Green Peter Reservoir Generator Purchase and Install
Closed Pre-Solicitation Posted
A newer solicitation was posted. See the latest solicitation from .
- Solicitation number
- W9127N23B0010
- Agency
- ENDIST Portland US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238290 Other Building Equipment Contractors
- PSC
- Z2KA Repair Or Alteration Of Dams
- Place of performance
- Sweet Home, Oregon 97386, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Portland District intends to issue an Invitation for Bids for the purchase and installation of a 250kW diesel engine generator at the Green Peter Powerhouse located near Sweet Home, Oregon. This is to provide an alternate power source during the annual deep drawdown period for downstream fish passage when the powerhouse is left with a single electrical feed. The IFB will require the generator, transfer switch, installation of cables and conduits, and training and testing services. Bids are due approximately 30 days following advertisement of the solicitation on July 14, 2023.
This 100% set-aside procurement has a NAICS code of 238290 for the generator installation work valued between $250,000 to $500,000. The small business size standard is $22 million in average annual receipts. Points of contact are provided for both the procurement and for small business assistance. The deep drawdown period requiring temporary power lasts from early October through February each year.
Notice text
The U.S. Army Corps of Engineers Portland District intends to issue a firm-fixed price (FFP), Invitation for Bids (IFB) No. W9127N23B0010 for Green Peter Reservoir Generator Purchase and Installation. This requirement is to provide an alternate power source for the Green Peter Powerhouse at Green Peter Dam located on the Middle Santiam River near Sweet Home, Oregon.
The Green Peter Powerhouse is located on the Middle Santiam River near Sweet Home, Oregon. Construction was finished in 1968. The Army Corps of Engineers will draw down Green Peter Dam Reservoir in the fall for a downstream fish passage called a “deep drawdown”, which will leave the powerhouse with a single electrical power feed. The deep drawdown will start in early October until February without impacting refill at or above the spillway for spring fish passage spill. EL. above the regulating outlets (ROs) which will be the primary fish passage route. This project is designed to provide a mobile diesel engine-generator for the deep drawdown periods and installation of associated cables, conduits, and auxiliary equipment necessary to connect the mobile diesel engine-generator to the powerhouse.
The U.S. Army Corps of Engineers, Portland District, has a requirement for the Green Peter Injunction Deep Drawdown Temporary Power Supply Project. The Scope of Work for this project includes but is not necessarily limited to the following:
a. Provide new 250kW Diesel Engine Generator.
b. Provide a new two-source Manual Transfer Switch.
c. Modify 600V, 2000A fish unit bus to SQ Switchgear to terminate in the new Manual Transfer Switch.
d. Reroute Diesel Generator power cable and conduit to new Manual Transfer Switch.
e. Provide status indication from Manual Transfer Switch and EDG to SCADA and modify existing control to
incorporate Manual Transfer Switch.
f. Perform necessary training, O&M, commissioning and testing.
The solicitation will be available 14 July 2023 with bids due approximately 30 days after advertising.
This is a 100% small business set-aside. The NAICS code for this procurement is 238290. The small business size standard is $22 million. The magnitude of construction is between $250,000 to $500,000.
Point of contact for this procurement is Andrew Sprys, at andrew.j.sprys@usace.army.mil and Andrea Smothers, at andrea.k.smothers@usace.army.mil.
Point of contact for small business questions or assistance is the Portland District Deputy for Small Business, Carol McIntyre at Carol.A.McIntyre@usace.army.mil.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Green Peter Reservoir Generator Purchase and Install | Solicitation | |
| Green Peter Reservoir Generator Purchase and Install | Pre-Solicitation | |
| Green Peter Reservoir Generator Purchase and Install Phase II | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities