GPO G-Street Sidewalk Repair
Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest special notice from .
- Solicitation number
- 040ADV-26-R-0010
- Agency
-
Government Publishing Office
- Responses due
- Not on record
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 238190 Other Foundation, Structure, and Building Exterior Contractors
- Place of performance
- District of Columbia 20401, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Government Publishing Office is seeking contractor services for the repair and renovation of the G Street Sidewalk and vault structure at its headquarters located at 732 North Capitol Street NW, Washington, D.C. The scope of work encompasses demolition and installation of sidewalk slabs, as well as comprehensive repair of vault beams, concrete slabs, waterproofing membranes, columns, and related structures to eliminate water migration into the basement. Key contract requirements include obtaining all necessary permits and approvals, submitting a detailed construction schedule within 10 days of the Notice to Proceed, developing a traffic control plan compliant with MUTCD standards, implementing a comprehensive site safety plan addressing OSHA compliance, and providing a Performance Bond equal to 100 percent of contract value. The evaluation will be conducted using a Lowest Price Technically Acceptable (LPTA) methodology, assessing proposals on technical capabilities and schedule, key personnel qualifications including a Project Manager with 10 years of experience, a Quality Control/Site Superintendent with 7 years of experience, and a Safety Lead with 5 years of experience, as well as past performance on similar projects within the last five years. The formal solicitation is expected to be posted on SAM.gov on or about May 11, 2026.
This procurement carries no set-aside designations and does not identify any incumbent contractors or current service providers. The project period of performance is 18 months from the issuance of the Notice to Proceed, encompassing all preconstruction requirements and construction completion. Material deliveries must be coordinated between 7:00 AM and 2:00 PM on weekdays with 48 hours advance notice for any schedule changes. Security protocols require contractors to obtain GPO Visitor's Badges, maintain constant escort or line-of-sight supervision within the facility, establish work site fencing, and secure all basement openings daily. No specific budget range or estimated award value is provided in the pre-solicitation notice at this time.
Notice text
This is a pre-solicitation synopsis for a competitive solicitation that GPO intends to post on SAM.gov on or about May 11, 2026. The scope of work includes:
The concrete sidewalk and the vault structure beneath the G Street Sidewalk are showing signs of moderate to severe deterioration of the concrete and the encased structural framing. Over time and a failure of the waterproofing membrane, salt water, and other liquids constantly migrate into the reinforced slab and cause deterioration substantial damages.
The contractor shall provide the labor, material, equipment, and supervision to demolish and install the sidewalk slab and to repair and renovate the vaults beams, concrete slab, waterproofing membrane, and columns and other related structures to eliminate the water migration into the basement. All the work shall be in accordance with the design drawings and specifications prepared and submitted along with this statement of work. The contractor is required to obtain permits, traffic control plans, safety, and security approval prior to construction starting.
The contractor shall complete the following tasks as part of the project at the GPO G Street Sidewalk Repair:
Pre-Construction Tasks
- Obtain all required permits and approvals.
- Submit project schedule, safety plan, and traffic control plan.
- Coordinate with GPO project management and stakeholders.
- Conduct pre-construction meetings and site walkthrough.
Site Preparation & Demolition
- Install temporary barriers, signage, and traffic control measures.
- Set up designated staging and material storage areas.
- Perform selective demolition of existing structures as required.
- Ensure safe removal and disposal of construction debris.
Material Delivery & Logistics
- Coordinate material deliveries in compliance with schedule.
- Inspect and verify all materials upon arrival.
- Store materials in designated secure areas.
Construction & Installation
- Perform site grading and preparation, if applicable.
- Install structural components, framing, and support systems.
- Complete mechanical, electrical, and plumbing (MEP) installations.
- Install architectural finishes, including flooring, ceilings, and walls.
- Implement weatherproofing and insulation systems as required.
- Conduct equipment and systems testing to ensure functionality.
Safety & Compliance
- Maintain compliance with OSHA and other regulatory standards.
- Implement and monitor safety protocols for workers and pedestrians.
- Address any environmental concerns, including hazardous material handling.
Quality Control & Inspections
- Conduct periodic quality control checks.
- Submit required inspection and testing reports.
- Address any deficiencies noted in inspections.
Project Closeout
- Complete all final construction activities and finishing work.
- Conduct a final walkthrough with the GPO project team.
- Prepare and submit as-built drawings and O&M manuals.
- Resolve punch list items and obtain final acceptance.
- Restore site and remove temporary facilities.
- Submit final project documentation, including warranties and certifications
Period of Performace is eighteen (18) months from Notice to Proceed.
A site visit will be scheduled and listed in the solicitation.
Files
| File | Type | Posted |
|---|---|---|
| SOW G Street Sidewalk.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| GPO G-Street Sidewalk Repair | Award Notice | |
| GPO G-Street Sidewalk Repair | Special Notice | |
| GPO G-Street Sidewalk Repair | Special Notice | |
| GPO G-Street Sidewalk Repair | Special Notice | |
| GPO G-Street Sidewalk Repair | Solicitation | |
| This notice | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity