Glendo-Lusk Rural Tap 115kV Transmission Line Upgrade and Quinn Creek Substation

Closed Pre-Solicitation Posted

Not the latest version. See the latest solicitation from .

Solicitation number
89503226BWA000073
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

More information

Notice details come from SAM.gov. Updated .

About this opportunity

The Western Area Power Administration, Rocky Mountain Region, intends to solicit via sealed-bid invitation for bid (IFB) a contractor to upgrade approximately 35 miles of transmission line and construct a new substation, with responses due by July 24, 2026. No set-aside applies. All bids must be submitted through FedConnect only; email submissions will not be accepted.

Work is performed in Platte and Niobrara counties, Wyoming. The project upgrades the existing Glendo-Lusk Rural Tap 69-kV transmission line to 115-kV and constructs a new Quinn Creek Substation on approximately 5 acres of open rangeland in Niobrara County. The upgrade begins at Glendo Substation, runs northeast for 25.4 miles to the new Quinn Creek Substation, then continues northeast for 3 miles and east for 6 miles to terminate at Lusk Rural Tap west of Lusk. The work consists of replacing the existing line with a new 115-kV wood pole H-frame transmission line and installing a 69-kV delivery point at Quinn Creek.

The contractor shall provide labor, materials, tools, equipment, transportation, and other resources necessary to complete the project. The work addresses deteriorating conditions on the existing 69-kV line and aligns with WAPA's mission to provide reliable and cost-efficient electric power.

NAICS 237130 (Power and Communication Line and Related Structures Construction); PSC Y1PZ (Construction of Other Non-Building Facilities).

Notice text

2 versions

Update #2 · Latest ·

NOTE: This will be a Sealed Bidding Solicitation, all responses to this Invitation For Bid (IFB) shall be submitted via FedConnect ONLY. Email proposals WILL NOT be accepted.

The Western Area Power Administration (WAPA, Rocky Mountain Region (RMR) has a requirement for a Contractor to provide labor, materials, tools, equipment, transportation, and other resources necessary to complete this project.

The Glendo-Lusk Rural Tap 115kV Transmission Line Upgrade and new Quinn Creek Substation projects aim to enhance WAPA’s ability to provide reliable and cost-efficient electric power, aligning with WAPA’s mission. WAPA benefits from the transmission line upgrades by resolving deteriorating conditions on the existing Glendo – Lusk Rural Tap 69kV line.

The principal components of work include the following:
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR) is proposing to upgrade 35 miles of its Lusk Rural Tap-Glendo (LRT- GLD) 69-kV transmission line to a 115-kV transmission line (Upgrade) in Platte and Niobrara counties, Wyoming and construct a new substation located in Niobrara County, Wyoming. The Upgrade starts at the Glendo Substation (GLD) and runs generally northeast for approximately 25 miles (25.4 miles). A new substation and delivery point named Quinn Creek Substation (QCK) will be constructed in this location. From the QCK Substation, the Upgrade will continue in a northeast direction for approximately 3 miles, it would then run east for approximately 6 miles and terminate at WAPA’s Lusk Rural Tap (LRT) just west of the town of Lusk.

The Upgrade consists of replacing the LRT-GLD line with a new 115-kV wood pole H-frame transmission line. The new Quinn Creek Substation (QCK), with a 69-kV delivery point, will be constructed on about 5 acres on open rangeland. The Upgrade will be sectionalized into a 25.4-mile-long section called Casper (Pace)-Quinn Creek (CPL-QCK), a 9.4-mile-long Quinn Creek-Lusk Rural Tap (QCK-LRT) will be constructed to 115-kV specifications but operated at 69-kV for the near term. The Upgrade will be constructed on existing ROW, widened by 20 to 25 feet to provide proper clearance for the higher voltage, lengthened spans, and potentially greater blow-out.

Location:
Platte and Niobrara, 82213, 82227, 82225
Glendo Substation (GLD) - 524 Glendo Park Road, Glendo, WY 82213
Lusk Rural Tap (LRT) - Latitude: N 42° 46' 0"; Longitude: W 104° 28' 52"; Datum: NAD83/WGS84
Quinn Creek Substation - New Substation, approximately 25 miles Northeast from Glendo Substation

The anticipated period of performance is 800 days calendar days after Notice to Proceed or by December 2028. The estimated magnitude of construction is greater than $10M. FAR Part 14 is being utilized for this requirement. The solicitation will be issued as a 100% small business set-aside. The applicable NAICS Code is 237130; Size Standard is $45.0M.

The solicitation including specifications and drawings will be issued electronically on or about 15 June 2026 at the following sites:
https://www.fedconnect.net and https://www.sam.gov.

NOTE: The Buy American Act applies to the solicitation. Refer to FAR Clause 52.225-9 (Section I) and FAR Provision 52.225-10 (Section L) if any non-domestic material will be proposed. Bidders must identify any non-domestic materials (not manufactured in United States) included in their bid. Please check with your suppliers and subcontractors to verify whether or not their quotes include non-domestic material.

Please see the link for Construction Change Order Definitization Notices -
https://www.wapa.gov/DoingBusiness/SmallBusiness/Pages/small-business.aspx

Update #1 ·

NOTE: This will be a Sealed Bidding Solicitation, all responses to this Invitation For Bid (IFB) shall be submitted via FedConnect ONLY. Email proposals WILL NOT be accepted.

The Western Area Power Administration (WAPA, Rocky Mountain Region (RMR) has a requirement for a Contractor to provide labor, materials, tools, equipment, transportation, and other resources necessary to complete this project.

The Glendo-Lusk Rural Tap 115kV Transmission Line Upgrade and new Quinn Creek Substation projects aim to enhance WAPA’s ability to provide reliable and cost-efficient electric power, aligning with WAPA’s mission. WAPA benefits from the transmission line upgrades by resolving deteriorating conditions on the existing Glendo – Lusk Rural Tap 69kV line.

The principal components of work include the following:
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR) is proposing to upgrade 35 miles of its Lusk Rural Tap-Glendo (LRT- GLD) 69-kV transmission line to a 115-kV transmission line (Upgrade) in Platte and Niobrara counties, Wyoming and construct a new substation located in Niobrara County, Wyoming. The Upgrade starts at the Glendo Substation (GLD) and runs generally northeast for approximately 25 miles (25.4 miles). A new substation and delivery point named Quinn Creek Substation (QCK) will be constructed in this location. From the QCK Substation, the Upgrade will continue in a northeast direction for approximately 3 miles, it would then run east for approximately 6 miles and terminate at WAPA’s Lusk Rural Tap (LRT) just west of the town of Lusk.

The Upgrade consists of replacing the LRT-GLD line with a new 115-kV wood pole H-frame transmission line. The new Quinn Creek Substation (QCK), with a 69-kV delivery point, will be constructed on about 5 acres on open rangeland. The Upgrade will be sectionalized into a 25.4-mile-long section called Casper (Pace)-Quinn Creek (CPL-QCK), a 9.4-mile-long Quinn Creek-Lusk Rural Tap (QCK-LRT) will be constructed to 115-kV specifications but operated at 69-kV for the near term. The Upgrade will be constructed on existing ROW, widened by 20 to 25 feet to provide proper clearance for the higher voltage, lengthened spans, and potentially greater blow-out.

Location:
Platte and Niobrara, 82213, 82227, 82225
Glendo Substation (GLD) - 524 Glendo Park Road, Glendo, WY 82213
Lusk Rural Tap (LRT) - Latitude: N 42° 46' 0"; Longitude: W 104° 28' 52"; Datum: NAD83/WGS84
Quinn Creek Substation - New Substation, approximately 25 miles Northeast from Glendo Substation

The anticipated period of performance is 800 days calendar days after Notice to Proceed or by December 2028. The estimated magnitude of construction is greater than $10M. FAR Part 14 is being utilized for this requirement. The solicitation will be issued as a 100% small business set-aside. The applicable NAICS Code is 237130; Size Standard is $45.0M.

The solicitation including specifications and drawings will be issued electronically on or about 1 June 2026 at the following sites:
https://www.fedconnect.net and https://www.sam.gov.

NOTE: The Buy American Act applies to the solicitation. Refer to FAR Clause 52.225-9 (Section I) and FAR Provision 52.225-10 (Section L) if any non-domestic material will be proposed. Bidders must identify any non-domestic materials (not manufactured in United States) included in their bid. Please check with your suppliers and subcontractors to verify whether or not their quotes include non-domestic material.

Please see the link for Construction Change Order Definitization Notices -
https://www.wapa.gov/DoingBusiness/SmallBusiness/Pages/small-business.aspx

Notice history

Notice Type Posted
Glendo-Lusk Rural Tap and Quinn Creek Substation Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, Wyoming Mc Kinnon, Wyoming 82935, United States · NAICS 237110 Forest Service Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors