High speed internet service
Closed Solicitation Posted
- Solicitation number
- W9124D25QA068
- Agency
-
MICC Fort Sam Houston
Mission and Installation Contracting Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 517111 Wired Telecommunications Carriers
- Place of performance
- Fort Knox, Kentucky 40121, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Human Resources Command at Fort Knox, Kentucky is seeking a high-speed internet service contract through the Department of the Army Materiel Command Mission and Installation Contracting Command. The solicitation (W9124D25QA068) requires a comprehensive wireless internet service with 2Gbps unlimited data speed for 63 designated locations across 62 offices and a parade field. Technical requirements include installing 61 managed access points, a network aggregation switch, PoE switches, a managed router service portal, and a co-managed firewall. Proposals are due by April 7, 2025, at 10:00 AM ET, with offers required to remain valid for 60 days. The contract will utilize a firm-fixed-price arrangement with a 60-day phase-in period to ensure minimal disruption to government operations.
The contract is set aside exclusively for small businesses, specifically targeting Women-Owned Small Business (WOSB) vendors in the Wired Telecommunications Carriers category (NAICS 517111). The incumbent contractor is Charter Communications Operating, LLC, and the current facility averages approximately 260 devices daily. The contract will cover a five-year period from September 30, 2025, through September 29, 2030, consisting of a base year and four option years. Performance requirements include maintaining 95% reliability, providing next-business-day service response, and offering 24/7/365 technical support. The place of performance is Fort Knox, Kentucky, with the facility being a nearly 100-year-old building constructed of concrete, brick, and drywall, requiring approximately 111 feet of conduit installation and specialized network infrastructure deployment.
Notice text
2 versions
Update #2 · Latest ·
This requirement will be to provide High-Speed Internet in support of the U.S. Army Human Resources Command, Fort Knox, KY with a period of coverage of 30 September 2025 through 29 September 2030.
Amendment 0001 is issued to respond to questinos from industry and extend the reponse due ate as outlined in the attached amendment with attachment.
Update #1 ·
This requirement will be to provide High-Speed Internet in support of the U.S. Army Human Resources Command, Fort Knox, KY with a period of coverage of 30 September 2025 through 29 September 2030.
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Provide, install and maintain an internet service with a minimum of 1GB up and download speeds in WA | Defense Information Systems Agency | Total Small Business | |
| Cable TV, Wired and Wireless Internet for Fort Drum, NY | MICC Fort Drum | No set-aside | |
| Internet Services | Department of the Army | No set-aside | |
| NMRLC WIFI Service | Naval Supply Systems Command | No set-aside | |
| Provide, install and maintain an internet service with a minimum of 1GB up and download speeds in NJ | Defense Information Systems Agency | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity