About this opportunity
The U.S. Army Corps of Engineers Sacramento District seeks design-build construction services to remove and replace the roof of Area D of Building 225 at Hill Air Force Base in Utah, and renovate the office space. Services shall include civil, architectural, structural, mechanical and electrical work supporting roof replacement and office renovations. Proposals are due April 4, 2023, with evaluation considering past performance, technical approach, management approach, and price. A mandatory site visit will be held February 28, 2023 to tour the project site.
There is no set-aside designation for this opportunity. The NAICS code is 236220 for commercial and institutional building construction and the PSC code is Z2BZ for repair or alteration of airfield structures. The estimated value of construction is between $25-100 million to be performed at Hill Air Force Base in Utah. The solicitation number is W9123823R0004 and interested parties should visit the provided link on the Procurement Integrated Enterprise Environment website for full proposal submission details and requirements.
Notice text
5 versions
Update #5 · Latest ·
The U.S. Army Corps of Engineers (USACE) Sacramento District (SPK) requires design-build construction services to remove and replace the roof of Area D of Building 225 (B225) at Hill Air Force Base (HAFB) in Utah, in accordance with terms of the contract and other attachments. Work will also include renovating office in B225.NAICS Code: 236220, Commercial and Institutional Building ConstructionPSC: Z2BZ, Repair or Alteration of Other Airfield StructuresSBA Size Standard: $39.5 millionIn accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be between $25M to $100MDesign and construction shall include all civil, architectural, geotechnical, structural, utilities, landscaping, security, mechanical, electrical, demolition, and communications work to support the necessary construction. Site Visit Agenda and Sign In Sheet attached.
Amendment 0001 is issued to update site visit information provided in FAR Clause 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) - ALTERNATE I (FEB 1995)
Amendment 0002 is issued to post Attachment C as the original posting for Attachment C in PIEE was corrupted.
Amendment 0003 is issued change the past performance relevancy from $60M to between $25M to $80M.
Amendment 0004 is issued to change the past performance relevancy square footage (SF) from 500,000 SF to 50,000 SF or larger.
Amendment 0005 is issued to delete wage determination UT20220083-04 and replace with wage determination WD UT20220083-05. The proposal due date and time remains unchanged.
*Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123823R0004' to obtain more details.*
Update #4 ·
The U.S. Army Corps of Engineers (USACE) Sacramento District (SPK) requires design-build construction services to remove and replace the roof of Area D of Building 225 (B225) at Hill Air Force Base (HAFB) in Utah, in accordance with terms of the contract and other attachments. Work will also include renovating office in B225.NAICS Code: 236220, Commercial and Institutional Building ConstructionPSC: Z2BZ, Repair or Alteration of Other Airfield StructuresSBA Size Standard: $39.5 millionIn accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be between $25M to $100MDesign and construction shall include all civil, architectural, geotechnical, structural, utilities, landscaping, security, mechanical, electrical, demolition, and communications work to support the necessary construction.
Amendment 0001 is issued to update site visit information provided in FAR Clause 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) - ALTERNATE I (FEB 1995)
Amendment 0002 is issued to post Attachment C as the original posting for Attachment C in PIEE was corrupted.
Amendment 0003 is issued change the past performance relevancy from $60M to between $25M to $80M.
Amendment 0004 is issued to change the past performance relevancy square footage (SF) from 500,000 SF to 50,000 SF or larger.
Amendment 0005 is issued to delete wage determination UT20220083-04 and replace with wage determination WD UT20220083-05. The proposal due date and time remains unchanged.
*Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123823R0004' to obtain more details.*
Update #3 ·
The U.S. Army Corps of Engineers (USACE) Sacramento District (SPK) requires design-build construction services to remove and replace the roof of Area D of Building 225 (B225) at Hill Air Force Base (HAFB) in Utah, in accordance with terms of the contract and other attachments. Work will also include renovating office in B225.NAICS Code: 236220, Commercial and Institutional Building ConstructionPSC: Z2BZ, Repair or Alteration of Other Airfield StructuresSBA Size Standard: $39.5 millionIn accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be between $25M to $100MDesign and construction shall include all civil, architectural, geotechnical, structural, utilities, landscaping, security, mechanical, electrical, demolition, and communications work to support the necessary construction.
Amendment 0001 is issued to update site visit information provided in FAR Clause 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) - ALTERNATE I (FEB 1995)
Amendment 0002 is issued to post Attachment C as the original posting for Attachment C in PIEE was corrupted.
Amendment 0003 is issued change the past performance relevancy from $60M to between $25M to $80M.
Amendment 0004 is issued to change the past performance relevancy square footage (SF) from 500,000 SF to 50,000 SF or larger.
*Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123823R0004' to obtain more details.*
Update #2 ·
Amendment 0001 is issued to update site visit information provided in FAR Clause 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) - ALTERNATE I (FEB 1995). The U.S. Army Corps of Engineers Sacramento District requires design-build construction services to remove and replace the roof of Area D of Building 225 at Hill Air Force Base, Utah in accordance with terms of the contract and other attachments. Work will also include renovating office space in Building 225. NAICS Code: 236220, Commercial and Institutional Building Construction. PSC: Z2BZ, Repair or Alteration of Other Airfield Structures. SBA Size Standard: $39.5 million. In accordance with DFAR 236.204(ii) the estimated magnitude of construction is expected to be between $25 million and $100 million. Design and construction shall include all civil, architectural, geotechnical, structural, utilities, landscaping, security, mechanical, electrical, demolition, and communications work to support the necessary construction. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123823R0004' to obtain more details.*
Update #1 ·
The U.S. Army Corps of Engineers Sacramento District requires design-build construction services to remove and replace the roof of Area D of Building 225 at Hill Air Force Base, Utah in accordance with terms of the contract and other attachments. Work will also include renovating office space in Building 225.NAICS Code: 236220, Commercial and Institutional Building ConstructionPSC: Z2BZ, Repair or Alteration of Other Airfield StructuresSBA Size Standard: $39.5 millionIn accordance with DFAR 236.204(ii) the estimated magnitude of construction is expected to be between $25 million and $100 million.Design and construction shall include all civil, architectural, geotechnical, structural, utilities, landscaping, security, mechanical, electrical, demolition, and communications work to support the necessary construction. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123823R0004' to obtain more details.*
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Hill AFB Building 225 Area D Renovation | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| F-35 Composite Repair and Training Facility / F-35 Maintenance Facility, Hill Air Force Base, Utah | ENDIST Sacramento | No set-aside | |
| HAFB Multiple Award Construction Contract V (MACC V) | Air Force Sustainment Center | Total Small Business | |
| SABER V Hill AFB | Air Force Sustainment Center | Competitive 8(a) | |
| WWYK260004 - repair structural integrity, B1134, post 34 & north wall | Air Force Sustainment Center | Total Small Business | |
| REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE RELATED TO SEVERAL UPCOMING PROJECTS at WRIGHT-PATTERSON AFB, OHIO | ENDIST Louisville | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity