HI STP SR30(1) Lahaina Bypass 1B-2 (DESIGN-BUILD)
Award Notice Posted
- Solicitation number
- DTFH6815R00009
- Agency
-
Federal Highway Administration
Department of Transportation
- Awarded
- to Hawaiian Dredging Construction Company, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- DTFH6816C00024 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Maui County Lahaina, Hawaii 96761, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
THIS TWO-PHASE DESIGN-BUILD PROJECT IS ADVERTISED ON AN UNRESTRICTED (FULL AND OPEN) BASIS. A GOVERNMENT-LED SITE VISIT IS SCHEDULED TO BE HELD ON OCTOBER 21, 2015. DETAILS REGARDING THIS NON-MANDATORY SITE VISIT WILL BE INCLUDING IN THE RFQ.
Project Location:
The Lahaina Bypass 1B-2 project is located on the island of Maui in Hawaii. The project is approximately 4 miles southeast of the town of Lahaina.
Project Description:
This project is the second phase of work on the Lahaina Bypass. The previous phase was completed by the Hawaii Department of Transportation.
This phase starts at the southeastern termini of the previous bypass phase (Lahaina Bypass 1B-1) and continues approximately 2.7 miles to the southeast to the proposed southern terminus back onto The Honoapilani Highway (State Route 30). The preliminary design is approximately 30-percent complete and assumes the following major work items and approximate quantities:
Line Item Unit Estimated Quantity
Roadway Excavation: 70,000 CUYD
Roadway Embankment: 500,000 CUYD
Pavement: 163,000 SQYD
Major Crossings
(drainage and secondary roadways greater than 20-foot span): 4 EACH
Minor Crossings
(drainage less than 20-foot span) 10 EACH
A two-phase design-build selection process is the solicitation approach. The work will take a place in an environmentally sensitive area and will require context sensitive design and construction approaches. Environmental clearance and right-of-way acquisitions are expected to be complete prior to the award of a design-build contract.
D-B Estimate Range:
$30-40.0 million
Update #1 ·
THIS IS NOT A REQUEST FOR QUALIFICATIONS (RFQ) OR REQUEST FOR PROPOSAL (RFP). PLANS AND SPECS ARE NOT YET AVAILABLE. THIS TWO-PHASE DESIGN-BUILD PROJECT WILL BE TENTATIVELY ADVERTISED (RFQ ISSUANCE) ON OCTOBER 1, 2015 ON AN UNRESTRICTED (FULL AND OPEN) BASIS. A GOVERNMENT-LED SITE VISIT IS TENTATIVELY SCHEDULED TO BE HELD ON OCTOBER 21, 2015. DETAILS REGARDING THIS NON-MANDATORY SITE VISIT WILL BE INCLUDING IN THE RFQ.
Project Location:
The Lahaina Bypass 1B-2 project is located on the island of Maui in Hawaii. The project is approximately 4 miles southeast of the town of Lahaina.
Project Description:
This project is the second phase of work on the Lahaina Bypass. The previous phase was completed by the Hawaii Department of Transportation.
This phase starts at the southeastern termini of the previous bypass phase (Lahaina Bypass 1B-1) and continues approximately 2.7 miles to the southeast to the proposed southern terminus back onto The Honoapilani Highway (State Route 30). The preliminary design is approximately 30-percent complete and assumes the following major work items and approximate quantities:
Line Item Unit Estimated Quantity
Roadway Excavation: 70,000 CUYD
Roadway Embankment: 500,000 CUYD
Pavement: 163,000 SQYD
Major Crossings
(drainage and secondary roadways greater than 20-foot span): 4 EACH
Minor Crossings
(drainage less than 20-foot span) 10 EACH
A two-phase design-build selection process is the solicitation approach. The work will take a place in an environmentally sensitive area and will require context sensitive design and construction approaches. Environmental clearance and right-of-way acquisitions are expected to be complete prior to the award of a design-build contract.
Anticipated Award Schedule:
Request for Qualifications- October 2015
Request for Proposals (short list firms only)- December 2015
Award of Design-Build Contract- Spring 2016
Approximately 2 years; construction completion by spring 2018.
D-B Estimate Range:
$30-40.0 million
Files
| File | Type | Posted |
|---|---|---|
| Q-A _revised_11-4-15.pdf | ||
| Site_Visit_Agenda.pdf | ||
| Alternative_No._3_Profile.pdf | ||
| Site_Visit_Sign-in_Sheet.pdf | ||
| Q-A _revised_10-26-15.pdf | ||
| DTFH6815R00009.pdf |