About this opportunity

The Federal Contract Opportunity is for construction services to complete the Grand Island Staircase Project at the Hiawatha National Forest in Michigan. The project includes the removal of two staircases, converting these staircases to viewing platforms, repair of disturbed areas at Waterfall Beach and Mather Beach, and the installation of a new staircase with an aluminum section at the Hemlock location. The work is expected to commence on 06/03/2024 and be completed by 09/30/2024, with an estimated project value between $100,000 and $250,000.

Products and Services to be provided:

  1. Removal of two staircases at Waterfall Beach and Mather Beach.
  2. Conversion of these staircases to viewing platforms.
  3. Repair of disturbed areas at Waterfall Beach and Mather Beach.
  4. Removal of the existing staircase at the Hemlock location.
  5. Installation of a new staircase with an aluminum section at the Hemlock location.

Notice text

2 versions

Update #2 · Latest ·

AMENDMENT 0001 - POSTED 8/28/2023

This project is for the construction services to complete the Grand Island Staircase (s) Great American Outdoor Act project to include the removal of two staircases, converting these staircases to viewing platforms, and the repair of disturbed areas at Waterfall Beach and Mather Beach. The work will also include the removal of the existing staircase, the installation of a new staircase with an aluminum section that can be raised during the offseason, shoreline stabilization, and construction of drainage swales at the Hemlock location. 

PROJECT LOCATION 
The project area is located on the west side of Grand Island National Recreation Area in Munising, Michigan. 


PROJECT MAGNITUDE 
The magnitude of this project is: Between $100,000 and $250,000. 


PERIOD OF PERFORMANCE 
Estimated Period of Performance: 06/03/2024 through 09/30/2024. 

Update #1 ·

This project is for the construction services to complete the Grand Island Staircase (s) Great American Outdoor Act project to include the removal of two staircases, converting these staircases to viewing platforms, and the repair of disturbed areas at Waterfall Beach and Mather Beach. The work will also include the removal of the existing staircase, the installation of a new staircase with an aluminum section that can be raised during the offseason, shoreline stabilization, and construction of drainage swales at the Hemlock location. 

PROJECT LOCATION 
The project area is located on the west side of Grand Island National Recreation Area in Munising, Michigan. 


PROJECT MAGNITUDE 
The magnitude of this project is: Between $100,000 and $250,000. 


PERIOD OF PERFORMANCE 
Estimated Period of Performance: 06/03/2024 through 09/30/2024. 

Files

File Type Posted
AMENDMENT 0001-J3 FS Supplemental Specifications-Final Copy.docx DOCX document
AMENDMENT 0001 - SF30.pdf PDF
RFQ-12445523Q0141.pdf PDF
J2 Statement of Work.pdf PDF
J4 Project Plans.pdf PDF
J1 DBA WD MI0030 Alger County.pdf PDF
J3 Forest Service Supplemental Specifications.docx DOCX document

Notice history

Notice Type Posted
Hiawatha National Forest - GAOA Grand Island Staircase & Mather Beach and Waterfall Beach Improvements Award Award Notice
This notice Latest solicitation Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors