Great Smoky Mountains NP REHAB BALSAM/HEINTOOGA WASTEWATER
Special Notice Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 140P5323R0015
- Agency
-
Southeast Region
National Park Service, Department of the Interior
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
Notice details come from SAM.gov. Updated .
About this opportunity
This Special Notice from the Department of the Interior National Park Service Southeast Region concerns the Great Smoky Mountains NP REHAB BALSAM/HEINTOOGA WASTEWATER project. The notice provides details on an upcoming solicitation to replace wastewater and water lines at Balsam Mountain Campground and Heintooga Picnic Area in the Great Smoky Mountains National Park in North Carolina.
The objective is to solicit proposals to pipe burst and replace existing wastewater collection lines, replace septic and dosing tanks, conduct grading and drainage improvements, and replace waterlines. Contractors must be registered in SAM and have a Unique Entity ID to be eligible. The proposed solicitation will be issued on June 1st, with a completion date 255 days after NTP. The estimated value is between $250,000-$500,000. The notice instructs contractors to monitor the website for amendments and encourages engagement with local SBA offices to identify subcontracting opportunities.
Notice text
Great Smoky Mountains NP REHAB BALSAM/HEINTOOGA WASTEWATER
ACTION: Pre-Solicitation Notice
PRE-SOLICITATION NUMBER: 140P5323R0015
CLASSIFICATION CODE: Z1NE – MAINTENANCE OF SEWAGE AND WASTE FACILITIES
The NAICS Code for this requirement is 237110 – Water and Sewer Line Related Structures with a size standard of $39.5 million.
POINT OF CONTACT:
Geraldine Larsen, Contract Specialist, geralding_larsen@nps.gov
PLACE OF PERFORMANCE: Great Smoky Mountains National Park
PLACE OF PERFORMANCE POSTAL CODE: Cherokee, NC 28719
PLACE OF PERFORMANCE STATE AND COUNTY: North Carolina, Swain County
Title of Project: Wastewater/Water Line Replacement Project
Balsam Mountain Campground/Heintooga Picnic Area
Description: National Park Service, Balsam Mountain Campground Wastewater Collection System has the need for a contractor to pipe burst the existing 6-inch wastewater collection system; and replace it with new 8" HDPE sewer lines. The existing manholes will be replaced where noted on the plans. Septic and Dosing Tanks, in addition to the pipe replacement, the septic tank and dosing tank will be serviced and partially refurbished. New access castings and dosing pumps are to be provided. Grading and Drainage Improvements, there is a drainage channel located above the eastern sand filter that is to direct stormwater runoff around the sand filter, which has been breached. The drainage channel and the area above it needs to be re-graded to divert stormwater around the filter. The scope of work includes replacing the existing 2-inch waterline to the Heintooga Picnic Area; and the 4-inch PVC waterline to the Balsam Mountain Campground with new High-density Polyethylene (HDPE) waterlines. The 2-inch water services to the existing Comfort Stations will also be replaced with 2-inch HDPE waterlines. The service lines will be installed up to the existing valve boxes outside of the Comfort Stations. The valve and box for the Comfort Stations will also be replaced as part of this work. The 3/4-inch service lines from the main to the original drinking fountains are also included in the scope of work. The service lines to the Ranger Station will be completely replaced all the way to the building, including all pipe, valves, and valve boxes.
GENERAL:
The National Park Service (NPS), Great Smoky Mountains National Park
The solicitation will be issued electronically on the website at https://www.sam.gov/. Proposal documents will be available for download in Microsoft Word, HTML, Microsoft Excel, and Adobe PDF; Specifications will be available in Adobe PDF format; and drawings will be available in PDF format. Please Note: Paper copies of the solicitation will not be made available.
Vendors can search for opportunities and award history on https://www.sam.gov/ without registering. Registering provides the opportunity to receive notifications; this is a tool of convenience only and does not serve as a guarantee of notification. Interested vendors and plan holders are required to visit the website periodically to check for amendments and other changes to the synopsis or solicitation documents. Prospective offerors desiring to conduct business with the DOI are required to have an active registration in the Systems for Awards Management (SAM) at https://www.sam.gov/. You are also required to have a Unique Entity number in order to conduct business with the Federal Government.
This pre-solicitation announcement is not a solicitation document, but pre-notice of an upcoming solicitation. Specific instructions on submitting your proposal will be contained in the solicitation documents to be issued on or after the date listed below.
Proposed Solicitation Issue Date: June 1, 2023
Description:
Balsam Mountain Campground Wastewater Collection System
It is proposed to pipe burst the existing 6-inch wastewater collection system; and replace it
with new 8" HDPE sewer lines. The existing manholes will be replaced where noted on the
plans. Septic and Dosing Tanks: In addition to the pipe replacement, the septic tank and dosing tank will be serviced and partially refurbished. New access castings and dosing pumps are to be provided. Grading and Drainage Improvements: There is a drainage channel located above the eastern sand filter that is to direct stormwater runoff around the sand filter, which has been breached. The drainage channel and the area above it needs to be re-graded to divert stormwater around the filter.
Waterlines: The scope of work includes replacing the existing 2-inch waterline to the Heintooga Picnic Area; and the 4-inch PVC waterline to the Balsam Mountain Campground with new High-density Polyethylene (HDPE) waterlines. The 2-inch water services to the existing Comfort
Stations will also be replaced with 2-inch HDPE waterlines. The service lines will be
installed up to the existing valve boxes outside of the Comfort Stations. The valve and box
for the Comfort Stations will also be replaced as part of this work. The 3/4-inch service lines
from the main to the original drinking fountains are also included in the scope of work. The
service lines to the Ranger Station will be completely replaced all the way to the building,
including all pipe, valves and valve boxes.
36.204 Disclosure of the magnitude of construction projects: (d) Between $250,000 and $500,000.
Completion Date: 255 calendar days after issuance of Notice to Proceed (NTP)
It is the policy of the government to provide maximum practicable opportunities in its acquisitions to small business, veteran-owned small business, small, disadvantaged business, and women-owned small business concerns. Such concerns must also have the maximum practicable opportunity to participate as subcontractors in the contracts awarded by any executive agency, consistent with efficient contract performance. All offerors are strongly encouraged to contact their local Small Business Administration Office, to post their need for qualified subcontractors at http://www.sba.gov.
Construction Contraction Administration
Federal Acquisition Regulation (FAR) 36.211(b) requires agencies provide description of policies and procedures that apply to definitization of equitable adjustments for change orders under construction contracts and data on the time required to definitize equitable adjustments for change orders under construction contracts. This information can be found at: https://www.doi.gov/pa
NO PHONE CALLS ACCEPTED
Notice history
| Notice | Type | Posted |
|---|---|---|
| Great Smoky Mountain NP WASTEWATER System | Award Notice | |
| Great Smoky Mountain NP WASTEWATER System | Solicitation | |
| This notice | Special Notice |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| GRSM 321788 - Oconaluftee River Trail | — | No set-aside | |
| Oconaluftee Waterline Replacement | Forest Service | Total Small Business | |
| White Horse Hill National Game Preserve Water Main Extension | — | Total Small Business | |
| GRTE 237343 - Rehab 4 Lazy F Ranch | National Office | Total Small Business | |
| East Bear Creek Pumping Plant and Pipeline Moderni | — | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity