Green River Lake Upgrade Flooring in Visitor Center & Project Office

Closed Solicitation Posted

Solicitation number
W912QR24Q0086
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238330 Flooring Contractors
PSC
7220 Floor Coverings
Place of performance
Campbellsville, Kentucky 42718, United States

Notice details come from SAM.gov. Updated .

About this opportunity

Paragraph 1:

The U.S. Army Corps of Engineers, Louisville District is seeking a contractor to remove and install new flooring in the Visitor Center and Project Office at Green River Lake in Campbellsville, Kentucky. The scope of work includes removing and disposing of approximately 4,900 square feet of existing carpeting, repairing the subfloor, and installing new carpet, vinyl plank flooring, and ceramic tile in specified areas. The contractor will be responsible for all planning, administration, supervision, and compliance with applicable requirements. The contract will be awarded to the lowest priced, responsible offeror based on the solicitation requirements.

Paragraph 2:

This procurement is set aside 100% for small businesses under NAICS code 238330 - Flooring Contractors. Bids are due by July 31, 2024, and the contract performance period is 120 calendar days after the notice to proceed. The solicitation includes a base bid and two option items for additional wall work. A single site visit is highly recommended for the contractor to verify existing conditions. The total estimated value of this contract is not provided.

Notice text

2 versions

Update #2 · Latest ·

The scope of work includes removal and disposal of existing carpeting throughout the Visitor Center & ProjectOffice (approximately 4900 sq ft). Contractor to repair any cracks, pits, and prepare existing subfloor surfaces. Contractor to install specified floor coverings to specified areas herein, please see section 4 for floor covering specifications. All provided measurements are approximate and the contractor will be responsible for obtaining measurements during the site visit. The contractor’s work and responsibility will include all planning, programing, administration, management, supervision, communications, and inspection necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State, and Local laws and regulations. Due to the nature of the office setting, flooring removal and installation will be coordinated with the Park Manager to minimize the disruption of the office staff. The contractor will be responsible for moving office furniture and equipment to facilitate the flooring installation. Computers, printers, phones, and other technology equipment will be the responsibility of the USACE employees to move. All work will be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. Please see Exhibit A for Visitor Center & Project Office building plan.

The amendment has been added to extend the due date of responses from 07-24-2024 to 07-31-2024

Update #1 ·

The scope of work includes removal and disposal of existing carpeting throughout the Visitor Center & ProjectOffice (approximately 4900 sq ft). Contractor to repair any cracks, pits, and prepare existing subfloor surfaces. Contractor to install specified floor coverings to specified areas herein, please see section 4 for floor covering specifications. All provided measurements are approximate and the contractor will be responsible for obtaining measurements during the site visit. The contractor’s work and responsibility will include all planning, programing, administration, management, supervision, communications, and inspection necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State, and Local laws and regulations. Due to the nature of the office setting, flooring removal and installation will be coordinated with the Park Manager to minimize the disruption of the office staff. The contractor will be responsible for moving office furniture and equipment to facilitate the flooring installation. Computers, printers, phones, and other technology equipment will be the responsibility of the USACE employees to move. All work will be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. Please see Exhibit A for Visitor Center & Project Office building plan.

Files

File Type Posted
W912QR24Q0086 amendment.pdf PDF
W912QR24Q0086.pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
Flooring Requirement Contract Solicitation Grand Forks AFB, North Dakota 58205, United States · NAICS 238330 Air Mobility Command Total Small Business
United states coast guard ketchikan alaska new carpet installation Ketchikan, Alaska 99901, United States · NAICS 238330 — No set-aside
Z1DA--Project # 528A6-26-607 Replace Flooring for Rm. 140 B76 | Bath VAMC NAICS 236220 Veterans Integrated Service Network 2 No set-aside
Asphalt Services at Carr Creek Lake NAICS 237310 ENDIST Louisville No set-aside
MT bftc carpet replacement conference room NAICS 238330 — Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors