Great Smoky Mountains REHAB CABLE MILL WASTEWATER
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 140P5324R0009
- Agency
-
Southeast Region
National Park Service, Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is for a construction contract to improve the wastewater system in the Cable Mill area of Great Smoky Mountains National Park. The National Park Service seeks to replace an existing septic tank and sand filter system with a new septic tank, dosing tank, storage tank and subsurface wastewater disposal field. Interested contractors can obtain the full solicitation on or after March 1, 2024 on SAM.gov, which will include specifications, drawings and instructions for proposal submission. Proposals are due by March 1, 2024.
This requirement has been set aside for total small business and falls under NAICS 237110 for water and sewer line construction. The value is estimated between $500,000 to $800,000 and work must be completed by August 30, 2024. Bid options will allow for phasing of the proposed work. The project is located in Townsend, Tennessee.
Notice text
Great Smoky Mountains National Park
ACTION: Pre-Solicitation Notice
PRE-SOLICITATION NUMBER: 140P5324R0009
CLASSIFICATION CODE: Y1ND – CONSTRUCTION OF SEWAGE AND WASTE FACILITIES The NAICS Code for this requirement is 237110 – Water and Sewer Line and Related Structures Construction $45
POINT OF CONTACT:
Geraldine Larsen, Contract Specialist, geralding_larsen@nps.gov
PLACE OF PERFORMANCE: Great Smoky Mountains National Park
PLACE OF PERFORMANCE POSTAL CODE: 37882
PLACE OF PERFORMANCE STATE AND COUNTY: Townsend TN, Blount County
Title of Project: Wastewater System Improvement Project, Cable Mill Area
Description: It is proposed to abandon the existing septic tank and sand filter system and install a new septic tank. The new septic tank will discharge to a new dosing tank, which in turn will pump to a new subsurface wastewater disposal field. An additional storage tank will also be installed adjacent to the dosing tank to provide additional storage capacity during peak flows. Due to funding limitations, not all of the proposed work will be done as part of this contract. Several bid options are provided to provide for phasing of the proposed work.
NEW SEPTIC TANK AND DRAIN FIELD:
Contractor shall provide and install a new septic tank, dosing tank, storage tank, distribution boxes, and drain field as illustrated on the proposed construction plans. The proposed drain field will consist of two adjacent areas, each of which will contain 15 drain lines at 135 linear feet each. All clearing and grading necessary for the proposed work shall be included in the scope of work.
DEMOLITION:
The existing septic tank shall have a bolted lid installed or the existing lid can be welded closed. The sewer lines entering the tank shall be exposed and capped on both sides of the tank – note that the lines are very shallow, and easily exposed.
AREA RESTORATION:
All areas disturbed by the contractor shall be restored to original condition. A gravel road will need to be crossed with the proposed force main pipe. The road will need to be replaced to original conditions in accordance with the plans and specifications. Areas outside of gravel road areas shall be graded, and hydro-seeded with the approved Park seed mix. Areas outside of the immediate work area shall not be disturbed.
GENERAL:
The National Park Service (NPS), Great Smoky Mountains National Park
The solicitation will be issued electronically on the website at https://www.sam.gov/. Proposal documents will be available for download in Microsoft Word, HTML, Microsoft Excel, and Adobe PDF; Specifications will be available in Adobe PDF format; and drawings will be available in PDF format. Please Note: Paper copies of the solicitation will not be made available.
Vendors can search for opportunities and award history on https://www.sam.gov/ without registering. Registering provides the opportunity to receive notifications; this is a tool of convenience only and does not serve as a guarantee of notification. Interested vendors and plan holders are required to visit the website periodically to check for amendments and other changes to the synopsis or solicitation documents. Prospective offerors desiring to conduct business with the DOI are required to have an active registration in the Systems for Awards Management (SAM) at https://www.sam.gov/. You are also required to have a Unique Entity number in order to conduct business with the Federal Government.
This pre-solicitation announcement is not a solicitation document, but pre-notice of an upcoming solicitation. Specific instructions on submitting your proposal will be contained in the solicitation documents to be issued on or after the date listed below.
Proposed Solicitation Issue Date: 3/01/2024
NO phone calls accepted.
36.204 Disclosure of the magnitude of construction projects: Between $ 500,000 to $800,000.
Completion Date: 8/30/2024
It is the policy of the government to provide maximum practicable opportunities in its acquisitions to small business, veteran-owned small business, small disadvantaged business, and women-owned small business concerns. Such concerns must also have the maximum practicable opportunity to participate as subcontractors in the contracts awarded by any executive agency, consistent with efficient contract performance. All offerors are strongly encouraged to contact their local Small Business Administration Office, to post their need for qualified subcontractors at http://www.sba.gov.
Construction Contraction Administration
Federal Acquisition Regulation (FAR) 36.211(b) requires agencies provide description of policies and procedures that apply to definitization of equitable adjustments for change orders under construction contracts and data on the time required to definitize equitable adjustments for change orders under construction contracts. This information can be found at: https://www.doi.gov/pam/acquisition/policy/constructioncontract.
NO PHONE CALLS ACCEPTED
Files
| File | Type | Posted |
|---|---|---|
| B01_Synopsis_PreSolitNotice_1.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Great Smoky Mountains REHAB CABLE MILL WASTEWATER | Award Notice | |
| Great Smoky Mountains REHAB CABLE MILL WASTEWATER | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| GRSM 321788 - Oconaluftee River Trail | — | No set-aside | |
| Kelly Pierson OSS | Indian Health Service | Total Small Business | |
| Oconaluftee Waterline Replacement | Forest Service | Total Small Business | |
| White Horse Hill National Game Preserve Water Main Extension | — | Total Small Business | |
| HAVO 326181 Rehabilitate Rainshed&Water Treatment | National Office | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity