DTFH6815R00009.pdf

PDF 2 MB Posted

Attached to
HI STP SR30(1) Lahaina Bypass 1B-2 (DESIGN-BUILD)
Solicitation number
DTFH6815R00009
Issued by

About this file

Request for Qualifications

View the file

Other files

File Type Posted
Q-A _revised_11-4-15.pdf PDF
Alternative_No._3_Profile.pdf PDF
Site_Visit_Sign-in_Sheet.pdf PDF
Site_Visit_Agenda.pdf PDF
Q-A _revised_10-26-15.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hawaii Department of Transportation

Central Federal Lands Highway Division

12300 West Dakota Avenue Lakewood, CO 80228

October 1, 2015

HI STP SR 30(1) Lahaina Bypass 1B-2 Design-Build Request For Qualifications (RFQ)

Solicitation Number: DTFH6815R00009

The Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration (FHWA), in partnership with Hawaii Department of Transportation (HDOT), is conducting a "two phased" Design-Build (D-B) selection process for the Lahaina Bypass 1B-2 project in on the island of Maui, Hawaii. Under this Notice, CFLHD is soliciting D-B firms/teams (Offeror) to participate in Phase-One – Request for Qualifications (RFQ) of the selection process. This is NOT a Request for Proposal. A solicitation package is not available.

This RFQ is being issued concurrently with the development and review of the environmental documentation that will determine the final Scope of Work and other project requirements. Documentation of National Environmental Policy Act (NEPA) compliance is anticipated to be complete prior to issuing the Request For Proposals (RFP). Any work described herein is subject to adjustment as a result of the environmental process and other decisions of the Government.

A non-mandatory site visit will be held during Phase-One. Interested parties will meet at the HDOT Maui District Office at 10 A.M. on October 21, 2015. The HDOT Maui District Office is located in Kahului, HI, approximately 0.1 miles northeast of the intersection of Haleakala Hwy and Keolani Place. The HDOT Maui District address is as follows:

650 Palapala Drive Kahului, Maui, Hawaii 96732

The North American Industry Classification System (NAICS) code for this acquisition is 237310 Highway, Street, and Bridge Construction.

Statements of Qualifications (SOQ) will only be accepted from Offerors intending to provide complete services required under the Contract. Responses from individual engineering, construction, or consultant firms not offering to provide all required services will be deemed non-responsive and will not be accepted.

Attachments (6):

1 - Project Description 2 - Procurement Process Overview 3 - Phase-One (RFQ) Evaluation Criteria 4 - Phase-Two (RFP) Evaluation Criteria 5 - Submittals 6 - Draft RFP

Design-Build Solicitation Request for Qualifications

ATTACHMENT 1

PROJECT DESCRIPTION

The Lahaina Bypass 1B-2 phase starts at the southeastern termini of the previous bypass phase (Lahaina Bypass 1B-1) at Hokiokio Road and continues approximately 2.7 miles to the southeast to the proposed southern terminus at the Honoapiilani Highway (State Route 30). The current design assumes the following major work items and approximate quantities:

Line Item Unit Estimated Quantity Roadway Excavation CUYD 70,000 Roadway Embankment CUYD 500,000 Major Crossings (drainage and secondary roadways greater than 20-foot span) EACH 4 Minor Crossings (drainage less than 20-foot span) EACH 10

The work will take a place in an environmentally sensitive area and will require context sensitive design and construction approaches. Environmental clearance and right-of-way acquisitions are expected to be complete at the issuance of the RFP.

The primary objective of the proposed contract is to alleviate projected congestion on the Honoapiilani Highway (State Route 30), specifically through the small town of Lahaina. The project will relocate the terminus of the Lahaina Bypass to provide a long-term solution to shoreline erosion and coastal hazards, address the potential future increase in traffic congestion within the project corridor, and help to achieve long range transportation planning goals. The following efficiencies are also anticipated:

• Improve overall safety

• Increase capacity

• Eliminate roadside hazards

• Provide adequate clear zones

• Enhance operational function/Improve traffic flow

• Improve emergency vehicle response times

• Accommodate current and future traffic flows

There are two (2) right-of-way acquisitions required within the limits of this project; one private landowner and Maui County. The right-of-way acquisition is expected to be complete prior to the issuance of the RFP.

The design and construction cost for the Project is estimated to be between $30,000,000 and $40,000,000.

Design-Build Scope of Work (SOW): The SOW for this Project includes Design and Construction, Project Management, and Quality Assurance/Quality Control (QA/QC), including Materials Sampling and Testing, and includes, but is not limited to, the following:

Design Work

• Design surveys

• Roadway design

• Crossing design

• Hydraulic design

• Geotechnical design

• Pavement design

• Safety design

• Soil erosion and sediment control design and dust control

• Temporary traffic management and control including public safety

• Design QA/QC

• Obtain Permits

Construction Work:

• Construction of roadway, roadway drainage, safety features and crossings

• Installation of sediment, erosion and dust control measures

• Implement permit requirements

• Installation of temporary traffic control facilities and devices

• Construction QA/QC, including Materials Sampling and Testing

ATTACHMENT 2

PROCUREMENT PROCESS OVERVIEW

CFLHD is using a two-step procurement process to select a qualified D-B firm/team to deliver the Project. The issuance of this RFQ is part of the first step to solicit information from interested Offerors in the form of a Statement of Qualifications (SOQ).

CFLHD anticipates the following procurement milestone dates. This schedule is subject to revision by addenda to this RFQ, to information in the final RFP, and by addenda to the RFP.

Action Dates Phase-One: Request for Qualifications RFQ issued October 1, 2015 Site Visit (optional) October 21, 2015 Deadline for submitting RFQ questions October 30, 2015 Deadline for CFLHD response to questions November 4, 2015 SOQs due November 12, 2015 Short-listed Offerors notified December 9, 2015* Phase-Two: Request for Proposals RFP issued (to short-listed Offerors only) December 11, 2015* Alternative Technical Concepts (ATCs) Due January 22, 2016 * Notification of acceptance/rejection of ATCs February 10, 2016* Proposals Due March 6, 2016* Source Selection Complete April 3, 2016* Notice of Award issued April 17, 2016* Notice to Proceed issued May 7, 2016* *Dates are subject to change

Phase-One: Request for Qualifications

CFLHD is issuing this RFQ for interested and qualified D-B firms/teams to submit a SOQ.

The Evaluation Board will review and evaluate the SOQs submitted by all Offerors, based on how well each meets the evaluation criteria.

A “shortlist” of no more than five of the most highly qualified Offerors will be selected and invited to participate in Phase-Two: Request for Proposals. Once the shortlist has been established, Offerors not shortlisted will be notified in a timely manner and offered the opportunity for a debriefing.

It is not the intent of CFLHD to receive specific design or engineering recommendations regarding the Project as part of the Phase-One process. Offerors should limit their SOQ and questions to the information required by this notice, and other information that may be relevant to the qualifications and experience of the Offeror. No reimbursement will be made for any of the Offerors costs associated with the preparation of the SOQ.

Phase-Two: Request for Proposals

The short-listed D-B firms/teams will be sent a Request for Proposal (RFP), which will outline the remainder of the selection process requirements. The RFP will contain the requirements necessary for the short-listed D-B firms/teams to submit both a Technical Proposal and a Price Proposal.

After receipt of the Phase-Two Technical Proposal and Price Proposal, an Evaluation Board will conduct a "best value" analysis. Attachment 4 contains the criteria to be used in the Phase- Two evaluation process. The Evaluation Board will submit their recommendation to the Source Selection Authority. Award of one firm fixed price contract is anticipated.

To promote innovation by the Offerors and to maintain flexibility of design and construction, CFLHD may allow submission of Alternate Technical Concepts (ATCs) in Phase-Two.

Each Offeror that submits a technically acceptable, but unsuccessful, Proposal will be entitled to receive payment for work products submitted with its Proposal. A proposal is deemed technically acceptable if it complies with all RFP requirements and contains no deficiencies as defined by FAR

15.001. The amount of the stipend payment will be $100,000.

ATTACHMENT 3

PHASE-ONE (RFQ) EVALUATION CRITERIA

Phase-One Evaluation Criteria: Offerors’ Statements of Qualifications will be evaluated using the following criteria, listed in descending order of importance:

Criteria 1: Design-Build Understanding and Technical Approach.

The Evaluation Board will review and evaluate each Offeror’s understanding of tasks involved in a D-B project and the Offeror’s approach to managing, designing and constructing the Project.

Submit a general description of the tasks involved in the D-B process and the approach the Offeror will take for design and construction administration. Include a discussion on how the Offeror intends to maximize the benefits of the D-B process. Discuss the involvement of the design members of the Offeror's team during construction including how design and construction members will interface during construction. Also discuss how review comments will be incorporated and submittals will be addressed during construction.

Describe how the team will coordinate with CFLHD throughout the D-B process.

Describe your Project Management Plan to manage design and construction, project costs and schedule.

Identify potential risk factors, special issues or problems and their impact on the delivery of the Project. Explain the approach to mitigate those risks, issues or problems.

Criteria 2: Technical Qualifications.

The Evaluation Board will review and evaluate the Offerors individual personnel qualifications and experience, including technical and geographical similarities between the referenced experience/qualifications and the work described in this solicitation.

Submit documentation for each key individual indicating their specialized experience within the past five (5) years and their qualifications for performing Design-Build projects or for projects with technically the same or similar roadway, geotechnical, hydraulic, structural, erosion control, permitting, project management, construction, and QA/QC work as required by the Project.

In addition to the specific information requested in this section, include a resume for each Key Personnel in an appendix to the SOQ. All key personnel shall be available throughout the duration of the contract.

(NOTE: If one individual will be fulfilling multiple roles during the Project, list how that individual meets the experience and qualifications separately for EACH position).

PROJECT MANAGEMENT KEY PERSONNEL

• Design-Build Project Manager – The Offeror’s overall manager and principal point of contact for activities throughout the entire design-build process.

• Project QA/QC Manager – The Offeror’s single point of responsibility for managing quality through design and construction, and who is responsible for all quality assurance and quality control procedures and decisions. The Project QA/QC Manager may also function as the Design QA/QC Manager and/or Construction QA/QC Manager, as qualified.

• Safety Manager – The Offeror’s representative in charge of all aspects of the safety program, with authority to halt work if warranted by unsafe conditions at the Project site.

DESIGN & CONSTRUCTION KEY PERSONNEL

• Designer of Record – The Offeror’s single point of responsibility for all design procedures and decisions. This individual shall be a registered, licensed Professional Engineer in the State of Hawaii.

• Geotechnical Engineer – The Offeror’s engineer who is in charge of all geotechnical aspects of the Project. This individual shall be a registered, licensed Professional Engineer.

• Hydraulic Engineer – The Offeror’s engineer who is in charge of all hydraulic aspects of the Project. This individual shall be a registered, licensed Professional Engineer.

• Structural Engineer – The Offeror’s engineer who is in charge of all structural aspects of the Project. This individual shall be a registered, licensed Professional Engineer.

• Design QA/QC Manager – The QA/QC representative responsible for implementing the Design QA/QC program referenced in Criteria 3.

• Construction Superintendent – The Offeror’s on-site authorized representative in charge of the construction work.

• Project/Construction Engineer – The Offeror’s individual responsible for engineering decisions, judgment and construction work on the Project.

• Construction QA/QC Manager – The QA/QC representative responsible for implementing the Construction QA/QC program referenced in Criteria 3.

Offeror’s obligation to keep Key Personnel intact:

In connection with the services covered by this procurement process, Key Personnel will be limited to the individuals and firms that are specifically identified in the Offeror’s SOQ. The successful Offeror’s Key Personnel will be incorporated into the awarded contract. The selected D-B firm/team shall obtain the Contracting Officer’s written consent before making any substitution of the Key Personnel.

Criteria 3: Quality Management Outline.

The Evaluation Board will review and evaluate each Offeror’s approach to quality control to assess the soundness and reasonableness of the Offeror's planned QA/QC for quality of design, materials, and construction products.

Submit an outline of the system to be used to manage the design and construction schedule, and the management system to control the quality of materials and constructed products. Describe how the quality management system(s) will interact between the design and construction functions and how it will be updated and monitored. Also describe how the system will address non-compliance issues of design and construction and how the system will facilitate strategic interaction with CFLHD.

Submit evidence of construction work within the last five (5) years, indicating that quality work was completed on schedule and within budget.

Criteria 4: Design and Construction Capability and Resources.

The Evaluation Board will review and evaluate information about the Offeror’s past performance in the design and construction of roadway projects based on the Project Organizational Structure, and on Design and Construction Performance for projects similar in size and scope.

PROJECT ORGANIZATIONAL STRUCTURE

Submit the proposed D-B team’s organizational structure. Identify major participants, their roles in the Project and their percentage of work hours committed to the Project. Identify how each partner and subcontractor interacts and fits into the overall D-B team makeup and their experience working together on past projects. Submit documentation that shows the direct experience of the Offeror, joint venture partners, and/or firms/teams related by an ownership agreement. Also include experience of key subcontractors that the Offeror intends to utilize in the execution of this Project. The successful Offeror’s organizational structure will be incorporated into the awarded contract.

DESIGN PAST PERFORMANCE

Provide information on at least three (3), but no more than five (5), roadway projects performed in the past five (5) years. Identify projects where the lead construction firm and the lead design firm have worked together on the same project in a Design-Build relationship. If any D-B project is provided as a reference that was not performed together by the lead design firm and lead construction firm on this Project, then the Offeror shall identify the construction firm with whom it was contracted for the design of each such project. Provide information for each project regarding the following:

• At award and at completion--cost(s) and justifications for changes.

• At award and at completion--contract completion date(s) and justification for changes.

o Recovery strategies utilized to realize schedule, avoid increase cost(s) to owner, and maintain quality requirements.

CONSTRUCTION PAST PERFORMANCE

Provide information on at least three (3), but no more than five (5), roadway projects performed in the past five (5) years. Identify any projects where the lead construction firm and the lead design firm have worked together on the same project in a Design-Build relationship. If any D-B project is provided as a reference that was not performed together by the lead design firm and lead construction firm on this Project, then the Offeror shall identify the design firm with whom it was contracted for the construction of each such project. Provide information for each project regarding the following:

• At award and at completion--cost(s) and justifications for changes.

• At award and at completion--contract completion date(s) and justification for changes.

o Recovery strategies utilized to realize schedule, avoid increase cost(s) to owner, and maintain quality requirements.

ATTACHMENT 4

PHASE-TWO (RFP) EVALUATION CRITERIA

See Section II of attached DRAFT RFP

ATTACHMENT 5

SUBMITTALS

Phase-One Submittals: Statement of Qualifications

Offerors shall use the Standard Form (SF) 330, Part I, U.S. Government Architect-Engineer Qualifications, as the basis for their SOQ. It is not necessary to complete Part II of the SF 330.

SF 330’s are available on the U.S. General Services Administration website at:

http://www.gsa.gov/forms/. Although the SF 330 is formatted for Architect-Engineer and Related Services, the construction elements of the Offeror’s SOQ may also be included on the SF 330. The SOQ shall be bound and tabbed with the major headings. Each SOQ shall include a table indicating page numbers where Phase 1 evaluation criteria 1-4 can be found. Design and Construction projects used for evaluation criteria 3 and 4 should be included in Section F of the SF 330. Section H of the SF 330 should be used to address any evaluation criteria not addressed elsewhere.

Each Offeror shall provide one (1) original AND six (6) copies of the completed SOQ. The SOQ shall contain a cover letter and no more than twenty (20) pages typed, one side only, on 8.5" x 11" paper. Pages must be numbered consecutively. Pages beyond the 20 page limit will not be considered by the panel during the scoring process. The cover letter and resumes of Key Personnel (Section E of the SF 330) will not be included in the page count and therefore should not be numbered.

Please do not submit any letters of reference, pre-printed brochures or other marketing materials.

If dividers or photos are used and contain project-specific information they will be counted as pages. All SOQs shall be written using Times New Roman font with a size no smaller than 11-point (text, figures and tables). The SOQ shall address each of the evaluation criteria in the same order as listed in Attachment 3.

SUBMIT ONE ORIGINAL AND SIX (6) COPIES (PAPER COPIES ONLY) OF YOUR

RESPONSE BY 2:00 PM Local Time, November 12, 2015 at the address below.

ATTN: Joe Wilson (Solicitation Number: DTFH6815R00009)

MAILROOM—DO NOT OPEN

Central Federal Lands Highway Division 12300 West Dakota Avenue Lakewood, CO 80228

Questions concerning this Request for Qualifications shall be submitted via e-mail to CFLContracts@dot.gov.

Only e-mail inquiries will be considered. No hard copy or oral inquiries will be considered.

http://www.gsa.gov/forms/ mailto:CFLContracts@dot.gov

Phase-One Submittals: Bonding Capacity

Submit a bonding agent letter verifying the Offeror’s ability to obtain bonding of up to $40 million for a single contract. The bonding agent letter will not count towards the page limit.

ATTACHMENT 6

DRAFT RFP

REQUEST FOR PROPOSAL

SOLICITATION NUMBER:

PROJECT NUMBER: HI STP SR 30(1)

PROJECT NAME: LAHAINA BYPASS 1B-2

This solicitation cites Standard Specifications for Construction of Roads and Bridges on

Federal Highway Projects, FP-14 US Customary Units

ISSUING OFFICE:

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 W. DAKOTA AVENUE, SUITE 360

LAKEWOOD, CO 80228

Web site: http://www.fbo.gov E-mail: CFLContracts@dot.gov

DRAFT

PROJECT HI STP SR 30(1)

LAHAINA BYPASS 1B-2

LOCATION LAHAINA, MAUI, HI

COUNTY MAUI

STATE HAWAII

LENGTH 2.7 MILES

TYPE OF IMPROVEMENT Design and construction of bypass roadway and termini intersections, bridges, drainage, structural section, safety features, and sediment and erosion control.

TABLE OF CONTENTS

Pre-Bid Information ......................................................................................................... A-i

Solicitation, Offer and Award ......................................................................................... A-1

Bid Schedule ................................................................................................................... A-3

Buy American and Hazardous Materials ........................................................................ A-4

Instructions to Offerors ................................................................................................... A-6

Evaluation Criteria/Proposal Requirements .................................................................. A-11

Contract Terms and Conditions .................................................................................... A-17

Solicitation Provisions .....................................................................................................B-5

Contract Clauses ..............................................................................................................C-1

Davis Bacon Wage Determination.................................................................................. D-1

Division 100 ..................................................................................................................... E-1 Division 150 ................................................................................................................... E-36 Division 200 ................................................................................................................... E-52 Division 300 ................................................................................................................... E-59 Division 400 ................................................................................................................... E-59 Division 500 ................................................................................................................... E-59 Division 600 ................................................................................................................... E-61 Division 700 ................................................................................................................... E-67

SPECIAL CONTRACT REQUIREMENTS (SCRs)

The following Special Contract Requirements amend and supplement the Standard Specification for Construction of Roads and Bridges on Federal Highway Projects

A-i

PRE-BID INFORMATION

It is the responsibility of the bidder to verify that this solicitation document, including the plans, are complete as listed in the table of contents and the index to sheets.

This solicitation and subsequent contract are governed by the Federal Acquisition Regulations (FAR), agency supplemental regulations, and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14 US Customary Units (FP-14).

The FP-14 was utilized for the design of this project. Hard copies of the FP-14 will not be provided to bidders. The FP-14 is available electronically at http://flh.fhwa.dot.gov/resources/specs/ or may be purchased by contacting Bob Rosenblatt at ARC Western, telephone number 303-785-2520 or email bob.rosenblatt@e-arc.com.

Applicable FAR provisions and clauses in this RFP are incorporated by reference or full text. FAR provisions and clauses incorporated by reference can be accessed on the Internet at https://www.acquisition.gov/far/.

Notice of SAM Registration – you must register in the System for Award Management (SAM – replaced CCR) prior to award of a contract resulting from this solicitation. Failure to register prior to contract award may require award to the next successful registered offeror. See FAR Subpart 4.1103©. Register online at www.sam.gov.

Representations and Certifications – This solicitation is issued under NAICS 237310 – Highway, Street & Bridge Construction with a small business size standard of $36.5 million. If your average annual gross receipts for the past 3 years are above $36.5 million, you are a large business for this solicitation. If they are below $36.5 million you are a small business. Please complete the certification listed in paragraph (b) of FAR Provision 52.204-8 Annual Representation and Certifications on Page B-7. Your small business information is pulled into the Online Representations and Certifications Application (ORCA) website from the System for Award Management (SAM). Please include NAICS 237310 in your SAM. Before submitting bids, please ensure you have completed your annual representations and certifications electronically at the SAM website at www.sam.gov.

Vets100 Reporting: - The Contractor must complete the report if required. See reporting requirements at: www.dol.gov/vets/programs/fcp/main.htm.

• My firm had a qualifying Federal Contract in 2015 and has complied with the reporting requirements.

• My firm did not have a qualifying Federal Contract in 2015 and is therefore exempt from the reporting requirements

This Solicitation Contains a Price Evaluation Factor - The Government will apply a factor of 10% to an apparent low bid submitted by a large business when we also receive a bid from a certified HUBZone small business concern. The 10% factor does not apply to apparent low bids

DRAFT

http://flh.fhwa.dot.gov/resources/specs/ mailto:bob.rosenblatt@e-arc.com https://www.acquisition.gov/far/ http://www.sam.gov/ http://www.sam.gov/ http://www.dol.gov/vets/programs/fcp/main.htm

A-ii submitted by small businesses. See FAR Clause 52.219-4 Notice of price evaluation preference for HUBZone small business concerns.

In the event this full and open competition results in a contract award to a qualified HUBZone SBC after a price evaluation preference, FAR Clause 52.236-1, Performance of Work by the Contractor does not apply.

§126.700 of the Code of Federal Regulations (Title 13, Part 126, Subpart G), stated below, will replace the performance of work requirements stated in the above mentioned FAR clause.

A qualified HUBZone SBC receiving a contract under this solicitation for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs. This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs. A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs.

ATTENTION: Minority, Women-owned, and Disadvantaged Business Enterprises (DBEs). The Department of Transportation (DOT), offers working capital financing and bonding assistance for transportation related contracts. DOT's Bonding Assistance Program (BAP) offers bid, performance and payment bonds on contracts up to $1,000,000. DOT's Short-Term Lending Program (STLP) offers lines of credit to finance accounts receivable. Maximum line of credit is $500,000 with interest at the prime rate. For further information, call (800) 532-1169. Internet address:

http://osdbuweb.dot.gov.

The Contractor is fully responsible to verify that all data is correct when an offer is submitted.

Failure to properly update your data may cause the offer to be rejected.

II. Post Award Information.

Subcontracting - FAR Clause 52.219-8, Utilization of Small Business Concerns states that Prime Contractors afford small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns the maximum practicable opportunity to participate in performing contracts let by any Federal agency.

FAR Clause 52.219-9, Small Business Subcontracting Plan, Alternate I, requires that the large business concern who is the successful low bidder on a Federal project with an anticipated award amount exceeding $1 million, is required to submit a subcontracting plan prior to contract award.

The subcontracting plan expresses goals in terms of percentages of total planned subcontracting dollars for the use of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns as subcontractors. To view and download a sample plan for subcontracting requirements, visit http://www.cflhd.gov/contracting/construction/ReferenceLinks.cfm. If the apparent successful low bidder fails to submit an acceptable subcontracting plan acceptable to the CO within 7 days of bid opening, that bidder may be ineligible for award of the contract.

Prime Contractors, who are large businesses, are encouraged to post sources sought notices at the Small Business Administration’s Subcontracting Network (SUB-NET) http://web.sba.gov/subnet/

DRAFT

http://osdbuweb.dot.gov/ http://www.cflhd.gov/contracting/construction/ReferenceLinks.cfm http://web.sba.gov/subnet/

A-iii so that small businesses can identify opportunities in their areas of expertise. The use of SUB-Net fulfills the requirements set forth in Federal Acquisition Regulation (FAR) 5.206, Notice of Subcontracting Opportunities, for contractors and subcontractors to post notices and thereby increase competition for subcontracts.

A list of currently known business concerns owned and controlled by socially and economically disadvantaged individuals and/or women-owned small business concerns that have indicated an interest in participating in highway construction is available at http://www.sam.gov

Insurance requirements - See Subsection 107.05 of the FP-14.

http://www.sam.gov/

A-1

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration or Repair)

1. SOLICITATION NO.

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

HI STP SR30(1)

7. ISSUED BY:

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS DIVISION

12300 WEST DAKOTA AVENUE, SUITE 167

LAKEWOOD, COLORADO 80228

CODE: 69050001 8. ADDRESS OFFER TO:

JOE WILSON, CONTRACT SPECIALIST

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS DIVISION

12300 WEST DAKOTA AVENUE, SUITE 167

LAKEWOOD, COLORADO 80228

9. FOR INFORMATION CALL

SEE PAGE A-3

A. NAME:

SEE PAGE A-3

B. TELEPHONE NO. (Include area code)

SEE PAGE A-3

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:

ROADWAY CONSTRUCTION PROJECT IN STRICT ACCORDANCE WITH:

1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)

2. DEPARTMENT OF LABOR, DAVIS BACON MINIMUM WAGE RATES

3. SPECIAL CONTRACT REQUIREMENTS

4. PLANS

5. BID SCHEDULE

6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY

PROJECTS

7. SUBCONTRACTING PLAN (IF APPLICABLE)

See Subsection 104.04 of the FP-14 for governing order of precedence

11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award notice to proceed. The performance period is mandatory negotiable. *Refer to Subsection 108.01 as amended in the Special Contract Requirements.

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.) YES NO

12B. CALENDAR

DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8. by 2:00 p.m. (hour) local time on xx/xx/xx (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is is not required.

C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-102, STANDARD FORM 1442 (REV. 4-85), Prescribed by GSA, FAR (48 CFR) 53-236-1(e)

X

A-2

OFFEROR (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

DUNS NO.

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing with calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS

SEE INDIVIDUAL BID SCHEDULE(S)

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO

SIGN OFFER (Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 27

(4 copies unless otherwise specified)

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT

TO □ 15 U.S.C. 637( ) □ 41 U.S.C. 253(c)( )

26. ADMINISTERED BY CODE:

27. PAYMENT WILL BE MADE BY

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 W. DAKOTA AVENUE, SUITE 167

LAKEWOOD, COLORADO 80228

I. CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.)

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by

(a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON

AUTHORIZED TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE 31B. UNITED STATES OF AMERICA

BY

31C. AWARD

DATE

A-3

Item No. Pay Item No. Description Quantity Unit Unit Price Amount

A0100 66801-0000 DESIGN-BUILD

ALL LPSM $ LPSM $

Bid Schedule Schedule:A Schedule Type:Base

Project No: HI STP SR 30(1)

Project Name: Lahaina Bypass 1B-2

Submitted by: Schedule Total:

A-4

BUY AMERICAN -CONSTRUCTION MATERIALS

UNDER TRADE AGREEMENTS

It is understood and agreed that the materials and components listed in Subparts 25.1 and 25.2 of the FAR are a part of this contract and are deemed to be Domestic Construction Material for the purposes of this contract.

NOTE TO CONTRACTOR:

The following information and any applicable supporting data is required for evaluation of requests under FAR Clause 52.225-11 Paragraph (c) & (d) and FAR Provision 52.225-12 Paragraph (b).

Material and/or Component

Construction Material Description

Unit of Measure

Quantity

*Cost Delivered to Job Site

Foreign Construction Material

Comparable Domestic Material

Material and/or Component

Construction Material Description

Unit of Measure

Quantity

*Cost Delivered to Job Site

Foreign Construction Material

Comparable Domestic Material

[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include all applicable supporting information.]

A-5

HAZARDOUS MATERIALS

As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data - Alternate I, the apparent low bidder must submit prior to award a Material Safety Data Sheet (MSDS) for all hazardous materials that the bidder identifies in paragraph (b) of the FAR clause and defined under the latest version of Federal Standard No. 313.

Hazardous Material

Identification Number

USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS

Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA) of 1976, as amended (42 U.S.C. 6901 et seq.), requires Federal, State, and local procuring agencies using appropriated Federal funds to purchase items composed of the highest percentage of recovered materials practical. Use of recovered materials is strongly encouraged on Federal Lands Highway Projects. Highway construction items covered by the Environmental Protection Agency’s Comprehensive Guidelines for Procurement of Products Containing Recovered Materials include fly ash, ground granulated blast furnace slag, traffic barricades, traffic cones, hydraulic mulch and compost for mulch.

Use of fly ash and ground granulated blast furnace slag and construction materials containing fly ash and ground granulated blast furnace slag on Federal Lands Highway Projects:

• It is the policy of the United States Government that fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag shall have maximum practicable opportunity for incorporation into its construction projects.

• The Contractor agrees to investigate the use of fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag to the fullest extent consistent with the efficient performance of this contract. Both the contractor and the subcontractors are urged to seek out suppliers of fly ash and ground granulated blast furnace slag, cement and concrete containing fly ash and ground granulated blast furnace slag and to solicit bids for these materials.

• Names of firms that supply fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag are available from the American Coal Ash Association and the National Slag Association.

A-6

I. INSTRUCTIONS TO OFFERORS

Description of Project The Lahaina Bypass 1B-2 phase starts at the southeastern termini of the previous bypass phase (Lahaina Bypass 1B-1) at Hokiokio Road and continues approximately 2.7 miles to the southeast to the proposed southern terminus at the Honoapiilani Highway (State Route 30). The preliminary design assumes the following major work items and approximate quantities:

Line Item Unit Estimated Quantity

Roadway Excavation CUYD 70,000

Roadway Embankment CUYD 500,000

Major Crossings (drainage and secondary roadways greater than 20-foot span) EACH 4

Minor Crossings (drainage less than 20-foot span) EACH 10

The work will take a place in an environmentally sensitive area and will require context sensitive design and construction approaches.

The primary objective of the proposed contract is to alleviate projected congestion on the Honoapiilani Highway (State Route 30), specifically through the small town of Lahaina. The project will relocate the terminus of the Lahaina Bypass to provide a long-term solution to shoreline erosion and coastal hazards, address the potential future increase in traffic congestion within the project corridor, and help to achieve long range transportation planning goals. The following efficiencies are also anticipated:

• Improve overall safety

• Increase capacity

• Eliminate roadside hazards

• Provide adequate clear zones

• Enhance operational function/Improve traffic flow

• Improve emergency vehicle response times

• Accommodate current and future traffic flows

The design and construction cost for the Project is estimated to be between $30,000,000 and $40,000,000.

The intent of the contract is to procure all design and construction services necessary to complete of the work described. Furnish all professional services, design, labor, material, equipment, tools, transportation, and supplies necessary to complete the work in accordance with project requirements, as specified in this RFP, and as supplemented by the Design-Builder’s proposal.

A-7

Procurement Schedule

The following milestone dates have been identified. This schedule is subject to change at any time by

CFLHD.

Action Dates

Phase-Two: Request for Proposals RFP issued (to short-listed Offerors only) December 11, 2015* Alternative Technical Concepts (ATCs) Due January 22, 2016 * Notification of acceptance/rejection of ATCs February 10, 2016* Proposals Due March 6, 2016* Source Selection Complete April 3, 2016* Notice of Award issued April 17, 2016* *Dates are tentative target dates

Procurement Process

Method of Procurement

CFLHD is seeking Phase-Two Technical and Price Proposals to design and construct the Project in accordance with the two-phased selection process as prescribed in FAR 36.3. Only those Offerors who have been selected in Phase One will be eligible to submit Phase Two proposals.

Price Proposal submittal. It is the intent of the Government to award the contract based on initial proposals without discussions or clarifications. However, if deemed necessary by CFLHD, at its sole discretion, discussions with all Offerors may be held and final proposals submitted (see FAR 15.306 – 15.307). CFLHD will award the contract (if at all) to the responsible Offeror determined to provide the “Best Value” to the Government using the Tradeoff process described in FAR 15.101-1.

Examination of RFP Documents

Each Offeror shall be solely responsible for examining the RFP documents, including all amendments issued, and for informing itself with respect to any conditions that may in any way affect the amount or nature of proposal, or the performance of the work. Failure of the Offeror to so examine and inform itself shall be its sole risk and no relief for error or omission will be provided by CFLHD.

Interpretation of RFP Documents

The Offeror shall be responsible for reviewing the RFP documents and any subsequent amendments and for requesting clarification or interpretation of any material discrepancy, deficiency, ambiguity, error or omission, or of any provision which the Offeror otherwise fails to understand. Such requests may occur at anytime during the initial proposal preparation period, but not later than 14 days prior to the PROPOSAL

DUE DATE.

Any questions concerning interpretation of the contract documents must be in writing pursuant to FAR Clause 52.214-6, Explanation to Prospective Bidders. All questions must be submitted in writing via email to the following address: CFLContracts@dot.gov.

If CFLHD determines, in its sole and absolute discretion, that such interpretation or clarification requires a change in RFP documents, CFLHD will prepare and issue an amendment. CFLHD will not be bound by, and the Offeror shall not rely on, any oral communication regarding the RFP documents, and shall not rely on any communication except written communications as described in the RFP documents. If the Offeror has

A-8 meetings or discussions with other agencies or entities during the procurement phase, the Offeror shall be responsible for verifying this information with CFLHD by submitting written questions to CFLContracts@dot.gov.

Questions and answers will be emailed to each offeror.

Amendments

CFLHD reserves the right to revise the RFP documents any time before award of contract. Such revisions, if any, will be announced by amendments to the RFP documents and supplements to amendments.

Amendments will be emailed to each offeror.

CFLHD will notify the primary point of contact identified by each offeror during Phase One, on form SF-30, of any questions/answers, notices, amendments or other information via email. No other notifications will be made.

If any amendments significantly affect this RFP, as determined by CFLHD, a new PROPOSAL DUE DATE may be set. The announcement of such new date will be included in the amendment. The Offerors shall acknowledge receipt of all amendments in accordance with FAR Clause 52.215-1, Instructions to Offerors- Competitive Acquisitions. Failure to acknowledge amendments, in block 19 of the SF 1442 by the designated date and time specified in the solicitation may result in rejection of your proposal.

Government Furnished Information The Government is furnishing electronic access to of each of the following documents/information with this

RFP:

• Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP- 14, US Customary Units. http://flh.fhwa.dot.gov/resources/pse/specs/fp-14.htm

• Federal Lands Highway Project Development and Design Manual, Volume 1, with supplements.

http://www.wfl.fhwa.dot.gov/design/manual/

• CFLHD Standard Drawings and Details (World Wide Web), Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP 14 http://www.cflhd.gov/resources/design/constructspecs/ under Construction Specifications

• Right of Way Dedication of Deed documentation

• Final Environmental Assessment (Appendix A)

• Jurisdictional Wetlands, Other Waters, and Riparian Delineation Report (Appendix B)

The Government makes no claims or warranties, expressed or implied, and take no responsibility for the completeness or accuracy of the information referenced above. The contractor is responsible for developing its own survey and mapping information, as necessary during the proposal phase and as needed during the delivery phase.

Best Value Selection Procedures

CFLHD will use a Best Value selection procedure as defined in FAR 15.1. Each Board member will individually provide a rating for each criterion in the Technical Proposal. The consensus method will then be used by the Board members to determine a final numerical rating for each evaluation criterion. The final numerical ratings will then be summed to determine the Overall Technical Score for each Offeror’s

DRAFT

mailto:CFLContracts@dot.gov http://flh.fhwa.dot.gov/resources/pse/specs/fp-14.htm http://www.cflhd.gov/resources/design/constructspecs/ http://www.cflhd.gov/resources/design/constructspecs/

A-9

Technical Proposal.

Price Proposals will not be opened until the Overall Technical Score for each offeror is finalized. The Evaluation Board will consider the benefits associated with the Technical Scores against the cost of the Contract Bid Price for each Proposal. In the assessment, technical and price will be considered approximately equal using the Tradeoff process per FAR 15.101-1. The Best Value Proposal will be the one that, based on the assessment, provides the most project benefits to CFLHD for the money spent.

The Board members may request input from CFLHD and other government specialists to fully understand the Offeror’s technical and cost information. The Board may issue requests for clarification to Offerors as necessary to resolve ambiguities or inconsistencies in the Proposals. CFLHD may award a contract to an Offeror, based upon its Initial Technical and Price Proposal without further discussion.

Alternative Technical Concepts

Offerors may submit Alternative Technical Concepts (ATCs) for CFLHD review and approval or rejection of the ATCs. CFLHD intends to meet, one-on-one, with each Offeror submitting an ATC.

Proposal Discussions (if deemed necessary)

By issuing this RFP, it is the intent of the Government to award this contract without discussions. Based upon Initial Technical Ratings and Initial Price Proposals, CFLHD will make a decision whether to enter into a contract award or begin discussions with all Offerors within the competitive range. In the event it is not feasible for CFLHD to make award on the basis of the Initial Price and Technical Proposals, discussions with Offerors will be conducted in accordance with FAR 15.306 (d).

Offerors would be provided a reasonable opportunity to submit any price, technical or other revisions to their Proposal that may result from discussions, if they occur. Discussions shall not be used to provide details of other proposals to the Offerors.

Final Proposal Submittal (if deemed necessary) If discussions are held, at the conclusion of discussions, each offeror will be allowed to submit a final proposal at a date to be specified during discussions. All other submittal requirements will be the same as the initial proposal requirements.

Award The Proposal offering the Best Value Project to the Government will be forwarded by the Evaluation Board to the Source Selection Authority (Contracting Officer) for consideration and action. All Offerors submitting Proposals will be notified in writing of the results of the evaluation process. Offerors not selected for award may request a debriefing as described below.

Stipend Each Offeror that submits a technically acceptable, but unsuccessful, Proposal will be entitled to receive payment for work…