This document is a Bid Abstract for solicitation W9128F24B0010 for the Garrison Spillway Approach Rehabilitation project. The solicitation is a two-step sealed bid process under NAICS code 237990, which is 100% set-aside for small businesses.
The Bid Abstract lists the 15 base bid items and 1 option bid item, including estimated quantities, unit prices, and extended amounts for three offerors: the Government Estimate, HSG Park JV, and Newt Marine. The total base bid amounts range from $19,729,504.80 to $25,002,774.80, and the total option bid amounts range from $897,388.50 to $3,652,162.50. The project involves various riprap, spall, bedding, filter aggregate, dredging, and construction work to rehabilitate the Garrison Dam spillway approach. The work is to be performed for the U.S. Army Corps of Engineers, Omaha District. The bid opening date was September 19, 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. DATE ISSUED 3. DATE OPENED PAGE 1 OF 1
9-Jul-24 19-Sep-24 l PAGES
DATE SIGNED
X C. REASONABLE CONTRACT
7A. 7B. 7C. 7D. 7E. 7F. 7E. F. 7E. F.
ITEM # DESCRIPTION EST. QTY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT
BASE ITEMS
0001 Mobilization / Demobilization 1 JOB 93,720.00$ 93,720.00$ 2,760,000.00$ 2,760,000.00$ 2,150,000.00$ 2,150,000.00$
0002 RipRap for East Bank Slope Repairs 81675 TON 95.89$ 7,831,815.75$ 153.00$ 12,496,275.00$ 120.00$ 9,801,000.00$
0003 RipRap for Dredged Material Management Area 5736 TON 95.89$ 550,025.04$ 154.00$ 883,344.00$ 120.00$ 688,320.00$
0004 Spalls 4883 TON 188.44$ 920,152.52$ 131.00$ 639,673.00$ 110.00$ 537,130.00$
0005 Bedding 4523 TON 185.89$ 840,780.47$ 125.00$ 565,375.00$ 87.80$ 397,119.40$
0006 Filter Aggregate 9887 TON 90.37$ 893,488.19$ 47.00$ 464,689.00$ 59.00$ 583,333.00$
0007 Gravel Road Surfacing 591 TON 62.79$ 37,108.89$ 72.00$ 42,552.00$ 55.50$ 32,800.50$
0008 Disposal of Unsuitable Material 18850 CY 12.49$ 235,436.50$ 16.80$ 316,680.00$ 10.60$ 199,810.00$
0009 Silt Fence Baffles 4900 LF 4.47$ 21,903.00$ 19.50$ 95,550.00$ 19.30$ 94,570.00$
0010 Disposal of Existing Drainage Structure 1 JOB 3,780.00$ 3,780.00$ 25,000.00$ 25,000.00$ 19,400.00$ 19,400.00$
0011 All Remaining Work to Construct New Outlet Structure and Outfall Ditch 1 JOB 868,670.00$ 868,670.00$ 273,000.00$ 273,000.00$ 120,000.00$ 120,000.00$
0012 Dredging 34+50 to 49+50 127822 CY 24.02$ 3,070,284.44$ 14.40$ 1,840,636.80$ 23.10$ 2,952,688.20$
0013 All Remaining Work to Construct Dredged Material Management Area 1 JOB 2,055,080.00$ 2,055,080.00$ 3,024,000.00$ 3,024,000.00$ 2,888,000.00$ 2,888,000.00$
0014 All Remaining Work to Rehabilitate Spillway Approach East Bank 1 JOB 2,307,260.00$ 2,307,260.00$ 1,576,000.00$ 1,576,000.00$ 1,555,000.00$ 1,555,000.00$
19,729,504.80$ 25,002,774.80$ 22,019,171.10$
0015 Dredging STA 49+50 to 62+50 69565 CY 22.45$ 1,561,734.25$ 12.90$ 897,388.50$ 52.50$ 3,652,162.50$
1,561,734.25$ 897,388.50$ 3,652,162.50$
21,291,239.05$ 25,900,163.30$ 25,671,333.60$
(Including Profit)
20%
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER
W9128F24B0010
4. ISSUING OFFICE I CERTIFY THAT I HAVE OPENED, READ AND
AND RECORDED ON THIS ABSTRACT
ALL OFFERS RECEIVED IN RESPONSE
5. PROJECT TITLE
OMAHA, NE 68102-1618
1616 CAPITOL AVENUE
CONTRACTING DIVISION (CENWO-CT)
US ARMY CORPS OF ENGINEERS
TO THIS SOLICITATION
(Without Profit)
NO. 2(Check A, B or C AND COMPLETE D, E AND F) NO. 1
A. HIRED LABOR
GOVERNMENT ESTIMATE HSG Park JVNewt Marine
5 Jones Street
A. OFFEROR
8. GOVERNMENT ESTIMATE
Cage Code: 04JE0
Harvey, ND 58341
UEI: F1JWKEL887A6
C. AMENDMENTS ACKNOWLEDGED
B. REASONABLE CONTRACT B. BID SECURITY (Type & Amount)B. BID SECURITY (Type & Amount) 20%
C. AMENDMENTS ACKNOWLEDGED
SAM ACTIVE - YesSAM ACTIVE - Yes
Dubuque, IA 52001
UEI: L9NNGHXPV7N6
GARRISON SPILLWAY APPROACH REHABILITATION
6. NUMBER OF AMENDMENTS ISSUED
Cage Code: 9KD00
SIGNATURE
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
JESSICA R. JACKSON, CONTRACTING OFFICER
A. OFFEROR
2972 25th Street NE
9. OFFERS
Total Base Bid (Sum of Items 0001 through 0014):
Total Option Bid (Sum of Item 0015):
Total Base Bid (Sum of Items 0001 through 0014) + Option Bid ( Sum of Item 0015):
19 Sep 2024