W9127825RA015_AM02.pdf
PDF 1 MB Posted
- Attached to
- Holt Lock Monolith R14 Restoration
- Solicitation number
- W9127825RA015
About this file
This document is an Amendment (No. W9127825RA015-0002) to a federal solicitation for the Holt Lock Monolith R14 Restoration project at Holt Dam on the Black Warrior River in Alabama. The amendment modifies the original solicitation by updating specification and drawing revisions, and revising the proposal receipt date. The project involves repairing monolith R14 through various technical interventions including horizontal drilling, installing post-tension anchor bars, internal pressure grouting, epoxy crack injection, water stop installation, underwater concrete placement, and lock chamber dewatering.
Key modifications include revised technical specifications for sections 01 00 00, 13 51 00.10, and 31 68 13, updates to the bidding schedule and bid item explanations, and changes to the proposal submission deadline. The amendment is issued by the U.S. Army Corps of Engineers Mobile District, with a project number of CHC24010. Contractors are required to acknowledge the amendment and incorporate the specified revisions into their proposal submissions, with the new proposal receipt date set for 10 June 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W9127825RA015_AM02_DRAWINGS.pdf | ||
| W9127825RA015_Site Visit Attendees.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE
DATE
4. REQUISITION/PURCHASE
REQ. NO.
5. PROJECT NO. (If applicable)
W9127825RA015-0002 02 JUNE 2025 CHC24010
6. ISSUED BY CODE 7. ADMINISTERED BY(If other than item 6)
CODE
Corps of Engineers
109 St. Joseph St.
Mobile, AL 36602
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION
NO.
W9127825RA015
9B. DATED (SEE ITEM 11)
24 APRIL 2025
10A. MODIFICATION OF
CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE
FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE
PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
The subject solicitation for: HOLT LOCK MONOLITH R14 RESTORATION - HOLT DAM BLACK WARRIOR RIVER, ALABAMA (TUSCALOOSA COUNTY)
Is modified in the following: REFER TO THE ENCLOSED REVISED SPECIFICATION/DRAWING REVISIONS FOR AMENDMENT NO. 0002 NOTE: THE RECEIPT OF PROPOSAL DATE IS HEREBY REVISED BY THIS AMENDMENT. REFER TO THE ENCLOSED SF1442, SOLICITATION, OFFER &
AWARD FORM.
Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as Heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICE (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of contracting officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
HOLT LOCK MONOLITH R14 RESTORATION W9127825RA015
HOLT DAM BLACK WARRIOR RIVER, ALABAMA CHC24010
SF 30 Page 2
AMENDMENT NO. W9127825RA015-0002
PART I-REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS
The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.
Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.
Corresponding Added or Revised Paragraph
SECTION Page, and/or Section
SF1442 Revised box 13.a as indicated herein.
Bidding Schedule Replaced in its entirety.
Explanation of Bid Items Replaced in its entirety.
Technical Specifications
01 00 00 Revised paragraph 1.1 as indicated herein.
13 51 00.10 Revised paragraph 3.1 as indicated herein.
31 68 13 Revised paragraph 1.7.7, 3.1, 3.2.1.1, 3.2.1.5 and 3.2.5.1 as indicated herein.
PART II - NOTE: Revised, replacement and added drawings are listed below.
These revised, replacement and added drawings are to be inserted into the folio in the proper numerical sequence. Drawings that have been revised or replaced by this amendment shall be deleted from the folio. All drawings listed below are revised unless indicated otherwise.
Sheet
Reference
Number Title
G-001 COVER SHEET
G-002 GENERAL NOTES, ABBREVIATIONS
S-113 14R CULVERT CRACK LOCATIONS
S-131 ANCHOR LOCATION ELEVATION AND LENGTH/STRESSING SEQUENCE TABLE
S-402 TOE BLOCK DETAILS
Encl as stated
Revised pages of the specifications as indicated in Part I.
05 Revised drawings as indicated in Part II.
REVISED BY AMENDMENT NO. W9127825RA015-0002
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER
W9127825RA015
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
3. DATE ISSUED
24 APR 2025
PAGE OF PAGES
1 2 IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
6. PROJECT NUMBER
CHC24010
7. ISSUED BY CODE
CT 8. ADDRESS OFFER TO
U.S. ARMY ENGINEER DISTRICT, MOBILE
CONTRACTING DIVISION (CESAM-CT)
SAME AS BLOCK 7
9. FOR
INFORMATION CALL
a. NAME
Jennifer Suit / Elizabeth (Lisa) Trimble
b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
(251) 441-6466 / (251) 690-3329
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
HOLT LOCK MONOLITH R14 RESTORATION – HOLT DAM BLACK WARRIOR RIVER, ALABAMA (TUSCALOOSA COUNTY)
* See Section 01 00 00, Paragraph “COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK”.
**Block 13A. : Refer to Section 00 11 00 for the number of copies to submit with the original offer.
11. The contractor shall begin performance within ___8____ calendar days and complete it within ___*___ calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See _ __________________ .)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If "YES," indicate within how many calendar days after award in Item 12b.)
YES NO
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and ___**___ copies to perform the work required are due at the place specified in Item 8 by _1400_ (hour) local time 28 MAY 04 10 JUNE 2025 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than __120__ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442 (12/2022)
Prescribed by GSA FAR(48 CFR) 53.236-1(d)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within _________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT
NUMBER
DATE
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY
CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE
30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. AWARD
DATE
STANDARD FORM 1442 (REV12/2022) BACK
BIDDING SCHEDULE - PAGE 1
REPLACED BY AMENDMENT NO. W9127825RA015-0002
BIDDER'S NAME:_______________________________________________________________
BID SCHEDULE
Item Estimated Unit
No. Description Quantity Unit Price ____ Amount_____
Base Bid:
1 Site Work 1 JOB XXX ___________
2 Marine Plant 1 JOB XXX ___________
(Tugboat and Barge)
3 Intermediate Mobilization ___ EA ___ ___________ and Demobilization
4 Horizontal 7” Core Drill 2,612 LF ___ ___________ for Thru-Bolt Anchor
5 Inclined 8” Core Drill 3,036 LF ___ ___________
For Embedded Anchor
6 Inclined 9” Core Drill 750 LF ___ ___________
For Toe Block Embedded
Anchor
7 Monolith Monitoring 1 JOB XXX ___________
8 Anchor End Recess 184 EA ___ ___________
9 2.5” Diameter Anchor 64 EA ___ ___________
Install for Thru-
Bolt Anchorage
10 2.5” Diameter Anchor 67 EA ___ ___________
Install for
Embedded Anchorage
11 3” Diameter Anchor 15 EA ___ ___________
Install for Embedded
Anchorage At Toe Block
12 Cementitious Grouting 1200 CFT ___ ___________
13 Re-Drilling 2000 LFT ___ ___________
14 Water Stop 1 JOB XXX ___________
15 Lock Dewatering 1 JOB XXX ___________
16 Epoxy Grout 310 GAL ___ ___________
Injection of cracks
17 Concrete Toe Block 1 JOB XXX ___________
BIDDING SCHEDULE - PAGE 2
18 Polyurethane Grout 450 GAL ___ ___________
Injection of cracks
19 MISC. Concrete Work 1 JOB ___ ___________
TOTAL BASE BID ___________
Bid Option:
20 Remove Riverside 1 JOB XXX ___________
Filling Valve
TOTAL Base BID PLUS BID OPTION ___________
BIDDING SCHEDULE - PAGE 3
NOTES FOR BIDDING SCHEDULES
NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest bid schedules as published in the solicitation or the latest amendment thereto.
In lieu of indicating additions/deductions to bid items, bidder should state the revised prices for each item. The company name should be indicated on the face of the bidding schedule to preclude being misplaced.
NOTE NO. 2. Bidder must insert a price on all numbered items of the Bidding
Schedule. Failure to do so will disqualify the bid.
NOTE NO. 3. In accordance with FAR 52.211-18 Variation in Estimated Quantity
-in the unit-priced line items 0004, 0005, 0006, 0012, 0013,0016, and 0018 are an estimated quantity. The actual quantity of the unit-priced item may vary. If the variance is less than 15 percent, a modification will be processed to add the quantity of the variance at the awarded unit price. If the variance is more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract unit price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity.
NOTE NO. 4. 52.217-5 EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the
Government to exercise the option(s).
(End of clause)
The Government may require the delivery of the numbered line items, identified in the schedule as option items, in the quantity and at the price stated in the schedule. Subject to the availability of funds, the Contracting
Officer may exercise Bid Option 1 by written notice to the Contractor within the periods expressed in the explanation of bid items.
END OF BID SCHEDULE
EXPLANATION OF BID ITEMS - PAGE 1
EXPLANATION OF BID ITEMS
GENERAL: This section comprises an explanation of the bid items identified in the bid schedule. This section is a general scope of work for the bid items described in the bidding schedule and is not intended to be all encompassing in the descriptions. All work specified herein shall be accomplished in accordance with the procedures prescribed in the technical provisions of the specifications and the Scope of Work. The Contractor shall bid each type of work under the applicable bid item. Payment described for the various bid items will be full compensation for all labor, materials, and equipment required to complete the work. Compensation for any item of work described in the contract but not listed in the bid schedule shall be included in the payment for the item of work to which it is made subsidiary.
BASE BID
Bid Item No. 1: Site Work
Payment under Bid Item No. 1, Site Work will be made at the contract job price and will constitute full compensation for all work associated with site preparation. This includes but not limited to contractor furnished office space for contractor and Government trailer, temporary utility connections, traffic control, traffic signage, temporary sanitary facilities, and project sign.
Bid Item No. 2: Marine Plant (Tugboat and Barge)
Payment under Bid Item No. 2, Marine Plant (Tug and Barge), will be provided at the contract job price and will constitute full compensation for all work associated with furnishing and operating the marine plant in accordance with the scope of work. This includes but not limited to tugboat operator, crew, initial mobilization, and final demobilization.
Bid Item No. 3: Intermediate Mobilization and Demobilization
Payment under Bid Item No. 3, Intermediate Mobilization and Demobilization will be made at the contract each price and will constitute full compensation for all work associated with intermediate demobilization and mobilization. This includes demobilizing all construction equipment from the lock chamber and remobilizing back into the lock chamber. Contractor shall enter the number of mobilizations required based upon their proposed schedule and the unit price for each mobilization and demobilization. Contractor shall be required to demobilize as directed in the specifications.
Bid Item No. 4: Horizontal 7” Core Drill for Thru-Bolt Anchor
Payment under Bid Item No. 4, Horizontal 7” Core Drill will be made at the contract linear feet price and will constitute full compensation for all work associated with drilling 7” core holes and furnishing necessary equipment to safely drill holes in vertical faces of monolith in accordance with the scope of work. Core holes for this item will extend through the monolith and daylight on the riverside of the monolith.
Bid Item No. 5: Inclined 8” Core Drill for Embedded Anchor
EXPLANATION OF BID ITEMS - PAGE 2
Payment under Bid Item No. 5, Inclined 8” Core Drill, will be made at the contract Linear Feet price and will constitute full compensation for all work associated with drilling 8” core holes and furnishing the necessary equipment to safely drill holes in the vertical faces of the monolith in accordance with the scope of work. Core holes for this item will extend into the monolith but will not daylight on the river side.
Bid Item No. 6: Inclined 9” Core Drill for Toe Block Embedded Anchor
Payment under Bid Item No. 6, Inclined 9” Core Drill, will be made at the contract Linear Feet price and will constitute full compensation for all work associated with drilling 9” core holes and furnishing the necessary equipment to safely drill holes in the vertical faces of the monolith in accordance with the scope of work. Core holes for this item will extend into the monolith but will not daylight on the river side.
Bid Item No. 7: Monolith Monitoring
Payment under Bid Item No. 7, Monolith Monitoring, will be made at the contract job price and will constitute full compensation for all work associated with monitoring the monolith for movement during the coring process and anchor installation.
Bid Item No. 8: Anchor End Recess
Payment under Bid Item No. 8, Anchor End Recess will be made at the contract each price and will constitute full compensation for all work associated with the coring the Recess for all anchor types. This includes but not limited to providing approximately 18” diameter recess pockets at a depth accommodating contractor’s anchorage at each anchor end. The anchors must not protrude from the face of the monolith. Toe Block recess are to be formed and not included in this bid item
Bid Item No. 9: 2.5” Diameter Anchor Install for Thru-Bolt Anchorage
Payment under Bid Item No. 9, 2.5” Diameter Anchor Install for Thru-Bolt will be made at the contract each price and will constitute full compensation for all work associated with the anchor furnishing and installation. This includes but not limited of, providing all equipment, personnel, rods, testing/inspection, annulus grouting (calculated grout volume in core holes)and material to install anchors as shown on the contract documents.
Bid Item No. 10: 2.5” Diameter Anchor Install for Embedded Anchorage
Payment under Bid Item No. 10, 2.5” Diameter Anchor Install for Embedded
Anchorage will be made at the contract each price and will constitute full compensation for all work associated with the anchor installation. This includes, but is not limited to, providing all equipment, personnel, rods, testing/inspection, annulus grouting (calculated bond zone and free stressing length volume)and material to install anchors as shown on the contract documents.
Bid Item No. 11: 3” Diameter Anchor Install for Embedded Anchorage at Toe Block
Payment under Bid Item No. 11, 3” Diameter Anchor Install for Embedded Anchorage at Toe Block will be made at the contract each price and will constitute full
EXPLANATION OF BID ITEMS - PAGE 3
compensation for all work associated with the anchor installation. This includes, but is not limited to, providing all equipment, personnel, rods, testing/inspection, annulus grouting (calculated bond zone and free stressing length volume)and material to install anchors as shown on the contract documents.
Bid Item No. 12: Cementitious Grouting
Payment under Bid Item No. 12, for Cementitious Grouting will be made at the contract cubic feet price and will constitute full compensation for all work associated with pre-grouting core holes to fill and seal cracks and grouting not included in bid items No 9, 10, and 11.
Bid Item No. 13: Re-Drilling
Payment under Bid Item No. 13, for Re-Drilling will be made at the contract linear feet price and will constitute full compensation for all work associated with re-drilling after pre-grouting of cracks in the bore holes.
Bid Item No. 14: Water Stop
Payment under Bid Item No. 14 Water Stop, will be made at the contract job price and will constitute full compensation for all work associated with the water stop. This includes, but is not limited to, providing all equipment, personnel, and materials to core the bore hole, grout foundation material up to 2’ into monolith concrete, re-drill to base of core, and install the water stop as shown in the contract documents.
Bid Item No. 15: Lock Dewatering
Payment under Bid Item No. 15, Lock Dewatering, will be made at the contract dewatering the lock. This includes but is not limited to: providing all equipment; small cranes set on the lock wall to support personnel and small lifts into/out of the lock chamber, floating crane, associated floating plant, and portable air compressor for maneuvering, handling and placing stoplogs(five stoplogs will be placed in the downstream slot and six stoplogs will be placed in the upstream slot), setting three valve culvert bulkheads (upstream of the landside upstream valve and downstream of each downstream valve), portable hydraulic dewatering pumps, erection scaffolding for ingress/egress to the lock chamber; personnel; and miscellaneous materials. After lock chamber is dewatered, the contractor will maintain dewatered status by managing the dewatering pumps, addressing leakage from the stoplogs and other water intrusions. The contractor will remove debris from the work area in the lock chamber. The Government will provide the stoplogs and picking beams, on barges, and the valve bulkheads.
Bid Item No. 16: Epoxy Grout Injection of Cracks
Payment under Bid Item No. 16, Epoxy Grout Injection of Cracks will be made at the contract gallon price and will constitute full compensation for all work associated with the surface crack grouting. This includes, but is not limited to, providing all equipment, personnel, and materials to install epoxy grout as shown in the contract documents.
Bid Item No. 17: Concrete Toe Block
EXPLANATION OF BID ITEMS - PAGE 4
Payment under Bid Item No. 17, Concrete Toe Block, will be made at the contract the toe block installation. This includes, but is not limited to, providing all equipment, personnel, and materials to construct reinforced concrete toe block as shown in the contract documents. Toe block will be constructed underwater.
Bid Item No. 18: Polyurethane Grout Injection of Cracks
Payment under Bid Item No. 18, Polyurethane Grout Injection of Cracks will be made at the contract gallon price and will constitute full compensation for all work associated with the surface crack grouting. This includes, but is not limited to, providing all equipment, personnel, and materials to install polyurethane grout as shown in the contract documents.
Bid Item No. 19: MISC. Concrete Work
Payment under Bid Item No. 19, MISC. Concrete Work will be made at the contract concrete repair. This includes, but is not limited to, providing all equipment, personnel, and materials to repair miscellaneous concrete as shown in the contract documents.
Bid Option
Bid Item No. 20: Remove Riverside Filling Valve
Payment under Bid Item No. 20, Remove Riverside Filling Valve, will be made at the contract job price and will constitute full compensation for all work associated with removing the riverside filling valve, trunnion beam, connecting rods, A-frame, bellcrank, and bellcrank supports. This includes but is not limited to: providing all equipment; small cranes set on the lock wall to support personnel and small lifts into/out of the valve pit; floating crane and associated floating plant for pulling and handling the valve, trunnion beam, connecting rods, A-frame, bellcrank and supports. This bid option can be exercised and awarded up to 240 days after the notice to proceed in accordance with FAR 52.217-7.
- END OF SECTION –
SECTION 01 00 00
ADDITIONAL SPECIAL CONTRACT REQUIREMENTS
PART 1 GENERAL
AMENDMENT 0002
1.1 SCOPE OF WORK
Holt Lock and Dam is located approximately 135 miles above the confluence of the Black Warrior and Tombigbee Rivers, and about 6 miles upstream of the City of Tuscaloosa, Alabama. On 31 May 2024, it was found the lock monolith R14 had crack along the length of the monolith. On 28 September 2024 a steel bulkhead and bulkhead frame was installed at the culvert intake to isolate the cracked monolith from upper pool allowing safe operation of the lock.
The objective of this project is for the Contractor to provide all labor, materials, and equipment necessary to repair monolith R14 in accordance with the plans and specifications. Work includes but not limited to horizontal drilling, installing horizontal post tension anchor bars, internal pressure grouting, epoxy injection of surface cracks, installing water stops, underwater concrete placement, and dewatering the lock chamber at Holt Lock.
During the construction period, the contractor shall have access to the work area from 12:00 AM Monday through 11:59 PM Friday (Central Time). The lock shall be open to the public from 12:00 AM Saturday to 11:59 PM Sunday. To facilitate commercial and public lockage, the contractor shall remove all construction equipment from the lock chamber by 11:59 PM Friday. While the lock is open to commerical traffic, there shall be no protruding anchor rods or equpmintent into the lock chamber. See drawings for work barge staging area. The Goverment expects at a minimum the contractor to work two (2) ten (10) hour shifts per work day.
To install anchor rods below the tailwater elevation, the Government will close the lock for thirty (30) forty-five (45) days to allow the contractor to dewater Holt Lock. The contractor shall have access to the work area during the dewatering 24 hours a day 7 days a week. This thirty-day forty-five (45) day closure period includes the installation and removal of stoplogs, dewatering the lock chamber, and refilling it back to the lower pool. The contractor is responsible for setting and removing the upper and lower stoplogs, as well as setting and removing the upper land culvert bulkhead and both downstream lower bulkheads. The contractor must dewater the lock chamber, all culverts and laterals to facilitate Government inspections and Construction Quality Assurance. Additionally, the contractor must provide access at the upper end of the lock to the dewatered lock floor, culverts, and laterals. After contract award the Government will coordinate with the contractor to remove silt and devris from the lock chamber in front of monolith R-14. The Government will use its floating plant to remove silt and debris at the government expense.
Remaining silt and debris that the floating plant cannot be remove by the Government's floating plant will be at the contractor's expense. The Government will provide an updated hydro survey after silt and debris is removed to the contractor. The Goverment expects at a minimum the contractor to work two (2) twelve (12) hour shifts per work day.
SECTION 01 00 00 Page 1
Dewatering Process:
a. Place water level in chamber at upper pool position. Open the upstream miter gates. Leave the upstream valves in the open position, downstream valves in closed position, and downstream miter gates in closed position.
b. Move the floating plant (crane and upstream stoplog barge) immediately downstream of the upstream stoplog recess.
c. Install six upstream stoplogs. When finished, place the picking beam on the barge and disconnect it.
d. Place the two valve culvert bulkheads in the upstream recesses of the two upstream valves. Leave the upstream valves in the open position.
e. Use the floating plant to place a valve culvert bulkhead in the downstream recess of one of the two downstream valves.
f. Use the downstream valve that is not bulkheaded to drain the lock chamber down to the upper miter sill level.
g. Remove the 6-inch drain plugs upstream of the miter gate sill to drain the three feet of water between the stoplog sill and the miter gate sill.
The plugs must be removed under water.
h. Lower the lock chamber to lower pool elevation by opening the downstream valve that is not bulkheaded. Leave the valve in the open position.
i. Open the downstream valve that is bulkheaded. Leave the valve in the open position.
j. Use the floating plant to place a valve culvert bulkhead in the downstream recess of the remaining downstream valve.
k. Open the downstream miter gates and move the floating crane and barge with the picking beam out of the lock and downstream of the downstream stoplog recess
l. Install five downstream stoplogs.
m. Ensure all culvert valves are open, and begin pumping out the lock chamber.
n. Dewatering the lock chamber will require pumps mounted on a barge below the lower lock bulkheads (stoplogs). The barge mounted dewatering pumps should have capability of dewatering the lock in approximately 24 hours.
Due to configuration of the lock chamber floor, more pumps will be needed within the lock for lowering water enough to gain access to the lock culverts. Contractor should have some pumps to pump water trapped in mid-section of the lock across the lower miter sill area into the area just upstream of the lower stoplogs such that the dewatering pumps can remove from the lock chamber. In addition, the contractor may need additional pumps located within the lock laterals to pump water over the lock wall in order to allow access to the lock culver system via the lateral openings (down to 6-8" of water).
o. See O&M Manual for additional details. The O&M manual references
SECTION 01 00 00 Page 2 internal dewatering pumps. They are no longer in operation and contractor shall provide portable dewater pumps to be utilized. In addition, there are no cranes on site. Contractor will be responsible for providing cranes needed for dewatering.
After construction is complete and the lock chamber is filled to upper pool the contractor shall remove temporary bulkhead and set it on Government barge.
The contractor shall submit a dewatering plan for approval at least ninety
(90) days prior to dewatering. The optimum time to dewater the lock chamber is between June and August. The contractor should scheduled the dewatering in this time frame and no earlier then May 18. Please refer to drawings for further details.
During the dewatering process, the Government will be conducting work on the downstream miter gates. The contractor is required to coordinate with the Government for the lock dewatering activities. The Government will arrange its own access for the lower miter gates.
Riverside Filling Valve Removal (Bid Option)
If the contractor determines that removal of the Riverside Filling Valve is necessary to facilitate equipment installation within the culvert, the Government will proceed with executing Bid Option: Remove Riverside Filling Valve.
Components requiring removal for contractor to have full unimpeded access to culvert upstream of upper riverside valve:
1. Hydraulic Cylinder
2. Rocker Assembly
3. Rocker Support Beams
4. Upper & Lower Strut
5. Radius A-Frame
6. Valve Body
Steps for equipment removal
1. Ensure valve is in the fully closed position
2. Disconnect hydraulic cylinder from the Rocker Assembly by removing Piston Rod Pin (14/4-8)
3. Close hydraulic supply lines to cylinder, disconnect flexible lines from cylinder ports, and remove bearings (14/4-10)
4. Remove hydraulic cylinder and trunnion.
5. Disconnect Rocker Assembly from Rocker Support Beams by removing Main Rocker Pin (14/5-8) and disconnect from top strut by removing Upper Strut Pin (14/7-16).
6. Remove Rocker Assembly
7. Disconnect Rocket Support Beams by removing Support Pins (14/6-2) connecting to embedded anchorages.
8. Remove Rocker Support Beams
9. Disconnect Upper Strut from Radius A-Frame by removing Intermediate Strut Pin (14/8-6)
10. Remove Upper Strut
11. Disconnect Radius A-Frame by removing Hinge Pins (14/9-2) connecting to embedded anchorages.
12. Remove Radius A-Frame
13. Disconnect Lower Strut from Valve Body by removing Lower Strut Pin (14/7-13)
14. Remove Lower Strut
SECTION 01 00 00 Page 3
15. Disconnect Valve Body from Trunnion Beam by removing Trunnion Pins (13/3-6)
16. Remove Valve Body from recess
This list provides an outline of the sequence for component removal, not a detailed means and methods. During disassembly, the contractor is responsible for ensuring that all components are properly supported or tied off to prevent uncontrolled movement or falling once pins are removed. Some pins are secured with retainer rings or keeper bars, which must be removed prior to extraction.the contractor may resort to burning them out with a thermal lance—pending approval from the COR.
The Goverment will provide a barge for contractor to place components required to be removed from the valve pit. Installation of new vavlve and componets will be performed by others.
1.2 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
The Government will provide a partial notice to proceed (NTP) for the project that will allow the contractor to complete the work below. The partial NTP will provide approximately 90 days, for the start or complete these tasks prior to the issuance of a full NTP through a bilateral contract modification which will start the period of performance and establish the contract completion dates. After issuance of the full NTP, the Contractor shall be required to prosecute the work diligently, and complete the entire work ready for use not later than 270 calendar days after receipt of notice to proceed. This time stated for completion shall include final cleanup of the premises.
The proposed scope for the partial NTP is as follows:
Kick Off Meeting (This will go over contractual items and front-end information).
Site Visits Preconstruction Submittals Shop Drawings Product Data Design Data Test Reports Certifications Dewatering Plan Preliminary Schedule Submittal and procurement of long lead items
AMENDMENT 0002
1.3 LIQUIDATED DAMAGES--CONSTRUCTION
(a) If the Contractor fails to complete all of the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount $1,917.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed.
These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
SECTION 01 00 00 Page 4
1.4 SECURITY REQUIREMENTS
(a) All contractor employees, to include sub-contractor employees, requiring access to Army installations, facilities shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.
(b) The contractor and all associated sub-contractors shall brief all employees on the local iWATCH, Corps Watch, or See Something, Say Something program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after contract award.
(c) All contract employees, including subcontractor employees must obtain a T1 back ground check (standard background check).
(d) The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award." *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Site Plan; G,CD.
Hazard Analysis; G,SO.
Construction Sequence Plan; G,CD
Dirt and Dust Control Plan; G,CD
SD-07 Certificates
Certificates of Compliance: G,CD.
SECTION 01 00 00 Page 5
SD-11 Closeout Submittals
Contractor Prepared As-Built Drawings; G,CD
1.6 CONTRACT DRAWINGS, MAPS AND SPECIFICATIONS
a) The Contractor will be furnished one CD-ROM containing a reproducible copy of the advertised solicitation, including contract clauses, plans and specifications. The work shall conform to the specifications and the contract drawings listed in the technical provisions.
b) Omissions from the drawings or specifications, the mis-description of details of work which are manifestly necessary to carry out the intent of the drawings and specifications which are customarily performed shall not relieve the Contractor from performing such omitted or mis-described details of the work but they shall be performed as if fully and correctly set forth and described in the drawings and specifications.
c) The Contractor shall check all drawings furnished him immediately upon their receipt and shall promptly notify the Contracting Officer's Representative of any discrepancies. Figures marked on drawings shall in general be followed in preference to scale measurements. Large scale drawings shall in general govern small scale drawings. The Contractor shall compare all drawings and verify the figures before laying out the work and will be responsible for any errors which might have been avoided thereby.
d)The list of drawings and maps provided in the Index Sheet of the Plans for this solicitation are hereby incorporated by reference into these specifications. Any schedules included in the drawings are for the purpose of defining requirements other than quantities.
NOTE: Refer to the folio of drawings for the index of drawings in this solicitation.
1.7 PHYSICAL DATA
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
a. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys.
b. Weather Conditions. Weather conditions shall be investigated by the Contractor to determine the hazards likely to arise therefrom. Complete weather records and reports may be obtained from the local U.S. Weather Bureau.
c. Transportation facilities. The contractor shall investigate and make arrangements for transporting all materials and equipment to the site of work.
SECTION 01 00 00 Page 6
1.8 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
a. This provision specifies the procedure for determination of time extensions for unusually severe weather in accordance with the contract clause entitled "Fixed Price Construction". In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
b. The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
1. The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
2. The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.
MONTHLY ANTI CI PATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON ( 5) DAY WORK WEEK
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
11 8 6 4 4 5 6 4 4 3 4 8
Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally schedule work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day.
c. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph 2, above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the Contract Clause entitled "Default (Fixed Price Construction)".
1.9 TIME EXTENSIONS
Notwithstanding any other provisions of this contract, it is mutually understood that the time extensions for changes in the work will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements so delayed and that the remaining contract completion dates for all other portions of the work will not be altered and may further provide for an equitable readjustment
SECTION 01 00 00 Page 7 of liquidated damages under the new completion schedule.
1.10 CONTRACTOR PREPARED AS-BUILT DRAWINGS
a) General . In accordance with SPECIAL CONTRACT REQUIREMENT paragraph:
CONTRACT DRAWINGS, MAPS AND SPECIFICATIONS, the Government will furnish the Contractor on CD ROM one electronic set of solicitation drawing files and any amendments for use in preparation of as-built drawings by the Contractor. Copies of the drawings will be the responsibility of the Contractor. The As-Built drawings shall be a record of the construction as installed and completed by the Contractor. They shall include all the information shown on the contract set of drawings and a record of all deviations, modifications, or changes from those drawings, however minor, which were incorporated in the work, all additional work not appearing on the contract drawings, and all changes which are made after final inspection of the contract work. In the event the Contractor accomplishes additional work which changes the As-Built conditions of the facility after submission of the as-built drawings, the Contractor shall furnish revised and/or additional drawings as required to depict as-built conditions. The requirements for these additional drawings will be the same as for the as-built drawings included in the original submittal.
b) Red Line As-Built Drawings . The Contractor shall have on his staff, personnel to mark up a set of paper copy construction drawings to show the As-Built conditions. These As-Built marked copies shall be kept current and available on the jobsite at all times. All changes from the contract plans which are made in the work or additional information which might be uncovered in the course of construction shall be accurately and neatly recorded, as the events occur, by means of details and notes. The Contractor shall call attention to entries by redlining areas affected.
The red line As-Built will be jointly inspected for accuracy and completeness by the Contracting Officer's representative and a responsible representative of the Contractor prior to submittal of each request for payment. The Contracting Officer's Representative's approval of the current status of the as-built drawings shall be a prerequisite to the Contracting Officer's Representative's approval of request for progress payment and request for final payment under the contract. The drawings shall show the following information, but not be limited thereto:
(1) The location and description of any utility lines or other installations of any kind or description known to exist within the construction area. The location includes dimensions to permanent features.
(2) The location and dimensions of any changes within the structure.
(3) Changes in details of design or additional information obtained from working drawings specified to be prepared and/or furnished by the Contractor.
(4) All changes or modifications which result from the final inspection.
(5) Options: Where contract drawings or specifications allow options, only the option selected for construction shall be shown on the As-Built drawings.
c) Submittal of As-Built Drawings for Review and Approval : The Contractor shall participate in monthly review meetings with the Contracting Officer's Representative to show the progress made the preceding month and make all required changes. At time of final construction inspection, the
SECTION 01 00 00 Page 8
Contractor shall submit one copy of the red lined As-Built drawings to the Contracting Officer's Representative for his review and approval. The As-Built drawings shall be certified as to their correctness by the signature of an authorized representative of the Contractor. Upon Government approval of the Contractor's red-lined copy of the As-Built drawings, the Contractor shall prepare and provide one full size paper copy and four electronic sets of As-Built drawings by incorporating the red line marked up notations on the construction drawings into the electronic set of solicitation drawings and amendments. The electronic sets of the As-Built drawings shall be submitted on CD-ROM. The CD-ROM shall also contain the information contained on the project's Advertised CD-ROM including specifications and original contract drawings, Amendment, Design Analysis, and the original survey data. Submittals are to be submitted to the Contracting Officer's Representative not later than ten
(10) calendar days after project completion date. The Contracting Officer's Representative will provide the full size paper set of drawings and one copy of the CD-ROM to the BCE Office. For the remaining three copies of the CD-ROM, one copy shall be kept at the Resident Office, one copy shall be provided to CESAM-EN-D (Project Architect/Engineer) and the other provided to CESAM-EN-DW (Project Support Section).
d) Final Electronic Drawing Format
(1) The solicitation drawing files and any amendments thereto will be furnished to the Contractor in electronic format. The solicitation drawing files have been prepared in Microstation or AutoCAD R13 format.
The drawing file indicates the format which the drawing was developed.
The Contractor shall utilize AutoCAD R14 or R2000 to revise/redraft each solicitation drawing and/or amendment drawing to reflect all changes made during construction as indicated by the red line marked up notations on the construction drawings. Revisions/redrafting shall match the font styles, sizes, and formats; line weights/thicknesses and styles/types; and all other drafting elements used on the solicitation drawing/amendments.
All elements must be incorporated into each as-built drawing file; the use of reference files shall not be permitted.
(2) All revisions made to the solicitation drawings and/or amendment drawings to reflect changes made during construction shall be flagged and shall have the revision block completed as follows. The entry in the description column of the revision block shall read "AS-BUILT". The date of the revision and one approving initial from a responsible person within the Contractor's Firm shall also be included in the revision block. Above the drawing title block the drawing will be labeled in bold letters "AS-BUILT". The flagged changes and revision block format shall be in accordance with the examples shown in the Mobile District Design Manual located on the Internet at http://www.sam.usace.army.mil/Missions/MilitaryMissions/Engineering/DesignGuides/ MobileDistrictDesignGuides/MobileDistrictDesignManual.aspx
The Contractor shall also furnish a revised index of drawings to match the actual design drawings. The drawing title blocks shall be in a uniform format to match the requirements as specified in the Design Manual.
e) Payment : No separate payment will be made for the as-built drawings required under this contract, and all costs in connection there-with will be considered a subsidiary obligation of the Contract.
SECTION 01 00 00…
This is the start of the file's text. The full file is on GovTribe.