAM
GENERAL SCOPE OF WORK - INCLUDES BUT IS NOT LIMITED TO:
BASE CONTRACT
1. PROVIDE A TEMPORARY OFFICE SPACE AND SET UP CONTRACTOR
WORK/STAGING AREA AS INDICATED ON CIVIL/SITE DRAWINGS.
2. PROVIDE CONTRACTORS INSTRUMENTATION MONITORING PLAN
FOR MONOLITH 14R.
3. IMPLEMENT MONITORING PLAN.
4. LOCALLY DEWATER UPPER RIVER SIDE CULVERT VALVE FOR CULVERT ACCESS.
5. DRILL CORE HOLES AT ANCHOR LOCATIONS AND INSPECT EACH
CORE TO DETERMINE DEPTH TO CRACK. INSPECT EACH CORE
WITH A DOWN-HOLE CAMERA TO OBSERVE CRACK LOCATION AND
CONDITIONS.
6. INSTALL, POST-TENSION, AND PRESSURE GROUT
ANCHORS ABOVE LOWER POOL ELEVATION IN MONOLITH 14R AS
INDICATED IN DRAWINGS.
7. LOAD TEST ANCHORS
8. EXCAVATE DEBRIS AND DREDGE SILT/SEDIMENTATION FROM LOCK
CHAMBER FLOOR IN FRONT OF MONOLITH 14R.
9. INSTALL GRAVEL, FORMWORK, REINFORCING, AND TREMIE CONCRETE
PLACEMENTS AS SHOWN ON THE DRAWINGS FOR THE TOE BLOCK.
10. INSTALL LOCK STOPLOGS AND DEWATER LOCK CHAMBER.
11. PUMP OUT ANY REMAINING WATER ON LOCK CHAMBER FLOOR IN
WORK AREA.
12. REMOVE TOE BLOCK FORMWORK.
13. INSTALL AND POST-TENSION BASE ANCHORS INTO TOE BLOCK.
14. LOAD TEST TOE BLOCK ANCHORS.
15. INJECT GROUT INTO SURFACE CRACKS AND CULVERT CRACKS.
16. INSTALL ANCHOR CAPS AND GROUT ANCHOR RECESSES.
17. REPAIR METAL WALL ARMORING WHERE DAMAGED DURING CORING.
18. DURING LOCK CHAMBER DEWATERING, CONTRACTOR TO PROVIDE SUPPORT
FOR USACE ENGINEERING CULVERT INSPECTIONS.
19. REMOVE LOCK STOPLOGS AND REWATER LOCK CHAMBER.
20. INSTALL WATER STOP AS INDICATED IN THE DRAWINGS.
21. AFTER CONSTRUCTION IS COMPLETE AND THE LOCK CHAMBER IS
FILLED TO UPPER POOL, REMOVE AND STORE TEMPORARY CULVERT
INTAKE BULKHEAD. BULKHEAD TO BE SET ON A GOVERNMENT BARGE.
22. REMOVE TEMPORARY OFFICE SPACE AND RESTORE SITE TO
ORIGINAL CONDITION.
BID OPTION
1. REMOVE RIVERSIDE CULVERT FILLING VALVE FOR CULVERT ACCESS.
SET VALVE ON GOVERNMENT BARGE.
THIS PROJECT WAS DESIGNED BY THE MOBILE
DISTRICT AND LOUISVILLE DISTRICT OF THE
U.S. ARMY CORPS OF ENGINEERS IN COORDINATION
WITH THE INLAND NAVIGATION DESIGN CENTER. THE
INITIALS OR SIGNATURES AND REGISTRATION
DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE
PROJECT DOCUMENTS WITHIN THE SCOPE OF THEIR
EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.
APPROVED BY:
DIRECTOR, INDC
APPROVAL RECOMMENDED BY:
CHIEF, ENGINEERING DIVISION
SUBMITTED BY:
TECHNICAL LEAD
A
M E
N D
M E
N T
/1
/2
A
M E
N D
M E
N T
/3
/2
SECTION TAKEN THROUGH CONCRETE MATERIAL
SECTION TAKEN THROUGH GROUT MATERIAL
SECTION TAKEN THROUGH STEEL MATERIAL
SECTION TAKEN THROUGH REINFORCEMENT
CONCRETE DEMOLITION AREA
CONCRETE REPAIR AREA
GENERAL HATCH PATTERN LEGEND
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P R
O J E
C T
N O
F
IL
E N
A M
E
G-002
G E
N E
R A
L N
O T
E S
A
B B
R E
V
IA
T
IO
N S
H O
L T
L O
C K
A N
D D
A M
M O
B
IL
E D
IS
T
R
IC
T M
O B
IL
E
A
L A
B A
M A
R Z
U E
L Z
K E
T S
A N
D
IF
E R
E V
IN
C
E N
T
A J U
S T
IC
E
M A
Y
A M
E N
D M
E N
T
H O
L T
L O
C K
M O
N O
L
IT
H R
R
E S
T O
R A
T
IO
N
C H
C
S T
R C
R e v it P ro je c t
T e m p la te C
E S
A M
.r v t
GENERAL STRUCTURAL NOTES
1. GENERAL NOTES SHALL APPLY UNLESS NOTED OTHERWISE IN THE CONTRACT
DOCUMENTS, INCLUDING PLANS, SPECS OR DETAILS. USE TYPICAL DETAILS WHERE
APPLICABLE.
2. THE CONTRACTOR MUST REPLACE, AT THEIR OWN EXPENSE, ANY ITEM NOT
SPECIFICALLY INDICATED FOR REMOVAL THAT IS DAMAGED OR DESTROYED BY
THEIR OPERATIONS.
3. DO NOT SCALE THE DRAWINGS.
4. CONTRACTOR IS RESPONSIBLE TO VERIFY ALL DIMENSIONS AND LOCATE UTILITY
CONDUITS AND REINFORCING IN THE FIELD PRIOR TO CONSTRUCTION. REFER TO
AS-BUILTS. REPORT DISCREPANCIES TO THE CONTRACTING OFFICER PRIOR TO
BEGINNING WORK IN AREAS THAT WILL BE AFFECTED.
5. DETAILS NOT SPECIFICALLY INDICATED SHALL BE SIMILAR TO DETAILS SHOWN FOR
SIMILAR CONDITIONS.
6. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE SAFETY OF PERSONS
AND PROPERTY DURING CONSTRUCTION.
7. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR MEANS AND METHODS TO
CONSTRUCT THE STRUCTURE, INCLUDING, BUT NOT LIMITED TO, VERIFICATION OF
LOAD CAPACITY OF THE STRUCTURE, NEW OR EXISTING, TO SUPPORT
CONSTRUCTION ACTIVITIES, EQUIPMENT, ETC. AND LIMITING THE AMOUNT OF
CONSTRUCTION LOAD IMPOSED ON THE STRUCTURAL SYSTEM, EXCEPT AS
OTHERWISE NOTED IN THE CONTRACT DOCUMENTS. CONSTRUCTION LOADS SHALL
NOT EXCEED THE DESIGN CAPACITY OF THE STRUCTURE AT THE TIME THE LOADS
ARE IMPOSED. DAMAGE TO THE STRUCTURE CAUSED BY CONSTRUCTION
ACTIVITIES SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST
TO THE GOVERNMENT.
8. REPRODUCTION OF CONTRACT DRAWINGS SHALL NOT BE USED AS SHOP
DRAWINGS. SHOP DRAWINGS SHALL BE CHECKED, APPROVED, AND STAMPED BY A
PROFESSIONAL ENGINEER PRIOR TO SUBMISSION.
9. USE MOST RECENT VERSION OF REFERENCED AMERICAN SOCIETY FOR TESTING
AND MATERIALS (ASTM) STANDARD UNLESS SPECIFIED OTHERWISE IN THE
REFERENCED UFC, IBC, OR OTHER REFERENCED REQUIREMENT/SPECIFICATIONS.
10. VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO CONSTRUCTION. REPORT
DISCREPANCIES IN DIMENSIONS BETWEEN DIFFERENT DRAWINGS TO THE
CONTRACTING OFFICER PRIOR TO BEGINNING WORK IN AREAS THAT WILL BE
AFFECTED.
11. UNLESS NOTED OTHERWISE, CALLOUTS FOR TENDON, ANCHOR, AND BAR ALL
REFERENCE COLD-JOINT ANCHORS AND THE RELATED HARDWARE DESCRIBED ON
SHEET S-501.
12. GOVERNING CODES:
EM 1110-2-2104 STRENGTH DESIGN FOR REINFORCED CONCRETE HYDRAULIC
STRUCTURES
AISC MANUAL OF STEEL CONSTRUCTION, FIFTEENTH EDITION
ACI 318-19 "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE
AND COMMENTARY"
AWS D1.1 STRUCTURAL WELDING CODE
EM 385-1-1, SAFETY AND HEALTH REQUIREMENTS MANUAL
PTI TAB.1-06: POST-TENSIONING MANUAL, SIXTH EDITION
DEMOLITION
1. CONTROL DUST RESULTING FROM DEMOLITION TO PREVENT THE SPREAD OF
DUST AND AVOID CREATION OF A NUISANCE IN THE SURROUNDING AREA. DO
NOT USE WATER WHEN IT WILL RESULT IN, OR CREATE, HAZARDOUS OR
OBJECTIONABLE CONDITIONS SUCH AS ICE, FLOODING, OR POLLUTION.
2. UNDAMAGED REINFORCEMENT IS TO BE PROTECTED. REINFORCEMENT
EXPOSED BEFORE CONSTRUCTION ACTIVITIES IS TO BE CLEANED BY AIR
BLASTING. REINFORCEMENT EXPOSED DURING CONSTRUCTION IS TO BE
COATED WITH A RUST INHIBITOR.
ABBREVIATIONS
APPROX = APPROXIMATELY
B/ = BOTTOM
CL = CENTERLINE
CONC = CONCRETE
COR = CONTRACTING OFFICER'S REPRESENTATIVE
CORR = CORROSIVE
CLR = CLEAR
HORZ = HORIZONTAL
ELEV = ELEVATION
EXIST = EXISTING
HP =HIGH POINT
ICC =INTERNATIONAL CODE COUNCIL
LLH = LONG LEG HORIZONTAL
OAL = OVERALL LENGTH
OC = ON CENTER
OPNG = OPENING
PL = PLATE
PLCS = PLACES
SIM =SIMILAR
SPA = SPACING
T/ = TOP
TYP = TYPICAL
VERT = VERTICAL
W/ = WITH
CONCRETE GENERAL NOTES
1. ALL REPLACEMENT CONCRETE UNDER THIS CONTRACT SHALL BE
CONSIDERED STRUCTURAL CONCRETE.
2. STRUCTURAL CONCRETE DESIGN AND CONSTRUCTION SHALL CONFORM WITH
THE AMERICAN CONCRETE INSTITUTE (ACI) 2019 "BUILDING CODE
REQUIREMENTS FOR STRUCTURAL CONCRETE" (ACI 318), 2020
"SPECIFICATIONS FOR CONCRETE CONSTRUCTION" (ACI 301), AND 2020 "ACI
DETAILING MANUAL" - MNL-66(20), EXCEPT AS OTHERWISE REQUIRED BY THE
US ARMY CORPS OF ENGINEERS ENGINEERING MANUAL (USACE EM)
1110-2-2104 "STRENGTH DESIGN FOR REINFORCED CONCRETE HYDRAULIC
STRUCTURES".
3. CONCRETE SHALL HAVE THE MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS:
4000 PSI WITH A MAXIMUM WATER/CEMENT RATIO = 0.45 AND WITH AN
ENTRAINED AIR ADMIXTURE CONFORMING WITH ASTM C260 FOR ALL
CONCRETE PERMANENTLY EXPOSED TO THE WEATHER. THE AMOUNT OF
ENTRAINED AIR SHALL BE 6% +/- 1%.
4. CALCIUM CHLORIDE SHALL NOT BE PERMITTED NOR SHALL ANY ADMIXTURE
CONTAINING CALCIUM CHLORIDE BE PERMITTED.
5. PROPORTION AND DESIGN CONCRETE MIXES TO RESULT IN A CONCRETE
SLUMP AT POINT OF PLACEMENT AS INDICATED IN 03 30 53 CAST-IN-PLACE
CONCRETE.
6. ALL CONCRETE SHALL CONTAIN A WATER REDUCING ADMIXTURE
CONFORMING TO ASTM C494, TYPE A, F OR G.
7. CONCRETE SHALL BE DISCHARGED AT THE SITE WITHIN 1.5 HOURS AFTER
WATER HAS BEEN ADDED TO THE CEMENT AND AGGREGATES. ADDITION OF
WATER TO THE MIX AT THE PROJECT SITE WILL NOT BE ALLOWED. ALL WATER
MUST BE ADDED AT THE BATCH PLANT.
8. STRUCTURAL CONCRETE DENSITY SHALL BE NORMALWEIGHT UNLESS NOTED
OTHERWISE.
9. PROVIDE SUPPORTS FOR REINFORCEMENT AND EMBEDMENTS AS NEEDED.
10. PROVIDE 1" CHAMFER AT EXPOSED CONCRETE EDGES OR WHERE CHAMFER
IS INDICATED.
11. HOT WEATHER CONCRETE PLACING PER SPEC SECTION 03 30 53
12. SPECIAL WEATHER PROTECTION MEASURES PER SPEC SECTION 03 30 53
13. CONCRETE FIELD QUALITY CONTROL:
A. TESTING REQUIREMENTS AND REPORTING PER SPEC 03 30 53.
B. CYLINDER TESTING PER SPEC 03 30 53.
CONTRACTOR ACCESS
1. CONTRACTOR ACCESS VIA LAND WILL BE AT THE MAIN GATE.
2. CONTRACTOR WILL HAVE ACCESS TO A PUBLIC BOAT RAMP APPROXIMATELY HALF A
MILE UPSTREAM OF THE WORKSITE.
CONSTRUCTION JOINT PREPARATION
1. CONCRETE SURFACES TO WHICH OTHER CONCRETE IS TO BE BONDED SHALL
BE PREPARED FOR RECEIVING THE NEXT LIFT OR ADJACENT CONCRETE BY
CLEANING BY SANDBLASTING, HIGH-PRESSURE WATER JET, OR AIR-WATER
CUTTING. SURFACE CUTTING BY AIR-WATER JETS WILL NOT BE PERMITTED FOR
CONCRETE SURFACES CONGESTED WITH REINFORCING STEEL OR IF THEY ARE
RELATIVELY INACCESSIBLE. IF, FOR ANY OTHER REASON, IT IS CONSIDERED
UNDESIRABLE TO DISTURB THE SURFACE OF A LIFT BEFORE IT HAS HARDENED,
THE USE OF SANDBLASTING OR HIGH-PRESSURE WATER JET AFTER
HARDENING WILL BE REQUIRED. REGARDLESS OF THE METHOD USED, THE
RESULTING SURFACE SHALL BE FREE FROM ALL LAITANCE AND INFERIOR
CONCRETE SO THAT CLEAN, WELL-BONDED COARSE AGGREGATE PARTICLES
ARE EXPOSED UNIFORMLY OVER THE LIFT SURFACE.
2. TREATMENT METHOD SHALL BE SUCH THAT THE EDGES OF THE LARGER
PARTICLES OF AGGREGATE ARE NOT UNDERCUT. WHERE JOINT PREPARATION
OCCURS MORE THAN 2 DAYS PRIOR TO PLACING THE NEXT LIFT OR WHERE THE
WORK IN THE AREA SUBSEQUENT TO THE JOINT PREPARATION CAUSES DIRT
OR DEBRIS TO BE DEPOSITED ON THE SURFACE, THE SURFACE SHALL BE
CLEANED AS THE LAST OPERATION PRIOR TO PLACING THE NEXT LIFT. THE
SURFACE OF THE CONSTRUCTION JOINT SHALL BE KEPT CONTINUOUSLY WET
FOR THE FIRST 12 HOURS OF THE 24 HOURS PRIOR TO PLACING CONCRETE,
EXCEPT THAT THE SURFACE SHALL BE DAMP WITH NO FREE WATER AT THE
TIME OF PLACEMENT.
3. HIGH-PRESSURE WATER JET: A STREAM OF WATER UNDER A PRESSURE OF
NOT LESS THAN 3,000 PSI MAY BE USED FOR CLEANING. ITS USE SHALL BE
DELAYED UNTIL THE CONCRETE IS SUFFICIENTLY HARD SO THAT ONLY THE
SURFACE SKIN OR MORTAR IS REMOVED AND THERE IS NO UNDERCUTTING OF
COARSE-AGGREGATE PARTICLES. IF THE HIGH-PRESSURE WATER JET IS
INCAPABLE OF A SATISFACTORY CLEANING, THE SURFACE SHALL BE CLEANED
BY SANDBLASTING.
4. WET SANDBLASTING: THIS METHOD OF JOINT PREPARATION MAY BE USED
WHEN THE CONCRETE HAS REACHED SUFFICIENT STRENGTH TO PREVENT
UNDERCUTTING OF COARSE AGGREGATE PARTICLES.
5. THE OPERATION SHALL BE CONTINUED UNTIL ALL ACCUMULATED LAITANCE,
COATINGS, STAINS, DEBRIS, AND FOREIGN MATERIALS ARE REMOVED. THE
SURFACE OF THE CONCRETE SHALL THEN BE WASHED THOROUGHLY TO
REMOVE ALL LOOSE MATERIAL.
6. THIS METHOD MAY BE USED ON BOTH HORIZONTAL AND VERTICAL SURFACES.
ELEVATION GENERAL NOTES
1. THE CONTRACT DRAWING ELEVATIONS ARE BASED ON THE NATIONAL GEODETIC
VERTICAL DATUM, 1929.
2. THE CONTRACTOR SHALL UTILIZE THE USGS RIVER STAGE WEBSITE FOR POOL
ELEVATIONS OF HOLT RESERVOIR AND HOLT TAILWATER.
3. THE 50% EXCEEDANCE POOL ELEVATIONS ARE THE MEDIAN POOL ELEVATIONS
FROM DATA COLLECTED OVER THE PAST 10 YEARS ACROSS ALL SEASONS. FOR
SEASON SPECIFIC DATA, SEE HYDROGRAPHS IN APPENDIX OF SPECIFICATIONS.
UNWATERING
THE LOCK CHAMBER WILL REQUIRE UNWATERING TO COMPLETE THIS CONTRACT.
CONTRACTOR MUST COORDINATE WITH LOCK SUPERVISOR AND COR TO UNWATER
LOCK CHAMBER.
GROUT AND EPOXY GENERAL NOTES
1. SURFACE CRACKS IN ALL MONOLITHS IN THE CONTRACT SHALL BE SEALED
WITH INJECTED EPOXY OR POLYURETHANE GROUT PER SPEC SECTION 03 01 32.
2. VERTICAL CRACK IN MONOLITH 14R SHALL BE FILLED VIA PRESSURE GROUTING
WITH CEMENT GROUT CONTAINING A CRYSTALLINE ADMIXTURE PER SPEC
SECTION 03 01 30.72 OR 31 68 13.
CHAMBER ACCESS RESTRICTIONS
SEE SPECIFICATION SECTION 01 00 00 FOR CHAMBER CLOSURE RESTRICTIONS.
SITE UTILITY ACCESS
1. RAW WATER FOR CONSTRUCTION PURPOSES MAY BE FILLED ON-SITE FROM
THE FIRE PUMP SYSTEM. COORDINATE SYSTEM REQUIREMENTS AND
LOGISTICS WITH THE LOCK SUPERVISOR.
2. CONTRACTORS MAY TAP INTO ON-SITE ELECTRICAL OUTLETS, PROVIDED
THEY ARE AVAILABLE, DOING SO DOES NOT CREATE A TRIPPING HAZARD TO
PERSONNEL, AND THEY ARE USED WITHIN THEIR OPERATIONAL LIMITS.
MUD AND DEBRIS REMOVAL
MUD AND DEBRIS MAY BE RELOCATED WITHIN THE CHAMBER AS APPROVED BY
THE COR. CONTRACTOR SHALL NOT STACK RELOCATED MUD AND DEBRIS
HIGHER THAN THE TOP OF TOE BLOCK AT ANY LOCATION WITHIN THE LOCK
CHAMBER.
SUBMITTALS
1. REFER TO SPECIFICATIONS FOR FULL LIST OF PROJECT SUBMITTALS
REQUIRED.
2. SUBMIT THE METHOD AND EQUIPMENT PROPOSED FOR JOINT CLEANUP AND
WASTE DISPOSAL, FOR REVIEW 30 DAYS BEFORE CONCRETE PLACEMENT
BEGINS.
3. SUBMIT CONCRETE MIX DESIGN WITH COMPLETE STATISTICAL BACKUP.
4. SUBMIT THE CONCRETE TEST REPORTS.
5. SUBMIT A FLOATING PLANT LAYOUT PLAN.
6. SUBMIT MANUFACTURER PRODUCT DATA SHEETS FOR ROCK ANCHORS AND
WATERSTOPS.
7. SUBMIT CHEMICAL GROUTING PLAN.
8. ANCHOR INSTALLATION WORK PLAN
POST-INSTALLED DOWEL NOTES
1. PROVIDE ANCHORS OF THE TYPE, EFFECTIVE EMBEDMENT, DIAMETER, AND
SPACING AS INDICATED. ADDITIONAL REQUIREMENTS ARE DEFINED IN THE
FOLLOWING NOTES.
2. STEEL ANCHOR ELEMENTS: REBAR DOWEL ANCHORS MUST MEET THE
REQUIREMENTS OF ASTM A615 GRADE 60.
3. ADHESIVE: UNLESS SPECIFICALLY INDICATED OTHERWISE, ALL POST-
INSTALLED ANCHORING ELEMENTS ARE TO BE INSTALLED WITH AN ADHESIVE
ANCHORING SYSTEM. ADHESIVE MUST BE A STRUCTURAL ADHESIVE THAT IS
RATED FOR SUBMERGED/UNDERWATER INSTALLATIONS. ANCHORS MUST
HAVE BEEN TESTED AND QUALIFIED FOR PERFORMANCE IN CRACKED AND
UNCRACKED CONCRETE, HORIZONTAL AND OVERHEAD APPLICATIONS, AND
LONG TERM CREEP IN ACCORDANCE WITH ACI 355.4.
4. ADHESIVE ANCHORS MUST HAVE THE BELOW CHARACTERISTIC BOND
STRENGTHS FOR UNCRACKED AND CRACKED CONCRETE, ASSUMING 3,000 PSI
CONCRETE AND ASSUMING MAXIMUM SHORT TERM TEMPERATURES OF 130°F
AND MAXIMUM LONG TERM TEMPERATURES OF 110°F.
5. SUBMIT MANUFACTURERS DATA AND ICC-ES EVALUATION REPORT, OR THIRD
PARTY EVALUATION REPORT IN CONFORMANCE WITH ACI 355.2 OR ACI 355.4
FOR APPROVAL. THIRD PARTY MUST BE ACCREDITED UNDER ISO/IEC 17025 BY
A RECOGNIZED ACCREDITATION BODY CONFORMING TO THE REQUIREMENTS
OF ISO/IEC 17011 IN ACCORDANCE WITH ACI 355.4. SUBMITTAL MUST INCLUDE
MANUFACTURER'S INSTALLATION INSTRUCTIONS.
REBAR
DIAMETER (IN)
3/8 1/2 5/8 3/4 7/8
Tau, uncr
(PSI)
1,530 1,500 1,470 1,430 1,400 1,370
Tau, cr
(PSI)
Tau, uncr = CHARACTERISTIC BOND STRENGTH, UNCRACKED CONCRETE.
Tau, cr = CHARACTERISTIC BOND STRENGTH, CRACKED CONCRETE.
MASS CONCRETE PLACEMENT REQUIREMENTS
1. THE CONTRACTOR MUST SUBMIT A DETAILED MASS CONCRETE PLACEMENT PLAN TO USACE
CESAM-ENDA FOR REVIEW AND APPROVAL PRIOR TO COMMENCING PLACEMENT ACTIVITIES.
THE PLAN IS TO ADDRESS UNDERWATER PLACEMENT AND IN-THE-DRY PLACEMENT.
2. THE SUBMITTED PLAN MUST INCLUDE:
a. A DESCRIPTION OF THE CONSTRUCTION METHODOLOGY AND SEQUENCE.
b. DETAILS OF FORMWORK, REINFORCEMENT, AND CONCRETE MIX DESIGN.
c. A TEMPERATURE CONTROL PLAN TO MITIGATE THERMAL EFFECTS DURING
PLACEMENT AND CURING.
d. SCALED DEMONSTRATION TEST PLAN FOR UNDERWATER CONCRETE
PLACEMENT
3. THE TEMPERATURE CONTROL PLAN MUST ADDRESS:
a. MAXIMUM ALLOWABLE TEMPERATURE DIFFERENTIALS DURING CURING.
b. PRE-COOLING OR POST-COOLING OF CONCRETE AS NECESSARY.
c. MONITORING AND LOGGING OF CONCRETE TEMPERATURE USING EMBEDDED
SENSORS.
d. ADJUSTMENTS TO PLACEMENT RATES OR TIMING BASED ON THERMAL DATA.
4. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING ALL PLACEMENT AND CURING
PROCESSES MEET USACE SPECIFICATIONS AND PROJECT-SPECIFIC GUIDELINES.
5. ANY MODIFICATIONS TO THE APPROVED PLAN MUST BE SUBMITTED FOR REVIEW AND
APPROVAL.
6. ON-SITE INSPECTIONS BY USACE OR DESIGNATED REPRESENTATIVES WILL BE
CONDUCTED TO VERIFY COMPLIANCE.
7. THE CONTRACTOR MUST PROVIDE TEMPERATURE MONITORING REPORTS AS PART OF
THEIR DAILY LOGS DURING PLACEMENT AND CURING.
8. THE MAXIMUM ALLOWABLE TEMPERATURE DIFFERENTIAL FOR MASS CONCRETE
PLACEMENTS BELOW WATER SHALL BE 35°F (19°C) BETWEEN THE CENTER AND THE
SURFACE.
9. PROVIDE SCALED DEMONSTRATION TEST OF UNDERWATER MASS CONCRETE PLACEMENT
FOR VERIFICATION OF CONCRETE MIX DESIGN AND PLACEMENT METHOD PRIOR TO
PLACEMENT IN THE FIELD.
CONCRETE CONSTRUCTION NOTES (SPEC SECTION 03 70 00):
1. ALL CONCRETE CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE
SPECIFICATIONS.ALL CONCRETE DESIGN PERFORMED BY THE CONTRACTOR SHALL BE
IN ACCORDANCE WITH ACI 318.
2. ALL CAST-IN-PLACE CONCRETE SHALL ATTAIN A MINIMUM 28-DAY COMPRESSIVE
STRENGTH (F'C) OF 4,000 PSI.
3. CONCRETE REINFORCING STEEL SHALL BE DEFORMED BARS CONFORMING TO ASTM
A615/A615M, GRADE 60 AND SHALL HAVE FABRICATION TOLERANCES IN ACCORDANCE
WITH ACI 315.
4. CONCRETE REINFORCING STEEL SHALL BE CONTINUOUS UNLESS OTHERWISE
INDICATED. CONTINUOUS REINFORCING STEEL SHALL BE LAPPED IN ACCORDANCE
WITH THE REQUIREMENTS OF ACI 318. REINFORCING STEEL SHALL BE PLACED SO THAT
SPACING IS GREATER THAN OR EQUAL TO 2X BAR DIAMETER. MINIMUM LAP SPLICE FOR
#6 BARS SHALL BE 30"
5. MINIMUM CONCRETE COVER FOR REINFORCING STEEL SHALL BE AS INDICATED.
a. CONCRETE DEPOSITED AGAINST THE GROUND 6 INCH
b. CONCRETE EXPOSED TO EARTH OR WEATHER 6 INCH
6. CONCRETE REINFORCING STEEL STANDARD HOOKS, SHALL HAVE A 90 DEGREE HOOK A
MINIMUM OF 12 BAR DIAMETERS IN LENGTH, UNLESS OTHERWISE NOTED. STIRRUPS,
TIES, AND 180 DEGREE HOOKS SHALL CONFORM TO THE REQUIREMENTS OF ACI 318.
7. ALL EMBEDDED ITEMS SHALL BE PROPERLY PLACED, ACCURATELY POSITIONED AND
MAINTAINED SECURELY IN PLACE PRIOR TO AND DURING CONCRETE PLACEMENT.
8. REINFORCING STEEL SHALL BE SPREAD AT SLEEVES, ANCHORS, RECESSES AND OTHER
EMBEDDED ITEMS UNLESS OTHERWISE INDICATED. REINFORCEMENT SHALL NOT BE
CUT TO FACILITATE PLACEMENT OF EMBEDDED ITEMS, UNLESS INDICATED.
9. NO CONCRETE SHALL BE PLACED UNTIL THE OWNER OR THE OWNER'S DESIGNATED
REPRESENTATIVE HAS INSPECTED ALL EMBEDDED WORK, INCLUDING REINFORCEMENT.
10. ALL EXPOSED CONCRETE EDGES SHALL BE CHAMFERED 3/4 INCH UON.
11. ALUMINUM SHALL NOT BE PLACED IN DIRECT CONTACT WITH CONCRETE UNLESS
EFFECTIVELY COATED OR COVERED TO PREVENT ALUMINUM-CONCRETE REACTION
AND ELECTROLYTIC ACTION BETWEEN ALUMINUM AND STEEL.
12. THE MAXIMUM ALLOWABLE TEMPERATURE DIFFERENTIAL FOR MASS CONCRETE
PLACEMENTS BELOW WATER SHALL BE 35°F (19°C) BETWEEN THE CENTER AND THE
SURFACE.
A
M E
N D
M E
N T
/1
/2
A
M E
N D
M E
N T
/3
/2
T.O. MONOLITH
193' - 6"
LCS BASEMENT
LCS
G A
L L E
R Y
CULVERT
LOCK
CHAMBER
ASSUMED CRACK
LOCATION
ASSUMED POTENTIAL
CRACK LOCATIONS
RIVER SIDE
APPROXIMATE
FOUNDATION
APPROX. LOCK FLOOR
EL. 90.7'
CRACK VISIBLE ACROSS
BASEMENT FLOOR
EL. 178.5'
EL. VARIES
121' (APPROX) TO 115'
EL. VARIES
108' (APPROX) TO 102.5'
CRACKS VISIBLE
IN CULVERT
PARTIAL PLAN AT
CULVERT FLOOR
PARTIAL PLAN AT
CULVERT CEILING
CRACK ALONG
CULVERT FLOOR
CRACK ALONG
CULVERT CEILING
LOCK
SIDE
RIVER
SIDE
LOCK
SIDE
RIVER
SIDE
MONOLITH JOINT MONOLITH JOINT
BULKHEAD
SLOT
BULKHEAD
SLOT
MONOLITH JOINT MONOLITH JOINT
LARGE SPALL IN
CULVERT WALL-
CLEAN AND PATCH
REPAIR WITH
POLYURETHANE
GROUT
CULVERT FLOOR
CULVERT WALL
± 1'-0"
SECTION
± 1'-0"
6"
SAWCUT WALL
AND CHIP OUT
EXIST. CONCRETE
6"
SAWCUT WALL
AND CHIP OUT
EXIST. CONCRETE
(2) #4 DOWELS W/ 90 DEG. STD.
HOOK DRILL AND EPOXY INTO
EXISTING CONCRETE, TYPICAL
MIN. EMBED 6"
#4 TYP.
(3) #4 EQ.
SPACED
(2) #4 DOWELS W/ 90 DEG. STD.
HOOK DRILL AND EPOXY INTO
EXISTING CONCRETE, TYPICAL
MIN. EMBED 6"
#4
(3) #4 EQ. SPACED
4" C.C.
APPLY BONDING AGENT AT
CONCRETE INTERFACE
NOTE:
SPALL DIMENSIONS ARE
SHOWN FOR BIDDING
PURPOSES AND MAY
VARY IN FIELD.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P R
O J E
C T
N O
F
IL
E N
A M
E
S-113
R
C U
L V
E R
T C
R A
C K
L O
C A
T
IO
N S
H O
L T
L O
C K
A N
D D
A M
M O
B
IL
E D
IS
T
R
IC
T M
O B
IL
E
A
L A
B A
M A
R Z
U E
L Z
K E
T S
A N
D
IF
E R
E V
IN
C
E N
T
A J U
S T
IC
E
M A
Y
A M
E N
D M
E N
T
H O
L T
L O
C K
M O
N O
L
IT
H R
R
E S
T O
R A
T
IO
N
C H
C
S T
R C
R e v it P ro je c t
T e m p la te C
E S
A M
.r v t
1/8" = 1'-0"1
14R UPSTREAM ELEVATION
1/8" = 1'-0"2
CULVERT FLOOR AND CEILING SURFACE CRACKS
A
M E
N D
M E
N T
/1
/2
A
M E
N D
M E
N T
/3
/2
T.O. MONOLITH
193' - 6"
F.F. BASEMENT
178' - 6"
T.O. PARAPET
196' - 0"
EL. 186.5
UPPER POOL
EL. 122.9
LOWER POOL
M O
N O
L
IT
H J
O
IN
T
S
A .6
A
M O
N O
L
IT
H J
O
A .0
A
13R
14R
15R
FLOATING
MOORING BITT
SLOT
LINE HOOK,
RECESS, TYP.
LIFT LINE, TYP.
F L O
A T
IN
G
M O
R R
IN
G
B
IT
A .1
A
ANCHOR ROW 1
EL. 175.50'
ANCHOR ROW 2
EL. 171.00'
ANCHOR ROW 3
EL. 166.00'
ANCHOR ROW 4
EL. 161.75'
ANCHOR ROW 5
EL. 156.00'
ANCHOR ROW 6
EL. 151.00'
ANCHOR ROW 7
EL. 146.00'
ANCHOR ROW 8
EL. 141.00'
ANCHOR ROW 9
EL. 136.00'
ANCHOR ROW 10
EL. 131.00'
ANCHOR ROW 11
EL. 127.00'
ANCHOR ROW 12
EL. 121.52'
CULVERT BEYOND
BASEMENT
BEYOND
VERTICAL CABLE SHAFT
BEYOND. COLUMN GRID "L"
ANCHORS TO BE THRU-
BOLTED INTO SHAFT.
F.F. GALLERY/
1A 1B 1C 1D 1G 1H 1L
2B 2C 2D 2G 2H 2J 2K 2L 2M
3B 3C 3D 3F 3G 3H 3K 3L 3M
4B 4C 4D 4F 4L
5B 5C 5D 5E 5F 5G 5J 5K 5M
6C 6D 6E 6F 6G 6H 6K 6L 6M
7B 7C 7D 7E 7F 7G 7J 7K 7L
8A 8B 8C 8D 8E 8F 8H 8J 8K
9A 9B 9C 9D 9E 9G 9H 9J
10B 10C 10D 10E 10F 10G 10J 10L
11B
3A
4A
5A
6B
7A
10A
11A 11C 11D 11E 11F 11G 11J 11K 11L
12B 12C 12D 12E12A
1M
3J
5H
6J
7H
8G
9F
10H
11H
ANCHORS IN THIS GROUP
ARE THROUGH BOLTED
WITH RECESS NEAR SIDE
AND FAR SIDE.
ANCHORS IN THIS GROUP
ARE THROUGH BOLTED
TO CABLE SHAFT WITH
RECESS NEAR SIDE.
A B C D E F G H J K L M
TB-A TB-B TB-C TB-D TB-E TB-F TB-G TB-H TB-J TB-K TB-L TB-M TB-N TB-P
2A
5L
6A
7M
8L 7.9M
9K 9L 9M
10K
11M
12F
ANCHOR ROW 4.1
EL. 160.65'
ANCHOR ROW 7.9
EL. 141.65'
7' - 8"5' - 0"4' - 4"4' - 4"4' - 4"4' - 4"4' - 4"6' - 5"4' - 2 1/2"4' - 2 1/2"4' - 2 1/2"4' - 4"
2' - 0"2' - 4"
TB-Q
ANCHOR ROW 13
EL. 101.50'
13TBA 13TBB 13TBC 13TBD 13TBE 13TBF 13TBG 13TBH 13TBJ 13TBK 13TBL 13TBM 13TBN 13TBP 13TBQ
2' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 1' - 8"
EDGE OF LCS
ON BACKSIDE
OF MONOLITH
GALLERY
BEYOND
4' - 5"2' - 0"
METAL WALL
ARMOR, TYP.
ELEVATOR SHAFT
BEYOND
CABLE SHAFT SUMP
PIT BEYOND
5" DIA. CORE W/
PIEZOMETER BEYOND
5" DIA. CORE W/
PIEZOMETER BEYOND
8' - 3 1/2"
CHAMBER LIGHT
RECESS
4.1G 4.1H 4.1K4.1J 4.1M
10M
TB-PTB-A
DAMAGED CONCRETE AT FLOATING
MOORING BIT. SEE DETAILS ON S-150
FOR ANCHOR REPAIR.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P R
O J E
C T
N O
F
IL
E N
A M
E
S-131
A N
C H
O R
L O
C A
T
IO
N E
L E
V A
T
IO
N
H O
L T
L O
C K
A N
D D
A M
M O
B
IL
E D
IS
T
R
IC
T M
O B
IL
E
A
L A
B A
M A
R Z
U E
L Z
K E
T S
A N
D
IF
E R
E V
IN
C
E N
T
A J U
S T
IC
E
M A
Y
A M
E N
D M
E N
T
H O
L T
L O
C K
M O
N O
L
IT
H R
R
E S
T O
R A
T
IO
N
C H
C
S T
R C
R e v it P ro je c t
T e m p la te C
E S
A M
.r v t
3/16" = 1'-0"
MONOLITH 14R CHAMBER SIDE ELEVATION-ANCHOR LOCATIONS
1A 34'-8" 8 1B 34'-8" 6 1C 34'-8" 4 1D 34'-8" 2 1G 46'-8" 1 1H 46'-8" 3 1L 30'-1" 5 1M 44'-0" 7 2A 34'-8" 18 2B 34'-8" 16 2C 34'-8" 14 2D 34'-8" 12 2G 46'-8" 10 2H 44'-0" 9 2J 44'-0" 11 2K 44'-0" 13 2L 30'-1" 15 2M 44'-0" 17 3A 34'-8" 28 3B 34'-8" 26 3C 34'-8" 24 3D 34'-8" 22 3F 46'-8" 20 3G 46'-8" 19 3H 44'-0" 21 3J 44'-0" 23 3K 44'-0" 25 3L 30'-1" 27 3M 44'-0" 29 4A 34'-8" 39 4B 34'-8" 37 4C 34'-8" 35 4D 34'-8" 33 4F 46'-8" 31 4.1G 44'-0" 30 4.1H 44'-0" 32 4.1J 44'-0" 34 4.1K 44'-0" 36 4L 30'-1" 38 4.1M 44'-0" 40 5A 34'-8" 52 5B 34'-8" 50 5C 34'-8" 48 5D 34'-8" 46 5E 46'-8" 44 5F 46'-8" 42 5G 44'-0" 41 5H 44'-0" 43 5J 44'-0" 45 5K 44'-0" 47 5L 30'-1" 49 5M 44'-0" 51 6A 34'-8" 64 6B 34'-8" 62 6C 34'-8" 60 6D 34'-8" 58 6E 46'-8" 56 6F 44'-0" 54 6G 44'-0" 53 6H 44'-0" 55 6J 44'-0" 57 6K 44'-0" 59 6L 30'-1" 61 6M 44'-0" 63 7A 34'-8" 76 7B 34'-8" 74 7C 34'-8" 72 7D 34'-8" 70 7E 46'-8" 68 7F 44'-0" 66 7G 44'-0" 65 7H 44'-0" 67 7J 44'-0" 69 7K 44'-0" 71 7L 30'-1" 73 7M 44'-0" 75 8A 37'-0" 88 8B 37'-0" 86 8C 37'-0" 84 8D 37'-0" 82 8E 44'-0" 80 8F 44'-0" 78 8G 44'-0" 77 8H 44'-0" 79 8J 44'-0" 81 8K 44'-0" 83 8L 30'-1" 85 7.9M 44'-0" 87 9A 41'-0" 100 9B 41'-0" 98 9C 41'-0" 96 9D 41'-0" 94 9E 44'-0" 92 9F 44'-0" 90 9G 44'-0" 89 9H 44'-0" 91 9J 44'-0" 93 9K 44'-0" 95 9L 30'-1" 97 9M 44'-0" 99 10A 44'-11" 112 10B 44'-11" 110 10C 44'-11" 108 10D 44'-11" 106 10E 44'-0" 104 10F 44'-0" 102 10G 44'-0" 101 10H 44'-0" 103 10J 44'-0" 105 10K 44'-0" 107 10L 30'-1" 109 10M 44'-0" 111 11A 48'-5" 124 11B 48'-5" 122 11C 48'-5" 120 11D 44'-0" 118 11E 44'-0" 116 11F 44'-0" 114 11G 44'-0" 113 11H 44'-0" 115 11J 44'-0" 117 11K 44'-0" 119 11L 30'-1" 121 11M 44'-0" 123 12A 44'-0" 130 12B 44'-0" 128 12C 44'-0" 126 12D 44'-0" 125 12E 44'-0" 127 12F 44'-0" 129
ANCHOR
NUMBER
ANCHOR TABLE
EFFECTIVE ANCHOR LENGTH IS
MEASURED FROM BOTTOM OF
BEARING PLATE(S) AND IS
APPROXIMATE AND FOR REFERENCE
ONLY. CONTRACTOR MUST DESIGN
ANCHORAGE AND STRESSING
LENGTH. FINAL OVERALL ANCHOR
LENGTH PENDING SPECIFIC
HARDWARE REQUIREMENTS BY
CONTRACTOR.
13TBA 48'-0" 144
13TBB 48'-0" 142
13TBC 48'-0" 140
13TBD 48'-0" 138
13TBE 48'-0" 136
13TBF 48'-0" 134
13TBG 48'-0" 132
13TBH 48'-0" 131
13TBJ 48'-0" 133
13TBK 48'-0" 135
13TBL 48'-0" 137
13TBM 48'-0" 139
13TBN 48'-0" 141
13TBP 48'-0" 143
13TBQ 48'-0" 145
FMB 24'-0" -
ANCHOR
NUMBER
BULKHEAD SLOT,
BEYOND
NOTE:
HORIZONTAL AND INCLINED
ANCHOR ELEVATIONS ARE AT
PROJECTED CENTERLINE OF
ANCHOR AT WALL FACE.
ANCHOR ROD NOTE:
ALL ANCHORS ON ROWS 1-12 SHALL BE
2 1/2"⌀ GRADE 150 KSI ALL-THREAD-BAR.
ALL ANCHORS ON ROW 13 (TOE BLOCK
ANCHORS) SHALL BE 3"⌀ GRADE 150 KSI
ALL-THREAD-BAR.
ALTERNATE CONTRACTOR-SUPPLIED
ANCHOR STRESSING SEQUENCE MAY
BE ALLOWED PENDING GOVERNMENT
APPROVAL. CONTRACTOR SHALL
INSTALL, AT MINIMUM, THRU-BOLTED
ANCHORS ON ROWS 1 AND 2 FIRST.
**EFFECTIVE
ANCHOR
LENGTH
STRESSING
SEQUENCE
**STRESSING
SEQUENCE*
EFFECTIVE
ANCHOR
LENGTH
HOLE
ALIGNMENT
TOLERANCE
1:200 1:57 1:57 1:57 1:57 1:200 1:200 1:200 1:200 1:57 1:57 1:57 1:57 1:57 1:57 1:57 1:200 1:200 1:200 1:57 1:57 1:57 1:57 1:100 1:57 1:57 1:57 1:200 1:200 1:200 1:57 1:57 1:57 1:200 1:200 1:100 1:100 1:100 1:200 1:200 1:200 1:57 1:57 1:57 1:57 1:200 1:57 1:57 1:57 1:57 1:200 1:200 1:200 1:57 1:57 1:57 1:57 1:57 1:57 1:57 1:57 1:57 1:200 1:200 1:200 1:57 1:57 1:57 1:57 1:57 1:57 1:57 1:57 1:57 1:200 1:200 1:200 1:57 1:57 1:57 1:57 1:57 1:57 1:57 1:57 1:57 1:200 1:200 1:200 1:57 1:57 1:57 1:57 1:57 1:57 1:57 1:57 1:57 1:200 1:200 1:200 1:57 1:57 1:57 1:57 1:57 1:57 1:57 1:57 1:57 1:200 1:200 1:200 1:57 1:200 1:200 1:200 1:200 1:200 1:200 1:200 1:150 1:200 1:200 1:200 1:57 1:57 1:57 1:57 1:200
HOLE
ALIGNMENT
TOLERANCE
1:100 1:57 1:57 1:57 1:57 1:57 1:57 1:57 1:57 1:57 1:100 1:100 1:100 1:100 1:100 1:100
ANCHOR TABLE
A
M E
N D
M E
N T
/1
/2
A
M E
N D
M E
N T
/3
/2
/2
/2
F
IE
L
D V
E R
IF
Y
CULVERT
15°
8' - 0"
NOTES:
1. SEE ENLARGED TOE
BLOCK DETAIL FOR
REINFORCEMENT.
2. TOE BLOCK LIFT LINES
TO MATCH THOSE ON
MONOLITH 14R.
EL. 109
PROVIDE CONTINUOUS LAYER OF
#57 STONE BELOW NEW TOE BLOCK.
(MIN. 1'-0" THICK x 13'-0" WIDE)
LIFT LINES,
TYPICAL
EL. 91.7
EL. 90.7
(VARIES)
S-402
TB-A TB-B TB-C TB-D TB-E TB-F TB-G TB-H TB-J TB-K TB-L TB-M TB-N TB-P
59' - 8" NEW CONCRETE TOE BLOCK
CABLE SHAFT BEYOND
CABLE SHAFT SUMP PIT,
BEYOND
CULVERT BEYOND
S-402
/2
/2
F
IE
L
D V
E R
IF
Y
M O
N O
L
IT
H J
O
A .6
A
M O
N O
L
IT
H J
O
A .0
A
TB-Q
1' - 8"4' - 0"4' - 0"4' - 0"4' - 0"4' - 0"4' - 0"4' - 0"4' - 0"4' - 0"4' - 0"4' - 0"4' - 0"4' - 0"4' - 0"2' - 0"
EL 90.7
EL 91.7
PROVIDE CONTINUOUS LAYER OF
#57 STONE BELOW NEW TOE BLOCK.
(MIN. 1'-0" THICK x 13'-0" WIDE)
5' - 8"54' - 0"
35' - 0"
CABLE SHAFT SUMP PIT
/2
F
IE
L
D V
E R
IF
Y
8' - 0"
EL. 109
LIFT LINES,
TYPICAL
CULVERT
/2
NOTES:
1. SEE ENLARGED TOE
BLOCK DETAIL FOR
REINFORCEMENT.
2. TOE BLOCK LIFT LINES
TO MATCH THOSE ON
MONOLITH 14R.
PROVIDE CONTINUOUS LAYER OF
#57 STONE BELOW NEW TOE BLOCK.
(MIN. 1'-0" THICK x 13'-0" WIDE)
EL. 91.7
EL. 90.7
(VARIES)
/2
F
IE
L
D V
E R
IF
Y
#8 BARS
AT 12" O.C.
EACH SIDE
#4 TIES AT 4" (2 FROM BASE PLATE)
AND #4 TIES AT 6" O.C. FOR BALANCE
(8) #6 BARS
AROUND EACH
ANCHOR
NEW CONCRETE TOE BLOCK
8' - 0"
(9) #8 BARS TOP & BTM.
W/ STD. HOOK EACH END
#9 BARS
AT 12" O.C.
EL. 109
/2
LIFT LINE
LIFT LINE
3"
3" CLEAR
ALL AROUND
CHAMFER AT LIFT LINES
TO MATCH EXISTING,
TYPICAL
NOTE:
ANY HORIZONTAL REINF. THAT
INTERSECTS THE ANCHOR, SHALL
STOP 6" CLEAR OF ANCHOR ON
EACH SIDE. INTERSECTING BARS
NOT SHOWN FOR CLARITY.
5' - 0" 2' - 0"
5' - 0" 2' - 0"
GRADE 60, #9 DOWELS W/ 90 DEG. STD.
HOOK AT 18" O.C. DRILL AND EPOXY INTO
EXISTING CONCRETE, TYPICAL
GRADE 60, #9 DOWELS W/ 90 DEG. STD.
HOOK AT 18" O.C. DRILL AND EPOXY INTO
EXISTING CONCRETE, TYPICAL
PROVIDE CONTINUOUS LAYER OF
#57 STONE BELOW NEW TOE BLOCK.
(MIN. 1'-0" THICK x 13'-0" WIDE)
CONTRACTOR TO PROPOSE
REBAR SPLICE LOCATIONS
CONTRACTOR TO PROPOSE
REBAR SPLICE LOCATIONS
S-402
#4 TIES
(8) #6 BARS
C .C
CORE HOLE
ANCHOR ROD
1/4" = 1'-0"2
SECTION
3/16" = 1'-0"1
MONOLITH 14R CHAMBER SIDE ELEVATION-BASE ANCHOR LOCATIONS
1/4" = 1'-0"3
SECTION
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P R
O J E
C T
N O
F
IL
E N
A M
E
S-402
T O
E B
L O
C K
D E
T A
IL
S
H O
L T
L O
C K
A N
D D
A M
M O
B
IL
E D
IS
T
R
IC
T M
O B
IL
E
A
L A
B A
M A
R Z
U E
L Z
K E
T S
A N
D
IF
E R
E V
IN
C
E N
T
A J U
S T
IC
E
M A
Y
A M
E N
D M
E N
T
H O
L T
L O
C K
M O
N O
L
IT
H R
R
E S
T O
R A
T
IO
N
C H
C
S T
R C
R e v it P ro je c t
T e m p la te C
E S
A M
.r v t
1/2" = 1'-0"
ENLARGED TOE BLOCK DETAIL
NOTE:
TOE BLOCK SHALL BE CONSTRUCTED IN-THE-WET.
A
M E
N D
M E
N T
/1
/2
A
M E
N D
M E
N T
/3
/2
3/4" = 1'-0"4
SECTION
| Sheets |
| G-001 - COVER SHEET |
| G-002 - GENERAL NOTES, ABBREVIATIONS |
| S-113 - 14R CULVERT CRACK LOCATIONS |
| S-131 - ANCHOR LOCATION ELEVATION |
| S-402 - TOE BLOCK DETAILS |
File details come from the government source that posted it. Updated .