Garrison Dam Spillway Approach Dredge
Closed Solicitation Posted
This opportunity was awarded. See its 2 award notices in the notice history.
- Solicitation number
- W9128F24B0010
- Agency
- ENDIST Omaha US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z2KA Repair Or Alteration Of Dams
- Place of performance
- Riverdale, North Dakota 58565, United States
- Points of contact
-
- Nadine Catania nadine.l.catania@usace.army.mil (402) 263-2603
- Chase Willson chase.t.willson2@usace.army.mil (402) 293-6029
- Jessica R Jackson jessica.r.jackson@usace.army.mil (402) 995-2052
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Engineering District Omaha is seeking a contractor to perform the Garrison Dam Spillway Approach Dredge project, which involves comprehensive rehabilitation work including dredging, riprap placement, drainage structure construction, and slope repair. The procurement will be executed through a two-step sealed bidding process under FAR Part 14.5, with Step-One focusing on technical proposals and Step-Two involving sealed price bids. Technical proposals are due by August 9, 2024, and the government will evaluate submissions based on technical merit and compliance with project specifications. Contractors must demonstrate technical capability and safety compliance, with specific requirements for site safety procedures, hazard analysis, and qualified personnel. The technical proposal phase does not require bid bonds, which will be mandatory during the subsequent sealed bid stage.
The contract is exclusively set aside for small businesses under NAICS code 237990 (Other Heavy and Civil Engineering Construction), specifically targeting firms with expertise in dam and civil infrastructure rehabilitation. The project will be performed in Riverdale, North Dakota, with the work location being the Garrison Dam Spillway Approach area. Based on the bid abstract documents, potential award values range between $19.7 million and $25 million for base bid items, with an additional option bid item range of approximately $897,000 to $3.6 million. Two potential contractors have been identified in preliminary documents: Dubuque Barge & Fleeting Service Co. and HSG Park JV 2 LLC. The project timeline suggests construction activities will occur in the late summer or early fall of 2024, with specific durations to be defined in the final contract award.
Notice text
5 versions
Update #5 · Latest ·
**Step Two re-accomplished and bid abstract provided in the attachments section below.**
***UPDATE 27 AUGUST 2024: In accordance with FAR 14.503-2(b), the following contractors submitted an acceptable Step-One proposal:
DUBUQUE BARGE AND FLEETING SERVICE dba NEWT MARINE SERVICE (Dubuque, IA)
HSG PARK JOINT VENTURE 2, LLC (Harvey, ND)
**31 JULY 24 - Bubbler Info posted in Attachments in response to ProjNet BI 10914669**
**AM0001 posted. No extension**
Garrison Spillway Approach Dredge
THIS SOLICITATION AND RESULTING CONTRACT IS UTLIZING A TWO-STEP SEALED BIDDING PROCUREMENT METHOD AS DESCRIBED IN FAR PART 14.5. IN ADDITION, THIS SOLICITATION PORTION IS THE STEP-ONE, WHICH IS A REQUEST FOR TECHNICAL PROPOSALS ONLY.
BID BONDS ARE NOT REQUIRED TO BE SUBMITTED WITH THE STEP-ONE TECHNICAL PROPOSAL. BID BONDS ARE REQUIRED TO BE SUBMITTED WITH THE STEP-TWO SEALED BID.
THIS SOLICITATION IS 100% SET-ASIDE FOR SMALL BUSINESS UNDER NAICS 237990.
Update #4 ·
***UPDATE 27 AUGUST 2024: In accordance with FAR 14.503-2(b), the following contractors submitted an acceptable Step-One proposal:
DUBUQUE BARGE AND FLEETING SERVICE dba NEWT MARINE SERVICE (Dubuque, IA)
HSG PARK JOINT VENTURE 2, LLC (Harvey, ND)
**31 JULY 24 - Bubbler Info posted in Attachments in response to ProjNet BI 10914669**
**AM0001 posted. No extension**
Garrison Spillway Approach Dredge
THIS SOLICITATION AND RESULTING CONTRACT IS UTLIZING A TWO-STEP SEALED BIDDING PROCUREMENT METHOD AS DESCRIBED IN FAR PART 14.5. IN ADDITION, THIS SOLICITATION PORTION IS THE STEP-ONE, WHICH IS A REQUEST FOR TECHNICAL PROPOSALS ONLY.
BID BONDS ARE NOT REQUIRED TO BE SUBMITTED WITH THE STEP-ONE TECHNICAL PROPOSAL. BID BONDS ARE REQUIRED TO BE SUBMITTED WITH THE STEP-TWO SEALED BID.
THIS SOLICITATION IS 100% SET-ASIDE FOR SMALL BUSINESS UNDER NAICS 237990.
Update #3 ·
**31 JULY 24 - Bubbler Info posted in Attachments in response to ProjNet BI 10914669**
**AM0001 posted. No extension**
Garrison Spillway Approach Dredge
THIS SOLICITATION AND RESULTING CONTRACT IS UTLIZING A TWO-STEP SEALED BIDDING PROCUREMENT METHOD AS DESCRIBED IN FAR PART 14.5. IN ADDITION, THIS SOLICITATION PORTION IS THE STEP-ONE, WHICH IS A REQUEST FOR TECHNICAL PROPOSALS ONLY.
BID BONDS ARE NOT REQUIRED TO BE SUBMITTED WITH THE STEP-ONE TECHNICAL PROPOSAL. BID BONDS ARE REQUIRED TO BE SUBMITTED WITH THE STEP-TWO SEALED BID.
THIS SOLICITATION IS 100% SET-ASIDE FOR SMALL BUSINESS UNDER NAICS 237990.
Update #2 ·
**AM0001 posted. No extension**
Garrison Spillway Approach Dredge
THIS SOLICITATION AND RESULTING CONTRACT IS UTLIZING A TWO-STEP SEALED BIDDING PROCUREMENT METHOD AS DESCRIBED IN FAR PART 14.5. IN ADDITION, THIS SOLICITATION PORTION IS THE STEP-ONE, WHICH IS A REQUEST FOR TECHNICAL PROPOSALS ONLY.
BID BONDS ARE NOT REQUIRED TO BE SUBMITTED WITH THE STEP-ONE TECHNICAL PROPOSAL. BID BONDS ARE REQUIRED TO BE SUBMITTED WITH THE STEP-TWO SEALED BID.
THIS SOLICITATION IS 100% SET-ASIDE FOR SMALL BUSINESS UNDER NAICS 237990.
Update #1 ·
Garrison Spillway Approach Dredge
THIS SOLICITATION AND RESULTING CONTRACT IS UTLIZING A TWO-STEP SEALED BIDDING PROCUREMENT METHOD AS DESCRIBED IN FAR PART 14.5. IN ADDITION, THIS SOLICITATION PORTION IS THE STEP-ONE, WHICH IS A REQUEST FOR TECHNICAL PROPOSALS ONLY.
BID BONDS ARE NOT REQUIRED TO BE SUBMITTED WITH THE STEP-ONE TECHNICAL PROPOSAL. BID BONDS ARE REQUIRED TO BE SUBMITTED WITH THE STEP-TWO SEALED BID.
THIS SOLICITATION IS 100% SET-ASIDE FOR SMALL BUSINESS UNDER NAICS 237990.
Attachments
Notice history
| Notice | Type | Posted |
|---|---|---|
| Garrison Dam Spillway Approach Dredge | Award Notice | |
| Garrison Dam Spillway Approach Dredge | Award Notice | |
| Garrison Dam Spillway Approach Dredge | Solicitation | |
| Garrsion Dam Spillway Approach Dredge | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity